Search for Permits

Use the search below to get details on plan review activities and review comments on your plans. This information is updated Monday through Friday at 12:30 p.m. and 5:30 p.m.

Information returned on this page is valid through 6/27/2022. Incorporating the new permitting system data into this website is in progress. For current data requests, please contact PermitTechSupport@arlingtonva.us

 
Permit #B1902272
Address5183 LEE HWY
TypeCTBO
StatusFINALED
Permit HolderARLINGTON RIDGE CONSTRUCTION GROUP INC
OwnerGARDEN CITY SHOPPING CENTER L P % ALLAN BERMAN
Applied Date08/15/2019
Approved Date12/02/2019
Date Issued12/03/2019
DescriptionINTERIOR ALTERATION TO AN EXISTING SPACE FOR A NEW TENANT TO INCLUDE A NEW RESTROOM, NEW ELECTRICAL WORK, MODIFICATIONS TO THE EXISTING HVAC SYSTEM, AND INSTALLATION OF AN ABOVE GROUND MODULAR SPA.

  View Event Log.      View Status.       View Required Plan Review       View Printer Version.   
  
  
Search Again

 
ReviewEnergy
Review Date10/23/2019
StatusApproved
Comments
Sheet A-001 has been revised to indicate that a new entrance door is part of the scope of the permit. This door must meet the minimum air infiltration, U-factor, and Solar Heat Gain Coefficient (SHGC) requirements of the 2012 VECC. Tables C402.3 and C402.5.2 of the 2012 VECC require a maximum allowable air infiltration rate of 0.20 CFM/SF, a maximum allowable U-factor of 0.77 and a maximum allowable SHGC of 0.40.
In the resubmission state the maximum allowable air infiltration rate, U-factor and SHGC on the drawings in the door schedule.
  



  
 
Search Permits By:   Address
Permit Number
Date