Review | Review Date | Status | Comments |
Accessibility Review | 04/10/2019 | Rejected | COMMERCIAL PLAN REVIEW
All projects are reviewed under the requirements outlined in the Virginia Uniform Statewide Building Code. A written response letter must accompany plan revisions. Please contact the Plan Examiner for any clarification of the comments.
Permit #: B1900888 Applicable Code: VUSBC 2015 Edition
Project Name: Cities Coffee Plan Examiner: Chris Martin
Address: 3101 Wilson Blvd Discipline: Accessibility
Review Date: 4/10/19 Phone Number: 703-228-3854
Review #: Fax Number: 703-228-7046
Revision Date: NA Email: cmmartin@arlingtonva.us
Sheet Comments Code Reference
Accessibility plan review comments
1 A701 A portion of the sales and service counter shall be a minimum of 36 inches in height and a |
Accessibility Review | 05/22/2019 | Approved | --N/A-- |
Building | 04/11/2019 | Rejected | COMMERCIAL PLAN REVIEW
All projects are reviewed under the requirements outlined in the Virginia Uniform Statewide Building Code. A written response letter must accompany plan revisions. Please contact the Plans Examiner for any clarification of the comments.
Permit #: B1900888 Applicable Code: VUSBC 2015 Edition
Project Name : EAST WEST CAFE Plans Examiner: Mohamed Ghiwane
Address: 3101 Wilson Blvd Discipline: Building
Review Date: 04/11/19 Phone Number: 703-228-0578
Review #: 1st Fax Number: 703-228-7046
Revision Date: NA Email: mghiwane@arlingtonva.us
Sheet Comments Code Reference
1. A100 Please provide elevation/construction details for the raised floor slabs.
2. A1/A500 Ramps shall be provided with edge prot |
Building | 05/22/2019 | Approved | --N/A-- |
DES:Water/Sewer Engineering | 07/02/2019 | Approved | FIT-OUT OF EXISTING TENANT SPACE FOR COFFE SHOP. TO INCLUDE : MODIFICATION OF EXISTING REST ROOMS, INSTALLATION OF NEW FLOOR, CELLIN, CASEWORK. TO THE 1ST FLOOR FOR *EAST WEST CAFE**APPROVED FOR 9.00 NEW DFUS
|
Electrical | 04/15/2019 | Approved | --N/A-- |
Electrical | 05/28/2019 | No review required | Revisions dated 5-20-19. No Electrical. |
Fire Prevention | 04/11/2019 | No review required | --N/A-- |
Fire Prevention | 05/22/2019 | No review required | --N/A-- |
Mechanical | 04/10/2019 | Rejected | COMMERCIAL PLAN REVIEW
All projects are reviewed under the requirements outlined in the Virginia Uniform Statewide Building Code. A written response letter must accompany plan revisions. Please contact the Plan Examiner for any clarification of the comments.
Permit #: B1900888 Applicable Code: VUSBC 2015 Edition
Project Name: Cities Coffee Plan Examiner: Chris Martin
Address: 3101 Wilson Blvd Discipline: Mechanical
Review Date: 4/10/19 Phone Number: 703-228-3854
Review #: Fax Number: 703-228-7046
Revision Date: NA Email: cmmartin@arlingtonva.us
Sheet Comments Code Reference
Mechanical plan review comments
1 M101 Grease duct cleanout openings shall be spaced not more than twenty feet apart and not more than 1 |
Mechanical | 05/23/2019 | Approved | Revisions Dated 5/20/19 |
Plumbing | 04/10/2019 | Rejected | COMMERCIAL PLAN REVIEW
All projects are reviewed under the requirements outlined in the Virginia Uniform Statewide Building Code. A written response letter must accompany plan revisions. Please contact the Plan Examiner for any clarification of the comments.
Permit #: B1900888 Applicable Code: VUSBC 2012 Edition
Project Name: Cities Coffee Plan Examiner: Chris Martin
Address: 3101 Wilson Blvd Discipline: Plumbing
Review Date: 4/10/19 Phone Number: 703-228-3854
Review #: Fax Number: 703-228-7046
Revision Date: NA Email: cmmartin@arlingtonva.us
Sheet Comments Code Reference
Plumbing plan review comments
1 A100 An occupancy of 154 requires 2 water closets for male and 2 water closets for females. VPC 2015 Tab |
Plumbing | 05/23/2019 | Approved | Revisions Dated 5/20/19 |
Special Inspection Required | 05/23/2019 | No review required | revision 5/20/2019 |
Structural Review | 05/23/2019 | No review required | revision 5/20/2019 |
Zoning | 04/03/2019 | NOTATION | This plan was distributed to Jose "Tony" Gomez-Acevedo - jgomez-acevedo@arlingtonva.us at 703 228 3228. Comments should be posted in approximately 10 Business Days. |
Zoning | 04/05/2019 | Rejected | Comment to address:
- The proposed storefront work needs to be reviewed and approved administratively. An administrative change will need to be submitted at the 10th floor at Zoning. The administrative change will need to be approved prior and for the approval of this building permit.
Administrative change application:
https://building.arlingtonva.us/project/applying-for-an-administrative-change/
https://building.arlingtonva.us/wp-content/uploads/sites/38/2016/07/Administrative-Change-Application.pdf
General information:
Site Plan: 298
Zoning District: C-R
Work Area: 2,752 ft² + exterior.
Description on plans: Fit-out of existing tenant space for coffee shop, to include modifications to existing restrooms, installation of new f |
Zoning | 05/21/2019 | NOTATION | This plan was distributed to Jose "Tony" Gomez-Acevedo - jgomez-acevedo@arlingtonva.us at 703 228 3228. Comments should be posted in approximately 10 Business Days. |
Zoning | 05/28/2019 | NOTATION | The customer have not provided evidence of an approved administrative change for the changes on the façade. The permit can't be approved without an administrative change.
Revision date: 5/20/2019
Sheets:
G100, G101, A100, A151, A440, A500, A601, A701, A702, M101, P100, P000, P200 & P300. |
Zoning | 06/25/2019 | Approved | ZADM190324 was approved on 6/25/2019. |
Zoning | 07/02/2019 | NOTATION | Office and builder's set sign off: EWT per JGA 6/25/19 APPROVED |