Review   Review       Date Status   Comments   
Building06/14/2016Approved The Accessibility Compliance Form states full compliance with the Virginia Construction Code. that would require 28 accessible rooms (933 x 3%). Only 21 are provided. If no accessible rooms are being removed, this project can be considered to be not an alteration to a primary function area, and box 2 can be checked. VCC Table 1107.6.1.1.
Electrical 06/13/2016Approved Please clarify the existing panel load, Plans show New rec,, new switches,
Energy 06/14/2016Approved The drawings include a Code Summary on sheet T1.0. The Code Summary does not state compliance with the 2012 Virginia Energy Conservation Code (VECC). In the resubmission, revise the Code Summary on sheet T1.0 to list the 2012 Virginia Energy Conservation Code (VECC) under Governing Codes.
Energy 06/14/2016Approved The drawings indicate that new lighting will be installed in corridors, elevator lobbies and seating areas. However, no interior lighting power calculation for these spaces have been submitted. Section C405.5.2 requires that these spaces not exceed a maximum lighting power based on either the "Building Area Method" or the "Space by Space Method.” In the resubmission, include a signed and  more...
Energy 06/14/2016Approved The permit submission indicates that new light switches, switched receptacles, lights and illuminated mirrors are part of the scope of work of the permit. Section C405.2.3 of the 2012 Virginia Energy Conservation Code (VECC) requires that a master control device is installed at the main room entry of each sleeping unit that controls all permanently installed luminaires and switched receptacles of  more...
Energy  Approved The permit submission indicates that new light switches, switched receptacles, lights and illuminated mirrors are part of the scope of work of the permit. Section C405.2.3 of the 2012 Virginia Energy Conservation Code (VECC) requires that a master control device is installed at the main room entry of each sleeping unit which controls all permanently installed luminaires and switched receptacles  more...
Plumbing 06/08/2016Approved Plans seem to show tub-to-shower conversion drain area is the same as original with new trench drain in location as old. Please confirm there is no additional piping from the floor below to re-route new drains for tub area. If there is please note and confirm details
Plumbing 06/07/2016Approved Pg T4.0-#4 Seem to show End Walls Controls in wrong areas. Please advise or correct ANSI 117.1 607.5
Structural 06/15/2016Approved Note: Statement of special inspection attached, does not apply to this permit number since no structural work.