Building | 05/27/2022 | Approved |
Sheet A-001 COVER SHEET: DRAWINGS ARE APPROVED WITH THE FOLLOWING FIELD NOTE(S):
SUBMIT AUTOMATIC SUPPRESSION
SHOP DRAWINGS FOR APPROVAL
SUBMIT FIRE ALARM SHOP
DRAWINGS FOR APPROVAL
|
Building | 05/12/2022 | Approved |
Plans returned to submitter to correct revised file names. Do not rename files when submitting revisions. Name revised files exactly the same as the files they are replacing. Do not delete the old files. The system will see two files with the same name, then it will stack the new one on top of the old one, then it will "void" the old file while still keeping it in the system. Delete the more...
|
Building | 05/12/2022 | Rejected |
Plans returned to submitter to correct revised file names. Do not rename files when submitting revisions. Name revised files exactly the same as the files they are replacing. Do not delete the old files. The system will see two files with the same name, then it will stack the new one on top of the old one, then it will "void" the old file while still keeping it in the system. Delete the more...
|
Building | 01/13/2022 | Approved |
Sheet A-001 COVER SHEET: Sheet A-001:
|
Building | 01/13/2022 | Approved |
Sheet A-001: See markup. We’re currently reviewing drawings under 2018 VUSBC, which is the current default code. A full list of current applicable codes & standards can be found at: https://www.arlingtonva.us/Government/Programs/Building/Codes-Ordinances/Building/Standards. If you wish to, you may submit drawings under 2015 VUSBC, which will be accepted until June 30, 2022. Please update all cited more...
|
Building | 01/13/2022 | Approved |
Sheet A-001: Please take a look at your Sheet Index. Sheet 501 appears to be missing from the permit set. Sheet Title for A-500 & A-600 appears to be different too between index and sheet.
|
Building | 01/13/2022 | Approved |
Sheet A-102 GRADE LEVEL NEW WORK PLAN: Sheet A-102:
|
Building | 01/13/2022 | Approved |
Sheet A-001: See markup. Sprinkler system for use group A-2 portion of building is required based on VCC 903.2.1.2 #3. It may help to add code section to plan.
|
Building | 01/13/2022 | Approved |
Sheet A-001: See markup. Use group A-2 Fire Area separated with a 2-hr Fire Barrier based on VCC 707.3.10. It may help to add code section to plan.
|
Building | 01/13/2022 | Approved |
Sheet A102: See markup and VCC Table 716.1(2). Doors located in a 2-hr Fire Barrier shall be Fire Door(s) with 1-1/2-hr minimum fire resistance rating (example door #s 5, 6 and 9). Please coordinate with your Door Schedule.
|
Building | 01/13/2022 | Approved |
Sheet A102: See markup. Door #9 is occurring in two locations – at the Elevator Plump room on level 2 and at the Electric Room on level 1. Please coordinate with your Door Schedule.
|
Building | 01/13/2022 | Rejected |
Sheet A-001 COVER SHEET: Sheet A-001:
|
Building | 01/13/2022 | Rejected |
Sheet A-001: See markup. We’re currently reviewing drawings under 2018 VUSBC, which is the current default code. A full list of current applicable codes & standards can be found at: https://www.arlingtonva.us/Government/Programs/Building/Codes-Ordinances/Building/Standards. If you wish to, you may submit drawings under 2015 VUSBC, which will be accepted until June 30, 2022. Please update all cited more...
|
Building | 01/13/2022 | Rejected |
Sheet A-001: Please take a look at your Sheet Index. Sheet 501 appears to be missing from the permit set. Sheet Title for A-500 & A-600 appears to be different too between index and sheet.
|
Building | 01/13/2022 | Rejected |
Sheet A-102 GRADE LEVEL NEW WORK PLAN: Sheet A-102:
|
Building | 01/13/2022 | Rejected |
Sheet A-001: See markup. Sprinkler system for use group A-2 portion of building is required based on VCC 903.2.1.2 #3. It may help to add code section to plan.
|
Building | 01/13/2022 | Rejected |
Sheet A-001: See markup. Use group A-2 Fire Area separated with a 2-hr Fire Barrier based on VCC 707.3.10. It may help to add code section to plan.
|
Building | 01/13/2022 | Rejected |
Sheet A102: See markup and VCC Table 716.1(2). Doors located in a 2-hr Fire Barrier shall be Fire Door(s) with 1-1/2-hr minimum fire resistance rating (example door #s 5, 6 and 9). Please coordinate with your Door Schedule.
|
Building | 01/13/2022 | Rejected |
Sheet A102: See markup. Door #9 is occurring in two locations – at the Elevator Plump room on level 2 and at the Electric Room on level 1. Please coordinate with your Door Schedule.
|
DES:Water/Sewer Engineering | 01/03/2022 | Approved |
CTBO INT RENOVATION 7 NEW DFUS
|