Permit Comments
 
Permit #B1902272
Address5183 LEE HWY
TypeCTBO
StatusFINALED
Permit HolderARLINGTON RIDGE CONSTRUCTION GROUP INC
OwnerGARDEN CITY SHOPPING CENTER L P % ALLAN BERMAN
Applied Date15/08/2019
Approved Date02/12/2019
Date Issued03/12/2019
DescriptionINTERIOR ALTERATION TO AN EXISTING SPACE FOR A NEW TENANT TO INCLUDE A NEW RESTROOM, NEW ELECTRICAL WORK, MODIFICATIONS TO THE EXISTING HVAC SYSTEM, AND INSTALLATION OF AN ABOVE GROUND MODULAR SPA.

ReviewReview DateStatusComments
Building08/28/2019ApprovedSheet A-001 - Swim Box plans: Refer to section 1003.5. Your ramp requires either handrails or contrasting floor finish materials
Building08/28/2019ApprovedSheet A-001 - Swim Box plans: Door No. 1. The bottom rail of this door is required to be min. 10" h. (A117.1, Section 404.2.9 and the thumbturn needs to be extended arm accessible thumbturn to comply with section 1010.1.9.2
Building08/28/2019ApprovedSheet A-001 - Swim Box plans: Refer to elevation 6 - Please include that total distance from wall face to edge of sink to be 60" min.
Building08/28/2019ApprovedSheet A-001 - Swim Box plans: Refer to A117.1, Section 803.4 and 903. An accessible bench is required in changing room
Building08/28/2019ApprovedSheet A-001 - Swim Box plans: Refer To A117.1, Section 606.2. Your kitchenette sink needs 48" parallel approach centered on sink since doors provided on cabinetry limiting forward approach. Attaching toekick to the cabinet door is not considered accessible
Building08/28/2019ApprovedSheet A-001 - Swim Box plans: Refer to Section 1110.4.13 and A117.1, Section 1109. Accessible pool entry required
Building10/21/2019ApprovedSheet A-001 - Swim Box plans: Door 04 requires 10" bottom rail
Building10/21/2019ApprovedSheet A-001 - Swim Box plans: Door 01 hardware to Comply with 1010.1.9.3. Provide signage as required and locking device is to be readily distinguishable as locked
Building10/21/2019ApprovedSheet A-001 - Swim Box plans: See note on plan. Vertical grab bar per A117.1, Section 608.3.1.2 is required for transfer shower
Building11/21/2019ApprovedSheet A-001 - Swim Box plans: Refer to Section 2406.4.6 and see note on the plan. Confirm window adjacent to Door 01 meets safety glazing requirements. Tempered / laminated glass or a railing/ barrier at the interior face adjacent to the ramp is required.
DES:Water/Sewer Engineering08/29/2019ApprovedINTERIOR ALTERATION TO AN EXISTING SPACE FOR A NEW TENANT TO INCLUDE A NEW RESTROOM, NEW ELECTRICAL WORK, MODIFICATIONS TO THE EXISTING HVAC SYSTEM, AND INSTALLATION OF AN ABOVE GROUND MODULAR SPA.***APPROVED FOR 6.00 NEW DFUS
Energy 10/23/2019ApprovedSheet A-001 has been revised to indicate that a new entrance door is part of the scope of the permit. This door must meet the minimum air infiltration, U-factor, and Solar Heat Gain Coefficient (SHGC) requirements of the 2012 VECC. Tables C402.3 and C402.5.2 of the 2012 VECC require a maximum allowable air infiltration rate of 0.20 CFM/SF, a maximum allowable U-factor of 0.77 and a maximum allowable SHGC of 0.40. In the resubmission state the maximum allowable air infiltration rate, U-factor and SHGC on the drawings in the door schedule.
EPlan Review12/02/2019Approved--N/A--
EPlan Review12/03/2019Approved--N/A--
Plumbing 08/26/2019Approved8-26-19 Please provide Occp Count. 2015 VPC 403 required fixtures.
Plumbing 08/26/2019Approved8-26-19 Please provide dimensions and grab bar heights and dimensions for shower and restrooms.
Plumbing 10/21/2019Approved8-26-19 Please provide details for pump room and any and all connections to the Aquatic Vessel and any drainage connection. 2015 ispsc. 10-21-19 Thank you for addressing Aquatic vessel comment. Plans seem to indicate a new trench drain and a new floor drain. Please provide sanitary riser and venting for all new Plumbing.
Public Health Division08/23/2019ApprovedProvide details for the design and construction of the pool structure, including information on materials, necessary white or light color for the interior surface.
Public Health Division08/23/2019ApprovedConfirm that there will be a drinking fountain readily accessible to all patrons within the pool area.
Public Health Division08/23/2019ApprovedConfirm a 15 minute turnover time on the filtration system, or confirm that a lifeguard will be present at all times that the facility is in use.
Public Health Division08/23/2019ApprovedConfirm that provisions for backwash of pool to the sanitary sewer will be provided.
Public Health Division08/23/2019ApprovedConfirm that the location of the facility will not hinder access by emergency personnel in the event of a medical emergency.
Public Health Division08/23/2019ApprovedConfirm that the depth of water will be marked at every one foot increment of depth
Public Health Division08/23/2019ApprovedConfirm that the pool area will have sufficient light to provide 1- foot candles of light for the pool surface and 30 foot candles for the pool deck area.
Public Health Division08/23/2019ApprovedConfirm that the pool will be adequately secured to prevent unauthorized entry when not in use.
Public Health Division08/23/2019ApprovedProvide detailed drawings for the pool, including main drains and skimmers, and the pump room, including specifications on the filtration system, with information on water volume and turnover time.
Public Health Division08/23/2019ApprovedConfirm that the deck will have a slope of not less than 1:48 or more than 1:24. Confirm that the pool deck will have a continuous deck at least five feet wide extending around the perimeter of the pool.
Public Health Division08/23/2019ApprovedConfirm a telephone capable of dialing 9-1-1 will be provided by the owner and will be located within the pool area.
Public Health Division10/22/2019ApprovedSheet Comments - 2019 10-10 - Response to Letter for CTBO-8545: Describe the term "siphoning water to trench drain". Does the trench drain go to sanitary sewer?
Public Health Division10/22/2019ApprovedSheet Comments - 2019 10-10 - Response to Letter for CTBO-8545: Show water volume and turnover time. Confirm a 15 minute turnover time, per Arlington County Water Recreational Facility Code for spas.
Public Health Division10/22/2019ApprovedSheet Comments - 2019 10-10 - Response to Letter for CTBO-8545: Confirm the presence of dual main drains. Confirm that main drains and other suction outlets are VGB approved.
Public Health Division10/22/2019ApprovedSheet Comments - 2019 10-10 - Response to Letter for CTBO-8545: Confirm that the depth of the water will be marked on the top edge of the spa.
Public Health Division10/22/2019ApprovedSheet Comments - 2019 10-10 - Response to Letter for CTBO-8545: Confirm that an emergency cutoff switch will be provided, per the Arlington County Water Recreational Facilities Code.
Zoning 08/30/2019ApprovedAccording to a conversation with the applicant, the retail space will receive a maximum of two customers at the same time by appointment. The retail space is part of a commercial mall with shared parking.