Permit Comments
 
Permit #B2000850
Address1550 CRYSTAL DR
TypeCTBO
StatusFINALED
Permit HolderBUILDING RESOURCES INC.
OwnerCESC SQUARE LLC % JBG SMITH PROPERTIES
Applied Date13/04/2020
Approved Date14/07/2020
Date Issued06/11/2020
DescriptionINTERIOR ALTERATIONS FOR A NEW BAKERY FOR MAH ZE DAHR ON THE 1ST FLOOR - SUITE B. MINOR EXTERIOR FACADE WORK - SEPARATE ADMIN CHANGE WILL BE SUBMITTED FOR REVIEW AND APPROVAL. SPECIAL INSPECTIONS REQUIRED

ReviewReview DateStatusComments
Building05/11/2020ApprovedSheet A-101 - LEVEL G1 FLOOR PLANS: Corrected reference to sheet A-602.
Building05/11/2020ApprovedSheet A-006 - ACCESSIBILITY - SANITARY FACILITIES: Height of grab bars is to top of grab bar, not centerline. A117.1 2009, section 604.5
Building05/11/2020ApprovedSheet A-101 - LEVEL G1 FLOOR PLANS: Corrected reference to sheet A-601.
Building05/11/2020ApprovedSheet A-006 - ACCESSIBILITY - SANITARY FACILITIES: Height of grab bars is to top of grab bar, not centerline. A117.1 2009, section 604.5
Building05/11/2020ApprovedSheet A-101 - LEVEL G1 FLOOR PLANS: Corrected reference to sheet A-601.
Building05/11/2020ApprovedSheet A-006 - ACCESSIBILITY - SANITARY FACILITIES: Height of grab bars is to top of grab bar, not centerline. A117.1 2009, section 604.5
Building05/11/2020ApprovedSheet A-101 - LEVEL G1 FLOOR PLANS: Corrected reference to sheet A-601.
Building05/11/2020ApprovedSheet A-101 - LEVEL G1 FLOOR PLANS: Corrected reference to sheet A-602.
Building05/11/2020ApprovedSheet A-101 - LEVEL G1 FLOOR PLANS: Corrected reference to sheet A-602.
Building05/12/2020ApprovedSheet A-101 - LEVEL G1 FLOOR PLANS: Corrected reference to sheet A-603.
Building05/12/2020ApprovedSheet A-101 - LEVEL G1 FLOOR PLANS: Corrected reference to sheet A-603.
Building05/12/2020ApprovedSheet ADA FORM: Providing new, required bathrooms is not an upgrade.
Building05/12/2020ApprovedSheet A-604 - ENLARGED VIEWS & DETAILS - MILWORK: Detail 7 sheet A-604 - clarify if this is an employee work area or customer area and counter height. Customer area will require accessible height.
Building05/12/2020ApprovedSheet A-102 - LEVEL G1 RCP AND LIGHTING PLAN: Please clarify ceiling detail reference tags. I'm not sure these are correct at each location on plan.
Building05/12/2020ApprovedSheet A-003 - EGRESS AND OCCUPANCY: Provide separate calculation for accessible seats at outdoor seating. You may need two accessible seats.
Building05/12/2020ApprovedSheet ADA FORM: Providing new, required bathrooms is not an upgrade.
Building05/12/2020ApprovedSheet A-604 - ENLARGED VIEWS & DETAILS - MILWORK: Detail 7 sheet A-604 - clarify if this is an employee work area or customer area and counter height. Customer area will require accessible height.
Building05/12/2020ApprovedSheet A-102 - LEVEL G1 RCP AND LIGHTING PLAN: Please clarify ceiling detail reference tags. I'm not sure these are correct at each location on plan.
Building05/12/2020ApprovedSheet A-003 - EGRESS AND OCCUPANCY: Provide separate calculation for accessible seats at outdoor seating. You may need two accessible seats.
Building05/12/2020ApprovedSheet ADA FORM: Providing new, required bathrooms is not an upgrade.
Building05/12/2020ApprovedSheet A-604 - ENLARGED VIEWS & DETAILS - MILWORK: Detail 7 sheet A-604 - clarify if this is an employee work area or customer area and counter height. Customer area will require accessible height.
Building05/12/2020ApprovedSheet A-102 - LEVEL G1 RCP AND LIGHTING PLAN: Please clarify ceiling detail reference tags. I'm not sure these are correct at each location on plan.
Building05/12/2020ApprovedSheet A-003 - EGRESS AND OCCUPANCY: Provide separate calculation for accessible seats at outdoor seating. You may need two accessible seats.
Building05/12/2020ApprovedSheet A-101 - LEVEL G1 FLOOR PLANS: Corrected reference to sheet A-603.
Building05/13/2020ApprovedSheet A-003 - EGRESS AND OCCUPANCY: Family or Assisted-Use Toilet Facilities are accessible facilities. Two are required per 2901.2.1. Cannot take exception 3 under 1109.2. Both restrooms provided in the design should be accessible.
Building05/13/2020ApprovedSheet A-603 - ENLARGED VIEW - BAKERY COUNTER: Correct reference to detail 4 sheet A-604.
Building05/13/2020ApprovedSheet A-003 - EGRESS AND OCCUPANCY: Family or Assisted-Use Toilet Facilities are accessible facilities. Two are required per 2901.2.1. Cannot take exception 3 under 1109.2. Both restrooms provided in the design should be accessible.
Building05/13/2020ApprovedSheet A-603 - ENLARGED VIEW - BAKERY COUNTER: Correct reference to detail 4 sheet A-604.
Building05/13/2020ApprovedSheet A-003 - EGRESS AND OCCUPANCY: Family or Assisted-Use Toilet Facilities are accessible facilities. Two are required per 2901.2.1. Cannot take exception 3 under 1109.2. Both restrooms provided in the design should be accessible.
Building05/13/2020ApprovedSheet A-603 - ENLARGED VIEW - BAKERY COUNTER: Correct reference to detail 4 sheet A-604.
DES:Water/Sewer Engineering03/17/2021ApprovedACTIVE REVISION. STRUCTURAL CHANGES ONLY/ NO PLUMBING APPROVED
DES:Water/Sewer Engineering07/14/2020Eplan Review NoteCOMMERCIAL INT ALT. NEW BAKERY. 32 NEW DFU'S. APPROVED
DES:Water/Sewer Engineering12/01/2020Eplan Review NoteACTIVE REVISION. ADDRESS CHANGE. NO PLUMBING. APPROVED
Energy 05/18/2020ApprovedThe permit submission drawings indicate that walk-in coolers/freezers are part of the scope of the permit. The drawings do not call for cooler/freezer walls, floor and ceiling R-values that are at or above the minimum requirements of section C403.2.16 the 2015 VECC. In the resubmission, revise the drawings to state the R-values of the walk in cooler/freezer on the drawings.
EPlan Review03/17/2021Approved--N/A--
EPlan Review07/14/2020Approved--N/A--
Plumbing 05/13/2020Approved5-13-20 one Men's and one women's restrooms required to be ADA compliant. 2015 VPC 403.2
Plumbing 07/07/2020ApprovedA Waste Water Survey Form is required. Please use the link provided. https://arlingtonva.s3.dualstack.us-east-1.amazonaws.com/wp-content/uploads/sites/4/2015/04/Arlington_IU_Survey_2014_140806mod.pdf And forward it to Wilson Dodge the pretreatment coordinator at wrdodge@arlingtonva.us
Public Health Division05/05/2020ApprovedSheet FS101 - Foodservice Equipment Plan: Confirm there will be a Northern Virginia certified food manager provided at the pre-opening inspection and at all hours of operation.
Public Health Division05/05/2020ApprovedSheet FS101 - Foodservice Equipment Plan: Submit the specifications for air curtains installed at the back door.
Public Health Division05/05/2020ApprovedSheet FS101 - Foodservice Equipment Plan: Confirm there will be a Northern Virginia certified food manager provided at the pre-opening inspection and at all hours of operation.
Public Health Division05/05/2020ApprovedSheet FS101 - Foodservice Equipment Plan: Submit the specifications for air curtains installed at the back door.
Public Health Division05/05/2020ApprovedSheet FS101 - Foodservice Equipment Plan: Confirm there will be a Northern Virginia certified food manager provided at the pre-opening inspection and at all hours of operation.
Public Health Division05/05/2020ApprovedSheet FS101 - Foodservice Equipment Plan: Submit the specifications for air curtains installed at the back door.
Public Health Division05/11/2020ApprovedSheet FS101 - Foodservice Equipment Plan: Unable to view the Kitchen Cutsheet document. Update and submit the document.
Public Health Division05/11/2020ApprovedSheet FS101 - Foodservice Equipment Plan: Submit a completed application for Foodservice Plan Review found on the Arlington County webpage. https://health.arlingtonva.us/wp-content/uploads/sites/25/2013/12/PHD-Food-Service-Plan-Review-Application_Fillable.pdf
Public Health Division05/11/2020ApprovedSheet FS101 - Foodservice Equipment Plan: Confirm the front windows to the outside will be protected against the entrance of rodents and insects with air curtains, screened windows, and/or closed.
Public Health Division05/11/2020ApprovedSheet FS101 - Foodservice Equipment Plan: Unable to view the Kitchen Cutsheet document. Update and submit the document.
Public Health Division05/11/2020ApprovedSheet FS101 - Foodservice Equipment Plan: Submit a completed application for Foodservice Plan Review found on the Arlington County webpage. https://health.arlingtonva.us/wp-content/uploads/sites/25/2013/12/PHD-Food-Service-Plan-Review-Application_Fillable.pdf
Public Health Division05/11/2020ApprovedSheet FS101 - Foodservice Equipment Plan: Confirm the front windows to the outside will be protected against the entrance of rodents and insects with air curtains, screened windows, and/or closed.
Public Health Division05/11/2020ApprovedSheet FS101 - Foodservice Equipment Plan: Unable to view the Kitchen Cutsheet document. Update and submit the document.
Public Health Division05/11/2020ApprovedSheet FS101 - Foodservice Equipment Plan: Submit a completed application for Foodservice Plan Review found on the Arlington County webpage. https://health.arlingtonva.us/wp-content/uploads/sites/25/2013/12/PHD-Food-Service-Plan-Review-Application_Fillable.pdf
Public Health Division05/11/2020ApprovedSheet FS101 - Foodservice Equipment Plan: Confirm the front windows to the outside will be protected against the entrance of rodents and insects with air curtains, screened windows, and/or closed.
Public Health Division06/30/2020ApprovedSheet FS101 - Foodservice Equipment Plan: Will confirm open comments before the pre-opening inspection.
Public Health Division06/30/2020ApprovedSheet FS101 - Foodservice Equipment Plan: Will confirm open comments before the pre-opening inspection.
Public Health Division06/30/2020ApprovedSheet FS101 - Foodservice Equipment Plan: Will confirm open comments before the pre-opening inspection.
Structural 02/19/2021RejectedConcrete specs were uploaded twice under Concrete Specs and Structural Calculations. Please submit the structural calculations
Structural 02/19/2021RejectedSpecial Inspections: REJECTED Please confirm who the SER is for the project. The drawings have Douglas E Bond PE seal and signature, while the SSI packet has Colleen Nasta, PE.
Structural 02/19/2021ApprovedConcrete specs were uploaded twice under Concrete Specs and Structural Calculations. Please submit the structural calculations
Structural 02/19/2021ApprovedSpecial Inspections: REJECTED Please confirm who the SER is for the project. The drawings have Douglas E Bond PE seal and signature, while the SSI packet has Colleen Nasta, PE.
Zoning 05/18/2020ApprovedPlease be advised that additional comments may be forthcoming upon submission of revised plans. A comment response letter is required.
Zoning 05/18/2020Approved1. Please provide a civil plan showing if the proposed outdoor cafe area is in the public ROW or if it is on private property. Per Section 12.9.15.B of the Zoning Ordinance, outdoor cafes within public rights-of-way or easements for public use are subject to approval of a use permit by the County Board as provided in §15.4.
Zoning 05/18/2020Approved2. It appears that the proposed awning was not approved as part of the facade plan. Will any part of this awning encroach into public ROWs or easements? Have you spoken with DES about any possible encroachments? And have you applied for an administrative change?
Zoning 05/18/2020ApprovedPlease be advised that additional comments may be forthcoming upon submission of revised plans. A comment response letter is required.
Zoning 05/18/2020Approved1. Please provide a civil plan showing if the proposed outdoor cafe area is in the public ROW or if it is on private property. Per Section 12.9.15.B of the Zoning Ordinance, outdoor cafes within public rights-of-way or easements for public use are subject to approval of a use permit by the County Board as provided in §15.4.
Zoning 05/18/2020Approved2. It appears that the proposed awning was not approved as part of the facade plan. Will any part of this awning encroach into public ROWs or easements? Have you spoken with DES about any possible encroachments? And have you applied for an administrative change?
Zoning 05/18/2020ApprovedPlease be advised that additional comments may be forthcoming upon submission of revised plans. A comment response letter is required.
Zoning 05/18/2020Approved1. Please provide a civil plan showing if the proposed outdoor cafe area is in the public ROW or if it is on private property. Per Section 12.9.15.B of the Zoning Ordinance, outdoor cafes within public rights-of-way or easements for public use are subject to approval of a use permit by the County Board as provided in §15.4.
Zoning 05/18/2020Approved2. It appears that the proposed awning was not approved as part of the facade plan. Will any part of this awning encroach into public ROWs or easements? Have you spoken with DES about any possible encroachments? And have you applied for an administrative change?
Zoning 07/13/2020ApprovedA Certificate of Occupancy is required for this space.
Zoning 07/13/2020ApprovedA Certificate of Occupancy is required for this space.
Zoning 07/13/2020ApprovedA Certificate of Occupancy is required for this space.