Permit Comments
 

ReviewReview DateStatusComments
Building03/21/2016ApprovedSheet A101 Partition Plan: Is there service at the large counter (POS) where customers order? It is not clear in plan or Detail 1 on A401 if the counter is at an accessible height of 36" max aff. ANSI A117.1. 904.3 Please clarify.
Building03/21/2016ApprovedSheet A101 Partition Plan: Appears there is a public sink (P-3) in Dining Area? Provide additional information showing accessible height. Refer to P101. ANSI A117.1 606.3.
Building03/21/2016ApprovedSheet A008 Finish Specifications & Schedules: Please add general note stating that all new wall, ceiling and floor finishes will comply for smoke-development and flame-spread indexes. (Can also be on Sheet A102: Finish Plan)
Building04/13/2016ApprovedSheet A009 Door & Storefront Systems Specifications & Schedules: Door EX01 is an existing entry door and indicates Hardware Set 8. Hardware does not include panic. Door 002 from the vestibule into the space has panic. Panic hardware is required in all A use spaces. VCC 2012 1008.1.10 Doors 7-10 for Toilet Rooms: Hardware Set 5 calls for passage set and deadbolt? Should these individual toilet rooms have privacy sets? Please clarify. Door Type C: vision lites shall be 43" max aff ANSI A117.1 404.2.10 ____________________________________________________________________ Hardware set for Doors 7-10 still not in compliance. Per VCC 1008.1.9.5, the unlatching of any door or leaf shall not require more than one operation.
Electrical 03/21/2016ApprovedSheet E100 LIGHTING PLAN: Provide a wall switch per NEC 110.26 in office 05 containing X former and dimming panel
Electrical 03/21/2016ApprovedSheet E100 LIGHTING PLAN: show Panel H in electrical closet, shown on power sheet only.
Plumbing 03/21/2016Approved- Grease interceptors shall only receive waste from fixtures and equipment that allow fats and oils or grease to be discharged. Seems multi appliances are draining into the Grease Interceptor please revise or correct. -Fixture and appliances shall be dictated by 2012 IPC 1003.3.1. -Provide complete gas piping detail to include material, total BTU, and all retailed information. 2012 IFGC 402.. -IFGC 408.4 Provide valve at all sediment trap locations. -Please show all sinks for general hand sanitization shall be equipped with mixing valves 1070 per 2012 IPC.
Zoning 03/28/2016ApprovedUNABLE TO COMPLETE ZONING REVIEW, SOME SHEETS COULD NOT BE OPENED DUE TO AN ISSUE WITH THE "FILE FORMAT". RESTAURANT USE IS APPROVED PER CATEGORY I OF RAMP FOR SP #249. IF ANY FACADE CHANGES ARE SHOWN, AN ADMIN CHANGE SHALL BE REQUIRED FOR SP #249. ANY SIGNAGE SHALL BE APPLIED FOR SEPARATELY.