DES:Water/Sewer Engineering | 03/01/2021 | Approved |
ACTIVE REVISION
|
DES:Water/Sewer Engineering | 12/03/2020 | Approved |
SHEETING AND SHORING/EXCAVATION PERMIT ONLY
BLDG PERMIT APPLICATION IS CNEW15078 AND BLDG PERMIT NUMBERS IS B2001305
CEP NUMBER IS B2001305
|
Electrical | 12/31/2020 | No review required |
--N/A--
|
EPlan Review | 01/14/2021 | Approved |
--N/A--
|
Fire Prevention | 12/31/2020 | No review required |
--N/A--
|
Mechanical | 12/31/2020 | No review required |
--N/A--
|
Plumbing | 12/31/2020 | No review required |
--N/A--
|
Preconstruction Meeting | 11/19/2020 | Approved |
Meeting held 11/19/2020 for BLDG & SOE permits.
|
Structural | 11/30/2020 | Approved |
Arlington County Statement of special inspection for sheeting and shoring shall be submitted.
|
Structural | 11/30/2020 | Approved |
If protection for pedestrians is included in this permit, as required by 3306 IBC (construction fence or railings), add the details to these drawings. If not, add a note to the drawings that pedestrian protection is by others (the excavation shall not commence until the protection is in place).
|
Structural | 11/30/2020 | Approved |
Significant dewatering is required as indicted at the geotechnical report. Add this information to the drawing unless it is not covered by this permit. If a separate permit is used for the dewatering, submit that system and obtain that permit before starting the excavation.
|
Structural | 11/30/2020 | Approved |
At least ten days before the start of excavation, insure that written notice of the start of excavation has been given to the adjacent building owners per 3307.1
|
Structural | 11/30/2020 | Approved |
Arlington County Statement of special inspection for sheeting and shoring shall be submitted.
|
Structural | 11/30/2020 | Approved |
If protection for pedestrians is included in this permit, as required by 3306 IBC (construction fence or railings), add the details to these drawings. If not, add a note to the drawings that pedestrian protection is by others (the excavation shall not commence until the protection is in place).
|
Structural | 11/30/2020 | Approved |
Significant dewatering is required as indicted at the geotechnical report. Add this information to the drawing unless it is not covered by this permit. If a separate permit is used for the dewatering, submit that system and obtain that permit before starting the excavation.
|
Structural | 11/30/2020 | Approved |
At least ten days before the start of excavation, insure that written notice of the start of excavation has been given to the adjacent building owners per 3307.1
|
Zoning | 12/07/2020 | Approved |
B2002570 CNEW-21443
4770 Lee Hwy (The Children’s School)
C-2
Excavation, sheeting, and shoring permit for The Children’s School.
A new three-story childcare center/school with in-ground garage (18,327 sf).
Use permit #U-3515-18-1
(Approved)
1. Outline of excavation matches.
2. All excavation is on the property.
|
Zoning | 12/07/2020 | Approved |
Please note the TMP must be submitted and approved to the zoning office prior to the issuance of the Certificate of Occupancy for childcare use per Condition 5 of Use Permit U-3515-18-1.
|
Zoning | 12/07/2020 | Approved |
B2002570 CNEW-21443
4770 Lee Hwy (The Children’s School)
C-2
Excavation, sheeting, and shoring permit for The Children’s School.
A new three-story childcare center/school with in-ground garage (18,327 sf).
Use permit #U-3515-18-1
(Approved)
1. Outline of excavation matches.
2. All excavation is on the property.
|
Zoning | 12/07/2020 | Approved |
Please note the TMP must be submitted and approved to the zoning office prior to the issuance of the Certificate of Occupancy for childcare use per Condition 5 of Use Permit U-3515-18-1.
|