Search for Permits

Use the search below to get details on plan review activities and review comments on your plans. This information is updated Monday through Friday at 12:30 p.m. and 5:30 p.m.

Information returned on this page is valid through 6/27/2022. Incorporating the new permitting system data into this website is in progress. For current data requests, please contact PermitTechSupport@arlingtonva.us

 
Permit #B2001305
Address4770 LEE HWY
TypeCNEW
StatusFINALED
Permit HolderTRINITY GROUP CONSTRUCTION INC
OwnerALPINE INVESTMENT HOLDINGS LLC
Applied Date06/10/2020
Approved Date01/14/2021
Date Issued01/14/2021
DescriptionNEW 3 STORY BUILDING FOR USE AS A DAY CARE CENTER OVER A 1 LEVEL BELOW GRADE PARKING STRUCTURE SPECIAL INSPECTION REQUIRED

View Event Log.      View Status.    View Required Plan Review       View Printer Version.

Review   Review       Date Status   Comments   
Building11/30/2020Approved Sheet A-000 Cover Sheet: SUBMIT FIRE ALARM SHOP DRAWINGS FOR APPROVAL
Building11/30/2020Approved Sheet A-000 Cover Sheet: SEPARATE PLAN AND PERMIT REQUIRED FOR DOORS WITH SPECIAL LOCKING HARDWARE.
Building11/30/2020Approved Sheet A-000 Cover Sheet: SUBMIT AUTOMATIC SUPPRESSION SHOP DRAWINGS FOR APPROVAL
Building11/30/2020Approved Sheet A-000 Cover Sheet: SUBMIT FIRE ALARM SHOP DRAWINGS FOR APPROVAL
Building11/30/2020Approved Sheet A-000 Cover Sheet: SEPARATE PLAN AND PERMIT REQUIRED FOR DOORS WITH SPECIAL LOCKING HARDWARE.
Building11/30/2020Approved Sheet A-000 Cover Sheet: SUBMIT AUTOMATIC SUPPRESSION SHOP DRAWINGS FOR APPROVAL
Building11/10/2020Approved Sheet A-032 Building Envelope Components: Wall assemblies shall be constructed per UL design and ES Report, as example, required min. steel stud gauge.
Building11/10/2020Approved Sheet A-032 Building Envelope Components: Wall assemblies shall be constructed per UL design and ES Report, as example, required min. steel stud gauge.
Building11/10/2020Approved Sheet A-253 Reflected Ceiling Plan - Level 2: Detail B - Rated ceiling location should include a reference tag to wall type H on sheet A031. ---------------------------------------------------------------------------------------------------------------------- UPDATED REVIEW COMMENT 9/2/2020: I don't see the reference tag on the RCP to detail  more...
Building11/10/2020Approved Sheet A-253 Reflected Ceiling Plan - Level 2: Detail B - Rated ceiling location should include a reference tag to wall type H on sheet A031. ---------------------------------------------------------------------------------------------------------------------- UPDATED REVIEW COMMENT 9/2/2020: I don't see the reference tag on the RCP to detail  more...
Building09/03/2020Approved Sheet A-011 Project Data - Building Code Summary: Please clarify your intent for referencing open parking garage provisions. The lower garage level does not seem to comply. Provide code strategy you are intending to use to have an open parking garage on an enclosed garage with I-4 above. 2015 VUSBC  more...
Building09/03/2020Approved Sheet A-202 Floor Plan - Level 1: Corridor 109 - Refer to VUSBC 1020.2 - corridor requires 72" width if E use. See previous comment re: use classification ---------------------------------------------------------------------------------------------------------------- UPDATED REVIEW COMMENT 9/3/20: See response to this, I-4 vs. E use elsewhere. If E use discharging to first level, 72" wide  more...
Building09/03/2020Approved Sheet A-015 Egress Plans: Where did design factor of 75 come from for outdoor play area? Refer to Table 1004.1.2 - 50 gross for exercise should be load factor ------------------------------------------------------------------------------------------------------------------- UPDATED REVIEW COMMENT 9/3/2020: 75 load factor is for daycare requirement. However, building code requirement is more  more...
Building09/03/2020Approved Sheet A-202 Floor Plan - Level 1: Corridor 109 - Refer to VUSBC 1020.2 - corridor requires 72" width if E use. See previous comment re: use classification ---------------------------------------------------------------------------------------------------------------- UPDATED REVIEW COMMENT 9/3/20: See response to this, I-4 vs. E use elsewhere. If E use discharging to first level, 72" wide  more...
Building09/03/2020Approved Sheet A-015 Egress Plans: Where did design factor of 75 come from for outdoor play area? Refer to Table 1004.1.2 - 50 gross for exercise should be load factor ------------------------------------------------------------------------------------------------------------------- UPDATED REVIEW COMMENT 9/3/2020: 75 load factor is for daycare requirement. However, building code requirement is more  more...
Building09/03/2020Approved Sheet A-011 Project Data - Building Code Summary: Please clarify your intent for referencing open parking garage provisions. The lower garage level does not seem to comply. Provide code strategy you are intending to use to have an open parking garage on an enclosed garage with I-4 above. 2015 VUSBC  more...
Building09/02/2020Approved Sheet A-202 Floor Plan - Level 1: Confirm overhead gate to lower parking level is open during business hours. If closed, 2 facilities are created requiring accessible parking below grade ----------------------------------------------------------------------------------------------------------------------- UPDATED REVIEW COMMENT 9/2/2020: 1106.6, Exception 1 refers to one parking facility with  more...
Building09/02/2020Approved Sheet A-011 Project Data - Building Code Summary: Please confirm that only I-4 daycare is use and no E use. I-4 is custodial care children and infants under 2 1/2. E use is children over 2 1/2 needing only personal care. The big difference is corridors require 72" width (Table 1020.2) for E use over 100. You have some corridors that may need to be  more...
Building09/02/2020Approved Sheet A-301 Exterior Elevations: Please show how EIFS complies with section 1406.2, VUSBC 2015. --------------------------------------------------------------------------------------------------------------------- UPDATED REVIEW COMMENT 9/2/2020: See new, general comment regarding request to provide ICC ES report for product.
Building09/02/2020Approved Sheet A-203 Floor Plan - Level 2: Door 224B cannot exit to the exterior and back into the interior, as one of the means of egress from room 327. It must exit into the interior. VMC 1031.3 ---------------------------------------------------------------------------------------------------------------------- UPDATED REVIEW COMMENT 9/2/2020: Snow melt or cover over egress path will need to be  more...
1 2 3 4 5 6 7 8 9 10 ...
Label

Search Again
Search Permits By:   Address
Permit Number
Date