ReviewReview DateStatusComments
Building02/11/2020ApprovedSheet A-101-CONSTRUCTION PLAN: At least one of each type of exercise machine and equipment shall be on an accessible route. [2015 VCC Sec. 1110.4.10] Please clearly show compliance with the referenced section of the code by indicating the route, designated equipment and clear floor space required.
Building02/11/2020ApprovedSheet A-101-CONSTRUCTION PLAN: Please clearly show compliance with the accessibility requirements for dressing rooms in the area labeled Changing Room (102). [ICC A117.1-2009 Sec. 803]. For example show that the provisions for turning space, door swing and benches are met.
Building02/11/2020ApprovedSheet A-201-INTERIOR ELEVATIONS: Reach ranges shall comply with ICC A117.1-2009 Sec. 308. For example, please show on the drawings that unobstructed forward, or side reach for coat rack is compliant.
Building02/11/2020ApprovedSheet A-201-INTERIOR ELEVATIONS: Reach ranges shall comply with ICC A117.1-2009 Sec. 308. For example, please show on the drawings that unobstructed forward, or side reach for coat rack is compliant.
Building02/11/2020ApprovedSheet A-101-CONSTRUCTION PLAN: At least one of each type of exercise machine and equipment shall be on an accessible route. [2015 VCC Sec. 1110.4.10] Please clearly show compliance with the referenced section of the code by indicating the route, designated equipment and clear floor space required.
Building02/11/2020ApprovedSheet A-101-CONSTRUCTION PLAN: Please clearly show compliance with the accessibility requirements for dressing rooms in the area labeled Changing Room (102). [ICC A117.1-2009 Sec. 803]. For example show that the provisions for turning space, door swing and benches are met.
Building02/12/2020ApprovedSheet A-201-INTERIOR ELEVATIONS: Where lockers are provided in required accessible spaces, at least 5 percent, but not less than one shall be accessible. [2015 VCC Section 1109.9] For example, 6/A201 appears to be lockers or similar storage, please indicate a compliant accessible locker or storage element.
Building02/12/2020ApprovedSheet A-201-INTERIOR ELEVATIONS: Where lockers are provided in required accessible spaces, at least 5 percent, but not less than one shall be accessible. [2015 VCC Section 1109.9] For example, 6/A201 appears to be lockers or similar storage, please indicate a compliant accessible locker or storage element.
Building03/13/2020ApprovedSheet A-101-CONSTRUCTION PLAN: On the door schedule, it appears that a single hardware set is inadvertently assigned to most of the doors. Please verify each door is assigned appropriate hardware.
Building03/13/2020ApprovedSheet A-100-PARTITION TYPES: UL design listing acknowledged on the drawing. Please include actual listed construction detail on the drawings. Actual details of the referenced UL assembly are necessary for new construction and inspection of the listed assembly. Example: Please provide actual UL design detail for any new partition that references UL listed assembly Code Reference: VCC Sec 109.3 Sheet(s) Reference: G001
Building03/13/2020ApprovedSheet A-101-CONSTRUCTION PLAN: There appears to be omissions of partitions on the construction plan. UL design listing acknowledged on the drawing. Please include actual listed construction detail on the drawings. Actual details of the referenced UL assembly are necessary for proper construction and inspection of the listed assembly. Example: The label for partition type C1 is shown, but the partition is not identified on the plan. Partition type C1 on G001 references a rated tested assembly. Actual details of the referenced UL assembly are necessary for new construction and inspection of the listed assembly. Code Reference: VCC Sec 109.3 Sheet(s) Reference: A101, G001
Building03/13/2020ApprovedSheet A-101-CONSTRUCTION PLAN: On the door schedule, it appears that a single hardware set is inadvertently assigned to most of the doors. Please verify each door is assigned appropriate hardware.
Building03/13/2020ApprovedSheet A-101-CONSTRUCTION PLAN: There appears to be omissions of partitions on the construction plan. UL design listing acknowledged on the drawing. Please include actual listed construction detail on the drawings. Actual details of the referenced UL assembly are necessary for proper construction and inspection of the listed assembly. Example: The label for partition type C1 is shown, but the partition is not identified on the plan. Partition type C1 on G001 references a rated tested assembly. Actual details of the referenced UL assembly are necessary for new construction and inspection of the listed assembly. Code Reference: VCC Sec 109.3 Sheet(s) Reference: A101, G001
Building03/13/2020ApprovedSheet A-100-PARTITION TYPES: UL design listing acknowledged on the drawing. Please include actual listed construction detail on the drawings. Actual details of the referenced UL assembly are necessary for new construction and inspection of the listed assembly. Example: Please provide actual UL design detail for any new partition that references UL listed assembly Code Reference: VCC Sec 109.3 Sheet(s) Reference: G001
Building03/17/2020ApprovedSheet A-301-SECTIONS: Water supply and drain pipes under lavatories and sinks shall be insulated or otherwise configured to protect against contact. [ICC A117.1-2009 Section 606.6]. Detail for lavatory / sink (1/A301) does not show any for form of protection. Please clearly show compliance with referenced code section. *********************************************3/17/2020 Comment not addressed. Comment noted on drawing.
Building03/17/2020ApprovedSheet A-301-SECTIONS: Water supply and drain pipes under lavatories and sinks shall be insulated or otherwise configured to protect against contact. [ICC A117.1-2009 Section 606.6]. Detail for lavatory / sink (1/A301) does not show any for form of protection. Please clearly show compliance with referenced code section. *********************************************3/17/2020 Comment not addressed. Comment noted on drawing.
Building10/23/2020ApprovedSheet A-000-COVER SHEET: NOTE: SUBMIT AUTOMATIC SUPPRESSION SHOP DRAWINGS FOR APPROVAL SUBMIT FIRE ALARM SHOP DRAWINGS FOR APPROVAL
Building10/23/2020ApprovedSheet A-000-COVER SHEET: NOTE: SUBMIT AUTOMATIC SUPPRESSION SHOP DRAWINGS FOR APPROVAL SUBMIT FIRE ALARM SHOP DRAWINGS FOR APPROVAL
DES:Water/Sewer Engineering05/03/2021ApprovedACTIVE REVISION. NO PLUMBING. APPROVED
DES:Water/Sewer Engineering11/04/2020Eplan Review NoteCOMMERCIAL INT ALT. 12 NEW DFUS APPROVED
Electrical 02/21/2020ApprovedThe #3 copper feeder, protected by a 100 ampere main circuit breaker in panel board 'LV', 'must' comply with the requirements of NEC Article 110.14 (C) (1) (a) and 90.4. Also, Section 109.3 of the Virginia Construction Code. Refer to the Riser Diagram and the 'LV' Directory shown on sheet E-601.
Electrical 02/21/2020ApprovedBased on the lack of information provided, additional comments may be forthcoming.
Electrical 02/21/2020ApprovedComplete the Electrical Energy Certification Form and re-submit with the drawings. This form is required for all Luminaire's and/or controls to be used under this scope of work. Forms can be down loaded at building.arlingtonva.us. Comcheck is also accepted. Refer to Sheet E-101. Section 109.3 of the Virginia Construction Code.
Electrical02/21/2020ApprovedComplete the Electrical Energy Certification Form and re-submit with the drawings. This form is required for all Luminaire's and/or controls to be used under this scope of work. Forms can be down loaded at building.arlingtonva.us. Comcheck is also accepted. Refer to Sheet E-101. Section 109.3 of the Virginia Construction Code.
Electrical02/21/2020ApprovedThe #3 copper feeder, protected by a 100 ampere main circuit breaker in panel board 'LV', 'must' comply with the requirements of NEC Article 110.14 (C) (1) (a) and 90.4. Also, Section 109.3 of the Virginia Construction Code. Refer to the Riser Diagram and the 'LV' Directory shown on sheet E-601.
Electrical02/21/2020ApprovedBased on the lack of information provided, additional comments may be forthcoming.
Energy02/20/2020ApprovedThe electrical drawings indicate lighting in the daylight zone. It is unclear if the design will satisfy the requirements of section C405.2.3 (Daylight-Responsive Controls) of the 2015 Virginia Energy Conservation Code (VECC). In the resubmission, revise the electrical drawings to show compliance with section C405.2.3.
Energy02/20/2020ApprovedThe permit submission has not included a complete, signed and stamped interior lighting COMcheck on a full size sheet in the drawings. This is required in order to demonstrate compliance with Section C405.4 of the 2015 Virginia Energy Conservation Code (VECC). In the resubmission, include a complete interior lighting COMcheck calculation on a full size sheet in the drawings. The COMcheck calculation is permitted to use the 2015 IECC as the applicable code.
Energy02/20/2020ApprovedThe electrical light fixture schedule does not state the “total input power” (Watts) of each light fixture type. This value must be stated on the lighting schedule in order to validate the lighting COMcheck calculations that demonstrate compliance with section C405.4 of the 2015 VECC. In the resubmission, revise the lighting schedule to state the total input power (Watts) of each fixture type.
Energy 02/20/2020ApprovedThe electrical light fixture schedule does not state the “total input power” (Watts) of each light fixture type. This value must be stated on the lighting schedule in order to validate the lighting COMcheck calculations that demonstrate compliance with section C405.4 of the 2015 VECC. In the resubmission, revise the lighting schedule to state the total input power (Watts) of each fixture type.
Energy 02/20/2020ApprovedThe electrical drawings indicate lighting in the daylight zone. It is unclear if the design will satisfy the requirements of section C405.2.3 (Daylight-Responsive Controls) of the 2015 Virginia Energy Conservation Code (VECC). In the resubmission, revise the electrical drawings to show compliance with section C405.2.3.
Energy 02/20/2020ApprovedThe permit submission has not included a complete, signed and stamped interior lighting COMcheck on a full size sheet in the drawings. This is required in order to demonstrate compliance with Section C405.4 of the 2015 Virginia Energy Conservation Code (VECC). In the resubmission, include a complete interior lighting COMcheck calculation on a full size sheet in the drawings. The COMcheck calculation is permitted to use the 2015 IECC as the applicable code.
EPlan Review04/07/2021Approved--N/A--
Mechanical 02/13/2020ApprovedPlease comply with section 307.2.5 IMC2015 regarding drain line maintenance. (02.13.20) Further comments maybe forthcoming upon resubmission.
Mechanical02/13/2020ApprovedPlease comply with section 307.2.5 IMC2015 regarding drain line maintenance. (02.13.20) Further comments maybe forthcoming upon resubmission.
Plumbing02/14/2020Approved2-14-20 Pg P601 P3 Vent required for DF
Plumbing 02/14/2020Approved2-14-20 Pg P601 P3 Vent required for DF
Zoning 02/18/2020Approved1. Who was the previous tenant of the space and what was the use?
Zoning 02/18/2020Approved2. Please provide a plan showing how this space will have access to loading dock/trash and recycling areas.
Zoning 02/18/2020Approved5. Are any exterior modifications proposed?
Zoning 02/18/2020ApprovedPlease be advised that additional comments may be forthcoming upon submission of revised plans. A comment response letter is required.
Zoning 02/18/2020Approved3. Please provide an existing floor plan and demolition plan.
Zoning02/18/2020ApprovedPlease be advised that additional comments may be forthcoming upon submission of revised plans. A comment response letter is required.
Zoning02/18/2020Approved1. Who was the previous tenant of the space and what was the use?
Zoning02/18/2020Approved2. Please provide a plan showing how this space will have access to loading dock/trash and recycling areas.
Zoning02/18/2020Approved3. Please provide an existing floor plan and demolition plan.
Zoning02/18/2020Approved4. Please provide a front elevation to document that the transparency of this space will not be affected.
Zoning02/18/2020Approved5. Are any exterior modifications proposed?
Zoning 02/18/2020Approved4. Please provide a front elevation to document that the transparency of this space will not be affected.
Zoning03/24/2020ApprovedNo signs are approved with this permit. A Certificate of Occupancy is required for this space.
Zoning 03/24/2020ApprovedNo signs are approved with this permit. A Certificate of Occupancy is required for this space.