Review | Review Date | Status | Comments |
Building | 01/03/2019 | Approved | Please verify all provided benches are accessible per ICC A117.1 ANSI 2009, chapter 9 section 903. Please show all applicable dimensions for the bench. |
Building | 01/03/2019 | Approved | Transfer-type shower shall comply with 2009 ICC/ANSI A117.1 Section 608.2.1. Clear floor space shall extend 12" past the seat. The shower controls shall be on the wall opposite the seat. Show clear floor space, seat, and controls on plan. See Fig. 608.2.1.
Comment is applicable for the men's room accessible shower seat, it appears required 12" extension is blocked by an extended wall, please see referenced figure in ANSI book for clear layout of transfer type showers. |
Building | 01/03/2019 | Approved | Each door (i.e., all doors) capable of latching or locking in a means of egress from a Group A or E occupancy with an occupant load of 50 or more shall be provided with panic or fire exit hardware (Section 1008.1.10).
Panic hardware is also required for door E2 with type 2 hardware set indicates etr., please make sure door also includes panic hardware. |
Building | 01/03/2019 | Approved | Grab bars in restrooms shall comply with 2009 ICC/ANSI A117.1 Section 604.5. Unless previously provided, vertical grab bar(s) required. See Fig. 604.5.1 and 604.5.2. Please see toilet shower elevations on sheet A502. |
Building | 02/04/2019 | Approved | A Family or Assisted Use Bathing Room is required in recreational facilities where separate-sex bathing rooms or locker rooms are provided (1109.2.1).
COMMENT NOT ADDRESSED 02/04/19--------------------------------------------------------------------------------
Please read the section thoroughly it appears designer is confusing toilet room requirement with bathing/shower room requirement, read the section to the end, requirement is applicable if the room includes showers (more than one, based on exception) in separate rooms. |
Building | 03/14/2019 | Approved | Sheet A001-General Information: PLANS ARE APPROVED WITH FOLLOWING NOTES FOR FIELD:
SUBMIT FIRE ALARM SHOP DRAWINGS FOR APPROVAL
SUBMIT AUTOMATIC SUPPRESSION SHOP DRAWINGS FOR APPROVAL |
Building | 05/21/2019 | Approved | Sheet A001-General Information: Note that the accessibility code cited is not correct. 2009 ICC/ANSI A117.1 is the correct code. |
Building | 05/21/2019 | Approved | Sheet A301-Interior Elevations: Clarify ramp construction on plans. Concrete? Wood floor on sleepers? VCC 603.1. |
Building | 05/21/2019 | Approved | Sheet A801-Door Schedule and Details: All doors must provide free egress at all times. Note for HW set 1 states "Fully Locked (locked from exterior)". That sounds like occupants can be locked in with a key. Please clarify or correct on the plans. VCC 1008.1.9. |
Building | 05/21/2019 | Approved | Sheet A504-Assisted Use Accessible Bathing Room: Sheets A-501-A504.
Accessible transfer showers dimensions must be 36" x 36" exact. This is not a "minimum" dimension. ICC/ANSI A117.1, 608.2.1. |
DES:Water/Sewer Engineering | 03/26/2019 | Eplan Review Note | COMMERCIAL INT ALT. 30.50 NEW DFUS. APPROVED |
DES:Water/Sewer Engineering | 05/21/2019 | Eplan Review Note | ACTIVE REVISION. NO PLUMBING. APPROVED |
Energy | 01/03/2019 | Approved | Sheet P002 indicates that a 119 gallon tank-type electric water heater is part of the scope of the permit. The plans do not state the maximum allowable % per hour heat loss of the water heater. The 2015 Virginia Energy Conservation Code (VECC) Table C404.2 requires a maximum allowable heat loss of 0.53% per hour or less.
In the resubmission, state the maximum allowable % per hour heat loss for the water heater in the electric storage water heater schedule.
|
Energy | 01/03/2019 | Approved | Section C405.2.1 of the 2015 Virginia Energy Conservation Code (VECC) requires that Restrooms be controlled with occupant sensor controls. Sheet E101 does not show an occupant sensor in the Men's Changing room.
In the resubmission, show an occupancy sensor in the Men's Changing room in order to comply with section C405.2.1 of the 2015 VECC. |
Energy | 02/04/2019 | Approved | Sheet P002 indicates that a hot water recirculation system is part of the scope of the permit. The pump is required by section C404.6.1 of the 2015 VECC to be fitted with automatic controls to turn off when there is no hot water demand.
In the resubmission, show automatic controls that will shut down the hot water recirculation pump when there is no hot water demand.
***02/04/2019*** Comment not addressed. The aqua stat in note D maintains the temperature of the hot water in the loop, 24/7. It does not satisfy the code requirement to shut down the hot water loop during periods of no hot water demand. Typically a programmable timer is required to turn off the hot water recirculation pump and override the aqua stat so that hot water |
Energy | 02/04/2019 | Approved | Section C405.2.1.1 of the 2015 VECC requires that occupant sensor controls function in a manner that automatically turns off lights within 30 minutes of all occupants leaving the space. Sheet E101 lighting key note 3 states that the hallway occupancy sensor will dim lighting to 50% when the hallway is not occupied. This does not meet code, as the code requires that the occupancy sensor control shut off the non-emergency lighting.
In the resubmission revise the design to comply with section C405.2.1.1 of the 2015 VECC.
****02/04/2019**** comment partially addressed. Lighting key note 3 does states "turn lighting within 30 minutes of all occupants leaving space." This is not the correct sequence of operation. The correct sequence i |
EPlan Review | 04/12/2019 | Approved | --N/A-- |
Plumbing | 01/03/2019 | Approved | 1-3-19 Pg A503 Please provide location of Vert Grab Bar for Mens and Womens restrooms. 2009 ANSI 604.5.1 |
Zoning | 01/08/2019 | Approved | Interior alteration of existing approved retail space on the ground floor level in building in sp239 (Stafford place I). No exterior work is proposed. Proposed use is health and fitness (yoga) identified in the Arlington retail plan under services and repairs.
Rejected: please address the following comments.
1. Per the Arlington retail map, the proposed use is allowed upon approval of an admin change. This is because, the site plan does not really specify the type of retail to be allowed. But because the health and fitness use (YOGA ) is consistent with proposed retail use in this space, admin change is required. To proceed, reference is made to the Arlington retail plan for guidance. Use the link below to download the Administrative cha |
Zoning | 02/07/2019 | Approved | Revision on 1/29/19: admin change to be submitted for approval. Applicant have been advised to include the façade alteration to front window as identified on the key note and plan on sheet A111 in the admin change request.
Reviewer:
Mudoh Mbah
Tel: 703-228-3727
Email: mmbah@arlingtonva.us
|
Zoning | 04/05/2019 | Approved | Interior alteration of existing approved retail space on the ground floor level and exterior façade alteration in building on sp239 (Stafford place I). Proposed use of space is health and fitness (yoga) identified in the Arlington retail plan under services and repairs. Admin change for proposed use and façade change zadm190167 is approved.
APPROVAL NOTE:
1. Work must be done as shown on the plan and plat submitted for zoning review on 9/22/2019. Any alteration to the above will need zoning review and approval.
Reviewer:
Mudoh Mbah
Tel: 703-228-3727
Email: mmbah@arlingtonva.us
|
Zoning | 05/21/2019 | Approved | no zoning issues |
Zoning | 06/06/2019 | Approved | no zoning issues |