Building04/26/2017ApprovedSheet G-0001 GENERAL INFORMATION: replace the ICC A117.1-2003 with the ADOPTED code which is the ICC A117.1-2009 version.
Building04/26/2017ApprovedSheet G-0004 LEED EDUCATION DISK PLAN: Please note that Building Plans Examiners within our offices do not review any LEED documents and/or plans for compliance with the LEED certification requirements. We DO review all interior and finishing materials for compliance with Flame Spread and Smoke Developed indices as included in Section 803 and Table 803.9 for wall and ceiling finishes. Also, you must review Chapter 8 of the VCC 2012 in its entirety and confirm that you are meeting the additional indices for floor finishing, moldings, furred and set-out construction, and other elements within the interior of the space which are all included in Chapter 8. Kindly provide this required information on your resubmitted plans package.
Building04/26/2017ApprovedSheet I-2101 INTERIOR ELEVATIONS: All lglazing considered to be located in hazardous locations in accordance to Section 2406.4 of the VCC 2012 must be tempered glazing that is marked in accordance with Section 2406.3 of the VCC 2012.
Building04/26/2017ApprovedSheet I-5005 DESIGN DETAILS WALL FINISHES: If the accessible ramp handrails are intended for a ramp with a rise run less than 6 inches, then no need for the handrails according to Section 405.8 of the ICC A117.1-2009. Otherwise, handrails are required for ramps with a rise of 6 inches or more, and shall be in accordance with Section 505 of the ICC A117.1-2009. Please review Section 505 for additional information which must be met and shown on the ramp drawing on this sheet set. For example, the ramp must comply with Sections 505.2 through section 505.10.1 of the ICC A117.1-2009.
Building04/26/2017ApprovedSheet G-0001 GENERAL INFORMATION: The adopted building code is NOT the 2009 code; Replace with the Virginia Construction Code 2012: VCC 2012. INCLUDE additional information about the base building, like the Total Number of Stories; the Use Group of the base building; and whether the base building includes a monitored fire alarm system
Building04/26/2017ApprovedSheet I-4102 ENLARGED RESTROOM PLAN AND ELEVATIONS: The height of the 42" horizontal grab bar should be made to the TOP of the grab bar and shall be a maximum of 36" from FFL to the top of the grab bar. See Figure 604.5.1 of the ICC A117.1-2009.
Building04/26/2017ApprovedSheet I-4102 ENLARGED RESTROOM PLAN AND ELEVATIONS: Show side view of 18" vertical grab bar in elevation 4 Men's bathroom.
Building04/26/2017ApprovedSheet I-2101 INTERIOR ELEVATIONS: I do not see the required panic grab bars at the two Exit doors. please show on these elevations.
Building06/07/2017ApprovedSheet I-1103 DOOR SCHEDULE AND TYPE: According to the attached panic bar manufacturer cut sheet, you are installing a requiest to exit button. Refer and confirm compliance with Section 1008.1.9.8 SENSOR RELASE OF ELECTRONICALLY LOCKED EGRESS DOORS and/or Section 1008.1.9.9 ELECTROMAGNETICALLY LOCKED EGRESS DOORS.
Building06/07/2017ApprovedSheet I-1103 DOOR SCHEDULE AND TYPE: Include figure/drawing showing elevation of the two leaf entrance/exit door' what type of material are the leafs made of? Wood? Glass? I don't believe you included a description of each exit door material. Please provide this information, along with the fire rating of each door.
Building06/07/2017ApprovedSheet I-1103 DOOR SCHEDULE AND TYPE: Clarify what you mean by SLIDING HARDWARE included on the description of the Ramp Entry door; do you have a manual sliding door? You also include description of a DEAD BOLT TO BOTTOM RAIL for Set 12; Clarify what exactly you mean by dead bolt to bottom rail? How does this function? IS it an accessible door mechanism? Is the Sliding hardware a manual function or is it powered?
Building06/07/2017ApprovedSheet I-4102 ENLARGED RESTROOM PLAN AND ELEVATIONS: NOT RESOLVED: The toilet paper dispenser shall be located in accordance with Section 604.7 of the ICC A117.1-2009: The opening of the toilet paper dispenser shall be a maximum of 42" from rear wall and 24" maximum from finished floor level. NEW COMMENT 6/07/2017 Still could not see the minimum/maximum installation tolerances for the toilet paper dispenser. Refer to Section 604.7 of the ICC A117.1-2009 for DETAILED information about toilet dispensers.
Building06/07/2017ApprovedSheet I-1103 DOOR SCHEDULE AND TYPE: NOT RESOLVED: Provide evidence that the Concealed Rod panic Device installed on each of the exterior exit doors comply with Section 1008.1.10 of the VCC 2012 which requires: 1- Panic hardware be listed with UL 305. 2- The actuating portion of the releasing device shall extend at least one-half of the door leaf. 3- The maximum unlatching force shall not exceed 15 pounds (67 N).
Building06/15/2017ApprovedSheet A-2001 EXTERIOR ELEVATIONS: You need to submit the design drawings arranged sequentially according to trade (Architectural; electrical; Plumbing. and Mechanical). Extremely confusing and time consuming for reviewers to be searching for relevant sheets which are dispersed throughout the entire submitted package. PLEASE rearrange according to engineering standards. Thank you.
Building06/21/2017ApprovedSheet I-1103 DOOR SCHEDULE AND TYPE: NOT RESOLVED: Provide full information about the IN-GROUND AUTOMATIC OPERATOR: How does this automatic operator functions? Sensor? Is there a maglock functionality on egress side Make sure that you review Sections 1008.1.9.8 of the VCC 2012. NEW COMMENT 6/07/2017: 1- Your response to this rejection comment must be included on THIS sheet (Door Schedule And Type). Cut sheet from manufacturer is not reviewed for compliance with applicable code sections from the VCC 2012. 2- Cut sheets and information from manufacturer is submitted as "additional information", which is not not reviewed as other drawings which are prepared, signed and sealed by a Virginia Registered Design Professional (RA or P.E).
Plumbing 04/20/2017Approved4-20-17 Pg P5001 Please provide Trap Primer detail and or Primer device for FD's in restroom
Surveyors  ApprovedSheet 017-MARYMOUNT UNIVERSITY-CEP-C4.00: 1) Add VCS1983 coordinate values at two property corners per SP condition 24(a). 2) Add appropriate note per SP condition 24(a). 3) Add appropriate note per SP condition 24(b).
Zoning 04/25/2017ApprovedPlease note that per the site plan ordinance (condition 26 of site plan #64) there are requirements to maintain store front transparency with specific requirements for the subject space (corner space). The installation of the interior wall for the creation of the restroom must be reviewed and approved by staff and the Zoning administrator prior to approval of this permit. Please reach out to Planning staff for discussion before submitting the request. This will help you know if the request will be supported or rejected and discuss other possible options. you can reach out to Justin Falango at jfalango@arlingtonva.us
Zoning 04/25/2017ApprovedRemove all exterior signage from this permit. Signs are not reviewed with this permit and require separate one.
Zoning 05/25/2017ApprovedApproval of this permit pending approval of administrative change request.
Zoning 05/31/2017ApprovedPlease remove all reference to outdoor seating areas on this permit.
Zoning 06/19/2017ApprovedThis permit is for interior alteration for new cafe tenant fit out only. outdoor seating and signage are not reviewed or approved with this permit.