Permit #F2000195
Address1550 CRYSTAL DR
TypeCOM
StatusFINALED
Permit HolderAMERICAN AUTOMATIC SPRINKLER CO INC
OwnerCESC SQUARE LLC %JBG SMITH PROPERTIES
Applied Date02/27/2020
Approved Date02/27/2020
Date Issued03/02/2020
DescriptionPHASE II - 55 SPRINKLER HEADS - LOBBY / PLAZA ** INTERIOR ALT FOR A NEW RETAIL SHOP PROVIDING PACKAGED SALADS, SANDWICHES, ENTREES, SOUPS & VARIOUS BEVERAGES. SELF APP CHECK-OUT

View Event Log.      View Status.    View Required Plan Review       View Printer Version.

Review   Review       Date Status   Comments   
Building08/05/2021Approved Sheet A-102_GROCERY LEVEL CONSTRUCTION PLAN BOH: Provide maneuvering clearances at ingress side of door 119A. 404.2.3 A117.1 2009.
Building08/05/2021Approved Sheet A-102_GROCERY LEVEL CONSTRUCTION PLAN BOH: I don't see a scheduled hardware set for door 119A. This door cannot lock, as it is part of the egress for the floor which requires access to two exits. If someone is in Corridor 2 and door 119C is blocked, re-entry through 119A is required. This space requires access to two exits.
Building08/02/2021Approved Sheet A-122_COOLER AND FREEZER SECTIONS: Please note plywood on new steel platform to be FRT. Non-combustible construction required, or FRT, Class A material.
Building03/16/2021Approved Sheet 0G-001_COVER SHEET: Approved Engineering judgement letter referencing structural foam insulation and signed by the Building Official is attached to the Architect's Response letter dated 3.01.2021.
Building03/16/2021Approved Sheet 0G-001_COVER SHEET: 3M Anti Graffiti Window film product data sheet is attached to the Architect's Response letter dated 3.01.2021.
Building03/16/2021Approved Sheet 0G-001_COVER SHEET: Arlington County Industrial/Commercial Wastewater User Survey is attached to Architect's Response letter dated 3.01.2021.
Building03/16/2021Approved Sheet A-600_DOOR TYPES, SCHEDULES, & DETAILS: Provide the hardware set on the plan for door 119C which should be 1-1/2 rated with fire hardware in an exit passageway. --------------------------------------------------------------------------------------------------------------------- UPDATED REVIEW COMMENT 3/16/2021: NOTE FOR HARDWARE SET 8, CONCEALED VERTICAL ROD SPECIFIED, NO DELAYED EGRESS  more...
Building08/04/2020Approved Provide written agreement with Building Official or approved code modification, allowing structural foam (combustible material in a non-combustible building) per 603.1. Agreement must indicate all penetrations in the area where structural foam is proposed, including details showing penetrations of the top slab and structural slab. Letter from Jensen Hughes dated July 14, 2020 and provided to ACG  more...
Building08/04/2020Approved Clearly show on a plan, the exact extent of structural foam support. Sheet S-101 notes foam, but the extent is unclear. There are also section details at the stair showing the foam that is not indicated on the plan. It would be helpful to provide spot thickness (location and thickness of structural foam on plan).
Building08/04/2020Approved Sheet A-582_ELEVATOR DETAILS AND SECTIONS: Clarify if shaft ceiling assembly is included in a different building permit and provide that permit number. If it is to be built under this permit, then provide a UL design listing detail. 109.3 VUSBC 2015.
Building08/04/2020Approved Sheet A-580_STAIR PLANS AND SECTIONS: Coordinate stair slab edge and structural detail shown on S-503, with the modification to allow rigid foam insulation (combustible material) in a non-combustible building. Refer to Jensen Hughes letter dated July 14, 2020. Show how insulation will be encased by 7" concrete min. 109.3 VUSBC 2015.
Building08/04/2020Approved Sheet A-113_OVERALL SLAB PLANS: Clarify if new structural corrugated metal deck with concrete slab "by Landlord" is constructed in a separate building permit. If assembly is to be included in this permit, provide details and UL design listing. 109.3 VUSBC 2015.
Building08/03/2020Approved Sheet A-600_DOOR TYPES, SCHEDULES, & DETAILS: Security grille 105A should comply with 1010.1.4.4 VUSBC 2015.
Building07/30/2020Approved I don't see sheet A-140 uploaded. Please submit. 109.3 VUSBC 2015
Building07/30/2020Approved Sheet A-404_INTERIOR ELEVATIONS (FRONT & BACK OF HOUSE): Public restroom finishes have changed. Floor and wall finishes must comply with 1210.2 VUSBC 2015. Provide finish schedule, I don't see this in the set. 109.3 VUSBC 2015.
Building07/28/2020Approved Sheet A-510_SLAB PENETRATION DETAILS: Provide UL listed design number for fire rated penetrations for inspector on site. 714.4 VUSBC 2015.
Building04/03/2020Approved Sheet 0G-001_COVER SHEET: SUBMIT FIRE ALARM SHOP DRAWINGS FOR APPROVAL
Building04/03/2020Approved Sheet 0G-001_COVER SHEET: SUBMIT AUTOMATIC SUPPRESSION SHOP DRAWINGS FOR APPROVAL
Building02/05/2020Approved Sheet A-600_DOOR TYPES, SCHEDULES, & DETAILS: Doors with hardware set HS01 must comply with section 1010.1.9.3 (2) VUSBC 2015.
Building02/05/2020Approved Sheet A-600_DOOR TYPES, SCHEDULES, & DETAILS: Doors with bottom rails must comply with 2009 A117.1 section 404.2.9 door surface. Bottom rail should be 10 inches.