Review | Review Date | Status | Comments |
Building | 02/13/2020 | Approved | Sheet A-190-Schedules and Details: Automatic sliding doors 1 and 10 shall comply with 2015 VUSBC 1010.1.4.2 and BHMA A156.10. |
Building | 02/13/2020 | Approved | Sheet A-190-Schedules and Details: Automatic sliding doors 1 and 10 shall comply with 2015 VUSBC 1010.1.4.2 and BHMA A156.10. |
Building | 02/13/2020 | Approved | Sheet A-190-Schedules and Details: Automatic sliding doors 1 and 10 shall comply with 2015 VUSBC 1010.1.4.2 and BHMA A156.10. |
Building | 11/18/2019 | Approved | Sheet A-190-Schedules and Details: I cannot locate the hardware schedule. Please provide schedule on plans. Door hardware 01 is required to break away. 2015 VUSBC 1010.1.4.2 |
Building | 11/18/2019 | Approved | Sheet A-190-Schedules and Details: G2 and G6 glazing in sliding doors and adjacent fixed panels should be tempered per 2015 VUSBC section 2406.4. |
Building | 11/18/2019 | Approved | Sheet A-130-Entry Plan, Elevations and Details: Confirm if fixed glass panels at entry vestibule are within the 24 inch arc as measured from vertical edge of door, whereby the glazing will need to be tempered. 2015 VUSBC 2406.4.2 |
Building | 11/18/2019 | Approved | Sheet A-180-Enlarged Plans, Details and Elevations: Provide detail on plan as to how drinking fountains will comply with 2009 A117.1 section 307.2 Protrusion Limits and cane protection. The low fountain may comply however the higher fountain may not (height from bottom of unit greater than 27"). An equipment skirt or built element may be necessary. |
Building | 11/18/2019 | Approved | Sheet A-190-Schedules and Details: I cannot locate the hardware schedule. Please provide schedule on plans. Door hardware 01 is required to break away. 2015 VUSBC 1010.1.4.2 |
Building | 11/18/2019 | Approved | Sheet A-190-Schedules and Details: G2 and G6 glazing in sliding doors and adjacent fixed panels should be tempered per 2015 VUSBC section 2406.4. |
Building | 11/18/2019 | Approved | Sheet A-180-Enlarged Plans, Details and Elevations: Provide detail on plan as to how drinking fountains will comply with 2009 A117.1 section 307.2 Protrusion Limits and cane protection. The low fountain may comply however the higher fountain may not (height from bottom of unit greater than 27"). An equipment skirt or built element may be necessary. |
Building | 11/18/2019 | Approved | Sheet A-130-Entry Plan, Elevations and Details: Confirm if fixed glass panels at entry vestibule are within the 24 inch arc as measured from vertical edge of door, whereby the glazing will need to be tempered. 2015 VUSBC 2406.4.2 |
Building | 11/18/2019 | Approved | Sheet A-190-Schedules and Details: I cannot locate the hardware schedule. Please provide schedule on plans. Door hardware 01 is required to break away. 2015 VUSBC 1010.1.4.2 |
Building | 11/18/2019 | Approved | Sheet A-190-Schedules and Details: G2 and G6 glazing in sliding doors and adjacent fixed panels should be tempered per 2015 VUSBC section 2406.4. |
Building | 11/18/2019 | Approved | Sheet A-130-Entry Plan, Elevations and Details: Confirm if fixed glass panels at entry vestibule are within the 24 inch arc as measured from vertical edge of door, whereby the glazing will need to be tempered. 2015 VUSBC 2406.4.2 |
Building | 11/18/2019 | Approved | Sheet A-180-Enlarged Plans, Details and Elevations: Provide detail on plan as to how drinking fountains will comply with 2009 A117.1 section 307.2 Protrusion Limits and cane protection. The low fountain may comply however the higher fountain may not (height from bottom of unit greater than 27"). An equipment skirt or built element may be necessary. |
DES:Engineering | 10/09/2020 | Approved | DEMO BUILDING AND BUILD NEW CVS 19 NEW DFUS NO EXISTING FIXTURES SHOWN WATER METER TO REMAIN |
DES:Water/Sewer Engineering | 01/05/2022 | Approved | ACTIVE REVISION. STRUCTURAL CHANGES ONLY. NO PLUMBING. APPROVED |
DES:Water/Sewer Engineering | 10/09/2020 | Approved | DEMO BUILDING AND BUILD NEW CVS 19 NEW DFUS NO EXISTING FIXTURES SHOWN WATER METER TO REMAIN |
Electrical | 11/22/2019 | Approved | Provide Roof top rec per NEC 2014, Article 210.63 |
Electrical | 11/22/2019 | Approved | Provide show window receptacle per NEC 2014, Article 210.62 |
Electrical | 11/22/2019 | Approved | Provide light pole detail for parking lot. |
Electrical | 11/22/2019 | Approved | Provide Roof top rec per NEC 2014, Article 210.63 |
Electrical | 11/22/2019 | Approved | Provide show window receptacle per NEC 2014, Article 210.62 |
Electrical | 11/22/2019 | Approved | Provide light pole detail for parking lot. |
Energy | 03/02/2020 | Approved | The drawings have not included interior and exterior lighting COMcheck calculations to demonstrate compliance with the energy code on full size stamped and signed sheets. Note that the COMcheck must be coordinated with the Energy Cover Sheet, which is also missing from the submission. If the Energy Cover Sheet utilizes the 2015 VECC, then the interior and exterior lighting COMchecks must also use the 2015 IECC. If the Energy Cover Sheet utilizes ASHRAE 90.1-2013 then the interior and exterior lighting COMchecks must also use ASHRAE 90.1-2013.
In the resubmission, provide interior and exterior lighting COMcheck calculations to demonstrate compliance with the energy code on full size stamped and signed sheets.
***3-2-2020*** Comment |
Energy | 03/02/2020 | Approved | The submitted permit set does not include a complete, signed, stamped and dated Arlington County Energy Cover Sheet on a full size sheet in the drawings. The blank Arlington County Energy Cover Sheets, examples and instructions can be found at the following website: https://building.arlingtonva.us/codes-ordinances/energy-conservation/ . There are six ways to comply with the 2015 Virginia Energy Conservation Code (VECC) and a different energy cover sheet for each compliance path. Without an Arlington County Energy Cover Sheet, energy review comments cannot be issued because the compliance path has not been selected and indicated by submitting a complete sheet. The project team should anticipate additional energy plan review comments upo |
Energy | 03/02/2020 | Approved | The submitted permit set does not include a complete, signed, stamped and dated Arlington County Energy Cover Sheet on a full size sheet in the drawings. The blank Arlington County Energy Cover Sheets, examples and instructions can be found at the following website: https://building.arlingtonva.us/codes-ordinances/energy-conservation/ . There are six ways to comply with the 2015 Virginia Energy Conservation Code (VECC) and a different energy cover sheet for each compliance path. Without an Arlington County Energy Cover Sheet, energy review comments cannot be issued because the compliance path has not been selected and indicated by submitting a complete sheet. The project team should anticipate additional energy plan review comments upo |
Energy | 03/02/2020 | Approved | The drawings have not included interior and exterior lighting COMcheck calculations to demonstrate compliance with the energy code on full size stamped and signed sheets. Note that the COMcheck must be coordinated with the Energy Cover Sheet, which is also missing from the submission. If the Energy Cover Sheet utilizes the 2015 VECC, then the interior and exterior lighting COMchecks must also use the 2015 IECC. If the Energy Cover Sheet utilizes ASHRAE 90.1-2013 then the interior and exterior lighting COMchecks must also use ASHRAE 90.1-2013.
In the resubmission, provide interior and exterior lighting COMcheck calculations to demonstrate compliance with the energy code on full size stamped and signed sheets.
***3-2-2020*** Comment |
Energy | 11/27/2019 | Approved | Sheet E2 includes a lighting schedule. In order to correctly complete the interior and exterior lighting COMcheck calculations, this schedule must include the "Total input power (Watts)" of each fixture type. The current "Watts" column is insufficient to demonstrate compliance. |
Energy | 11/27/2019 | Approved | Sheets A10.1, A10, A1, A11, A12.1, A12.2, A14, A8 and A9 show detail sections and detail plans of the building thermal envelope. The drawings do not call out, label and state the R-value of all wall, floor and roof insulation.
In the resubmission, revise sheets A10.1, A10, A1, A11, A12.1, A12.2, A14, A8 and A9 to call out, label, and state the R-value of all wall, floor and roof insulation.
|
Energy | 11/27/2019 | Approved | Sheet A19 includes a door schedule. There are four issues with the door schedule related to the energy code. First, the door schedule does not indicate which doors are part of the building thermal envelope and which doors are not part of the building thermal envelope. Second, the door schedule does not indicate the U-factor of the building thermal envelope doors. Third, the door schedule does not indicate the SHGC for building thermal envelope doors that have glazing and are exterior. Fourth, the door schedule does not indicate the air infiltration rate of the building thermal envelope doors.
In the resubmission, add a column to the door schedules. The column should indicate 1) which doors are part of the building thermal envelope |
Energy | 11/27/2019 | Approved | Sheet A19 includes the project glazing types, some of which appear to be part of the building thermal envelope. The drawings do not state the window assembly (frame+glass) U-factors. The drawings do not state the SHGC of the glass. The drawings do not state the air infiltration requirement of the glazing assemblies.
In the resubmission, revise the drawings to state the "Minimum assembly (frame + glass) U-factor", the maximum allowable SHGC and the maximum allowable air infiltration. |
Energy | 11/27/2019 | Approved | Sheet E2 includes a lighting schedule. In order to correctly complete the interior and exterior lighting COMcheck calculations, this schedule must include the "Total input power (Watts)" of each fixture type. The current "Watts" column is insufficient to demonstrate compliance. |
Energy | 11/27/2019 | Approved | Sheets A10.1, A10, A1, A11, A12.1, A12.2, A14, A8 and A9 show detail sections and detail plans of the building thermal envelope. The drawings do not call out, label and state the R-value of all wall, floor and roof insulation.
In the resubmission, revise sheets A10.1, A10, A1, A11, A12.1, A12.2, A14, A8 and A9 to call out, label, and state the R-value of all wall, floor and roof insulation.
|
Energy | 11/27/2019 | Approved | Sheet A19 includes a door schedule. There are four issues with the door schedule related to the energy code. First, the door schedule does not indicate which doors are part of the building thermal envelope and which doors are not part of the building thermal envelope. Second, the door schedule does not indicate the U-factor of the building thermal envelope doors. Third, the door schedule does not indicate the SHGC for building thermal envelope doors that have glazing and are exterior. Fourth, the door schedule does not indicate the air infiltration rate of the building thermal envelope doors.
In the resubmission, add a column to the door schedules. The column should indicate 1) which doors are part of the building thermal envelope |
Energy | 11/27/2019 | Approved | Sheet A19 includes the project glazing types, some of which appear to be part of the building thermal envelope. The drawings do not state the window assembly (frame+glass) U-factors. The drawings do not state the SHGC of the glass. The drawings do not state the air infiltration requirement of the glazing assemblies.
In the resubmission, revise the drawings to state the "Minimum assembly (frame + glass) U-factor", the maximum allowable SHGC and the maximum allowable air infiltration. |
Environmental Services | 06/18/2020 | Rejected | Before this project is fully approved please submit for your LDA permit. You project is over 2,500 sf. |
Environmental Services | 06/18/2020 | Approved | Before this project is fully approved please submit for your LDA permit. You project is over 2,500 sf. |
Environmental Services | 06/18/2020 | Approved | Before this project is fully approved please submit for your LDA permit. You project is over 2,500 sf. |
EPlan Review | 12/05/2021 | Approved | |
Fire Prevention | 02/21/2020 | Approved | Sheet E-200-Lighting Plan: Submit fire alarm shop drawing for review |
Fire Prevention | 02/21/2020 | Approved | Sheet E-200-Lighting Plan: It appears there will be fire alarm system will be installed. Provide fire alarm plan with riser and operation input/output matrix per NFPA 72 as applicable for review.
I do not see response on the drawing however if the requirement as mentioned above is provided on the fire alarm shop drawing will be acceptable. |
Fire Prevention | 02/21/2020 | Approved | Sheet E-200-Lighting Plan: It appears there will be fire alarm system will be installed. Provide fire alarm plan with riser and operation input/output matrix per NFPA 72 as applicable for review.
I do not see response on the drawing however if the requirement as mentioned above is provided on the fire alarm shop drawing will be acceptable. |
Fire Prevention | 02/21/2020 | Approved | Sheet E-200-Lighting Plan: Submit fire alarm shop drawing for review |
Fire Prevention | 11/19/2019 | Approved | Sheet E-200-Lighting Plan: Fire alarm note 6. Revise as appropriate. This building does not have fire sprinkler |
Fire Prevention | 11/19/2019 | Approved | Sheet E-200-Lighting Plan: Fire alarm note 6. Revise as appropriate. This building does not have fire sprinkler |
Plumbing | 02/24/2020 | Approved | 2-24-20 I could not locate Storm Riser, Please advise location or provide. 2015 VPC 11
Thank you for addressing past comments |
Plumbing | 02/24/2020 | Approved | 2-24-20 I could not locate Storm Riser, Please advise location or provide. 2015 VPC 11
Thank you for addressing past comments |
Plumbing | 11/19/2019 | Approved | 11-19-19 Pg P4 BFP required for water filter system. 2015 VPC 608.3 |
Plumbing | 11/19/2019 | Approved | 11-19-19 Pg P2 Please provide complete gas riser calculations 2015 VFGC 402 |
Plumbing | 11/19/2019 | Approved | 11-19-19 Pg P3 Please provide fixture type on Plumbing Fixture Schedule |
Plumbing | 11/19/2019 | Approved | 11-19-19 Pg P2 Please provide Vent for FS-1, Please advise 3" SS vent locations and fixture type. 2015 VPC 909.1 |
Plumbing | 11/19/2019 | Approved | 11-19-19 Please provide complete Occp Calculations to include Type for required Min fixtures. 2015 VPC 403 |
Plumbing | 11/19/2019 | Approved | 11-19-19 Pg P3 Please provide fixture type on Plumbing Fixture Schedule |
Plumbing | 11/19/2019 | Approved | 11-19-19 Pg P2 Please provide Vent for FS-1, Please advise 3" SS vent locations and fixture type. 2015 VPC 909.1 |
Plumbing | 11/19/2019 | Approved | 11-19-19 Please provide complete Occp Calculations to include Type for required Min fixtures. 2015 VPC 403 |
Plumbing | 11/19/2019 | Approved | 11-19-19 Pg P4 BFP required for water filter system. 2015 VPC 608.3 |
Plumbing | 11/19/2019 | Approved | 11-19-19 Pg P2 Please provide complete gas riser calculations 2015 VFGC 402 |
Preconstruction Meeting | 02/27/2020 | Rejected | Please schedule a Preconstruction meeting when all parties are identified. |
Preconstruction Meeting | 05/14/2020 | NOTATION | Pending GC procurement |
Preconstruction Meeting | 06/09/2020 | Rejected | Please contact me to discuss a precon meeting:
Jayzee Dimapilis
703-228-3923
jdimapilis@arlingtonva.us
|
Preconstruction Meeting | 09/28/2020 | NOTATION | Precon has not yet been scheduled. |
Preconstruction Meeting | 11/19/2021 | Approved | Preconstruction meeting held 11/17/21 |
Preconstruction Meeting | 11/25/2019 | Rejected | Please call or email me to set up a Pre-Construction Meeting with all involved parties prior to Permit approval.
Thanks,
Jayzee Dimapilis
703-228-3923
jdimapilis@arlingtonva.us |
Public Health Division | 11/05/2019 | Approved | Facility must have a Limited Certified Food Manager present during all hours of operation, or apply for a variance to the provision. |
Public Health Division | 11/05/2019 | Approved | Ensure all refrigeration units and freezers will maintain all TCS foods at a proper internal proper temperature. |
Public Health Division | 11/05/2019 | Approved | Ensure all refrigeration units and freezers will maintain all TCS foods at a proper internal proper temperature. |
Public Health Division | 11/05/2019 | Approved | Facility must have a Limited Certified Food Manager present during all hours of operation, or apply for a variance to the provision. |
Public Health Division | 11/05/2019 | Approved | Facility must have a Limited Certified Food Manager present during all hours of operation, or apply for a variance to the provision. |
Public Health Division | 11/05/2019 | Approved | Ensure all refrigeration units and freezers will maintain all TCS foods at a proper internal proper temperature. |
Special Inspection Required | 02/27/2020 | Rejected | SSI missing a General Contractor |
Special Inspection Required | 05/14/2020 | Rejected | GC is listed as "TBD" - this must be procured for SSI to be approved. |
Special Inspection Required | 06/09/2020 | Approved | GC:Venture Const Co. |
Special Inspection Required | 11/25/2019 | Rejected | Need SSI |
Structural | 02/27/2020 | Approved | Please provide Geotechnical Soils report as referenced in sheet "S-100" |
Structural | 02/27/2020 | Approved | Please provide Geotechnical Soils report as referenced in sheet "S-100" |
Structural | 02/27/2020 | Approved | Please provide Geotechnical Soils report as referenced in sheet "S-100" |
Structural | 05/14/2020 | Approved | Cycle 3 - The SSI is part of the approval process. I has to be complete (Owner, SER, SIER, GER, & GC) to be approved. GC cannot be "TBD" as currently submitted.
Cycle 2- SSI is missing General Contractor. Please resubmit with a GC.
Cycle 1-The Statement of Special Inspection (SSI)needs to be filled-in & submitted:
Please fill out only the applicable Statement(s) for your the project.
The statement of special inspection is used by the structural engineer of record (SER) to identify the structural items that require special inspection. This is a legal statement that shall be filled out by the Structural Engineer of Record (SER). All applicable item lines of inspection shall be initialed by both the structural engineer of record (SER) a |
Structural | 05/14/2020 | Approved | Cycle 3 - The SSI is part of the approval process. I has to be complete (Owner, SER, SIER, GER, & GC) to be approved. GC cannot be "TBD" as currently submitted.
Cycle 2- SSI is missing General Contractor. Please resubmit with a GC.
Cycle 1-The Statement of Special Inspection (SSI)needs to be filled-in & submitted:
Please fill out only the applicable Statement(s) for your the project.
The statement of special inspection is used by the structural engineer of record (SER) to identify the structural items that require special inspection. This is a legal statement that shall be filled out by the Structural Engineer of Record (SER). All applicable item lines of inspection shall be initialed by both the structural engineer of record (SER) a |
Structural | 05/14/2020 | Approved | Cycle 3- Pending GC procurement
Cycle 2- Please Schedule a Pre-construction meeting.
Please contact me for further information.
jdimapilis@arlingtonva.us and/or 703-228-3923 |
Structural | 05/14/2020 | Approved | Cycle 3 - The SSI is part of the approval process. I has to be complete (Owner, SER, SIER, GER, & GC) to be approved. GC cannot be "TBD" as currently submitted.
Cycle 2- SSI is missing General Contractor. Please resubmit with a GC.
Cycle 1-The Statement of Special Inspection (SSI)needs to be filled-in & submitted:
Please fill out only the applicable Statement(s) for your the project.
The statement of special inspection is used by the structural engineer of record (SER) to identify the structural items that require special inspection. This is a legal statement that shall be filled out by the Structural Engineer of Record (SER). All applicable item lines of inspection shall be initialed by both the structural engineer of record (SER) a |
Structural | 05/14/2020 | Approved | Cycle 3- Pending GC procurement
Cycle 2- Please Schedule a Pre-construction meeting.
Please contact me for further information.
jdimapilis@arlingtonva.us and/or 703-228-3923 |
Structural | 05/14/2020 | Approved | Cycle 3- Pending GC procurement
Cycle 2- Please Schedule a Pre-construction meeting.
Please contact me for further information.
jdimapilis@arlingtonva.us and/or 703-228-3923 |
Structural | 11/25/2019 | Approved | "S-500" detail 2/S5 references CMU Lintel detail 9/S5. Detail number "9/S5" is not used on drawing. |
Structural | 11/25/2019 | Approved | Please clarify:
Roof Dead Load, D = 20 psf per S-100
Roof Dead Load, D = 10 psf per S-300, 3/S3 Note # 2. |
Structural | 11/25/2019 | Approved | Please clarify:
Roof Dead Load, D = 20 psf per S-100
Roof Dead Load, D = 10 psf per S-300, 3/S3 Note # 2. |
Structural | 11/25/2019 | Approved | "S-500" detail 2/S5 references CMU Lintel detail 9/S5. Detail number "9/S5" is not used on drawing. |
Structural | 11/25/2019 | Approved | Please clarify:
Roof Dead Load, D = 20 psf per S-100
Roof Dead Load, D = 10 psf per S-300, 3/S3 Note # 2. |
Structural | 11/25/2019 | Approved | "S-500" detail 2/S5 references CMU Lintel detail 9/S5. Detail number "9/S5" is not used on drawing. |
Zoning | 02/24/2020 | Approved | Provide evidence that a landscape plan have been submitted and approved by the County. The landscape plan will need to be submitted at the Zoning front counter with the respective fee and 4 copies of the plans. The approval of the landscape plan is required for the approval of this permit. |
Zoning | 02/24/2020 | Approved | Provide the information of the fence height on the landscape plan. |
Zoning | 02/24/2020 | Approved | Provide evidence that a landscape plan have been submitted and approved by the County. The landscape plan will need to be submitted at the Zoning front counter with the respective fee and 4 copies of the plans. The approval of the landscape plan is required for the approval of this permit. |
Zoning | 02/24/2020 | Approved | Provide the information of the fence height on the landscape plan. |
Zoning | 02/24/2020 | Approved | Provide evidence that a landscape plan have been submitted and approved by the County. The landscape plan will need to be submitted at the Zoning front counter with the respective fee and 4 copies of the plans. The approval of the landscape plan is required for the approval of this permit. |
Zoning | 02/24/2020 | Approved | Provide the information of the fence height on the landscape plan. |
Zoning | 05/18/2020 | Approved | Since the only item pending is the approval of the landscape plan which was under review at the time of the review of the building permit and since another reviewer rejected this permit, then I will reject this permit. Not that there is any comment to address, but to allow the customer to address the comment from another reviewer and to allow time for the approval of the landscape plan. |
Zoning | 05/18/2020 | Approved | Since the only item pending is the approval of the landscape plan which was under review at the time of the review of the building permit and since another reviewer rejected this permit, then I will reject this permit. Not that there is any comment to address, but to allow the customer to address the comment from another reviewer and to allow time for the approval of the landscape plan. |
Zoning | 05/18/2020 | Approved | Since the only item pending is the approval of the landscape plan which was under review at the time of the review of the building permit and since another reviewer rejected this permit, then I will reject this permit. Not that there is any comment to address, but to allow the customer to address the comment from another reviewer and to allow time for the approval of the landscape plan. |
Zoning | 06/18/2020 | Approved | Pending approval of the landscape plan. This rejection is to allow the customer to address other reviewer comments. |
Zoning | 06/18/2020 | Approved | Pending approval of the landscape plan. This rejection is to allow the customer to address other reviewer comments. |
Zoning | 06/18/2020 | Approved | Pending approval of the landscape plan. This rejection is to allow the customer to address other reviewer comments. |