Building | 04/29/2021 | Approved |
Sheet Revision Narrative of Changes to Permit: Revision Narrative 15 April 2021 29 April 2021
Item 2: There is no requirement that the affected wall be fire rated.
|
Building | 03/25/2021 | Approved |
A-000 Architectural Cover Sheet 15 March 2021
SUBMIT AUTOMATIC SUPPRESSION SHOP DRAWINGS FOR APPROVAL
SUBMIT FIRE ALARM SYSTEM SHOP DRAWINGS FOR APPROVAL
|
Building | 03/25/2021 | Approved |
A-000 Architectural Cover Sheet 15 March 2021
SUBMIT AUTOMATIC SUPPRESSION SHOP DRAWINGS FOR APPROVAL
SUBMIT FIRE ALARM SYSTEM SHOP DRAWINGS FOR APPROVAL
|
DES:Water/Sewer Engineering | 02/17/2021 | Approved |
40 NEW DFU'S
|
Electrical | 02/09/2021 | Approved |
Code cycle is 2014 NEC. shown as NEC 2011 on sheet A-000,
|
Electrical | 02/09/2021 | Approved |
Drawing list shows 7 electrical sheets, E sheets show 8 electrical sheets, Sheet E-104 Electrical roof plan is missing from the drawing List.
|
Electrical | 02/09/2021 | Rejected |
Code cycle is 2014 NEC. shown as NEC 2011 on sheet A-000,
|
Electrical | 02/09/2021 | Rejected |
Drawing list shows 7 electrical sheets, E sheets show 8 electrical sheets, Sheet E-104 Electrical roof plan is missing from the drawing List.
|
Electrical | 02/09/2021 | Approved |
Code cycle is 2014 NEC. shown as NEC 2011 on sheet A-000,
|
Electrical | 02/09/2021 | Approved |
Drawing list shows 7 electrical sheets, E sheets show 8 electrical sheets, Sheet E-104 Electrical roof plan is missing from the drawing List.
|
Energy | 02/17/2021 | Approved |
The architectural drawings indicate that new building thermal envelope (BTE) doors (101 and 102) are part of the scope of the permit. It is unclear if these doors satisfy the U-factor and SHGC requirements of Table C402.4 of the 2015 Virginia Energy Conservation Code (VECC). In addition, it is unclear if the new BTE doors will satisfy the air infiltration requirements of Table C402.5.2 of the more...
|
Energy | 02/17/2021 | Approved |
Sheet E-703 includes an interior lighting COMcheck. The COMcheck appears to be incorrect in the following ways. First, there are exemptions claimed for several fixtures of the K and D type. Section C405.4 of the 2015 VECC does not allow for these fixtures to be exempt from the calculation. These emergency lighting fixtures are not exempt from the calculation because they are also used for more...
|
Energy | 02/17/2021 | Approved |
Sheet P-702 includes a water heater detail. This drawing indicates that a hot water recirculation system is part of the scope of the permit. The pump is required by section C404.6.1 of the 2015 VECC to be fitted with automatic controls to turn off the recirculation pump when there is no hot water demand. In the resubmission, show automatic controls that will shut down the hot water more...
|
Energy | 02/17/2021 | Approved |
The drawings indicate that walk-in coolers are part of the scope of the permit. The drawings do not call for cooler walls, floors and ceilings with R-values that satisfy the minimum requirements of section C403.2.16 of the 2015 VECC. In the resubmission, revise the drawings to satisfy the minimum R-value requirements of section C403.2.16 of the 2015 VECC for the walk-in cooler/freezers.
|
Energy | 02/17/2021 | Approved |
The drawings indicate new lighting and lighting controls for the walk-in coolers. It is unclear how the new lighting controls satisfy the requirements of section C405.2.1 (Occupant sensor controls) of the 2015 VECC. In the resubmission show a design that satisfies the requirements of section C405.2.1 of the 2015 VECC.
|
Energy | 02/17/2021 | Rejected |
The drawings indicate that walk-in coolers are part of the scope of the permit. The drawings do not call for cooler walls, floors and ceilings with R-values that satisfy the minimum requirements of section C403.2.16 of the 2015 VECC. In the resubmission, revise the drawings to satisfy the minimum R-value requirements of section C403.2.16 of the 2015 VECC for the walk-in cooler/freezers.
|
Energy | 02/17/2021 | Rejected |
The architectural drawings indicate that new building thermal envelope (BTE) doors (101 and 102) are part of the scope of the permit. It is unclear if these doors satisfy the U-factor and SHGC requirements of Table C402.4 of the 2015 Virginia Energy Conservation Code (VECC). In addition, it is unclear if the new BTE doors will satisfy the air infiltration requirements of Table C402.5.2 of the more...
|
Energy | 02/17/2021 | Rejected |
Sheet E-703 includes an interior lighting COMcheck. The COMcheck appears to be incorrect in the following ways. First, there are exemptions claimed for several fixtures of the K and D type. Section C405.4 of the 2015 VECC does not allow for these fixtures to be exempt from the calculation. These emergency lighting fixtures are not exempt from the calculation because they are also used for more...
|
Energy | 02/17/2021 | Rejected |
Sheet P-702 includes a water heater detail. This drawing indicates that a hot water recirculation system is part of the scope of the permit. The pump is required by section C404.6.1 of the 2015 VECC to be fitted with automatic controls to turn off the recirculation pump when there is no hot water demand. In the resubmission, show automatic controls that will shut down the hot water more...
|
Energy | 02/17/2021 | Rejected |
The drawings indicate new lighting and lighting controls for the walk-in coolers. It is unclear how the new lighting controls satisfy the requirements of section C405.2.1 (Occupant sensor controls) of the 2015 VECC. In the resubmission show a design that satisfies the requirements of section C405.2.1 of the 2015 VECC.
|