Review | Review Date | Status | Comments |
Building | 03/25/2021 | Approved | A-000 Architectural Cover Sheet 15 March 2021
SUBMIT AUTOMATIC SUPPRESSION SHOP DRAWINGS FOR APPROVAL
SUBMIT FIRE ALARM SYSTEM SHOP DRAWINGS FOR APPROVAL
|
Building | 03/25/2021 | Approved | A-000 Architectural Cover Sheet 15 March 2021
SUBMIT AUTOMATIC SUPPRESSION SHOP DRAWINGS FOR APPROVAL
SUBMIT FIRE ALARM SYSTEM SHOP DRAWINGS FOR APPROVAL
|
Building | 04/29/2021 | Approved | Sheet Revision Narrative of Changes to Permit: Revision Narrative 15 April 2021 29 April 2021
Item 2: There is no requirement that the affected wall be fire rated. |
DES:Water/Sewer Engineering | 02/17/2021 | Approved | 40 NEW DFU'S |
Electrical | 02/09/2021 | Approved | Code cycle is 2014 NEC. shown as NEC 2011 on sheet A-000, |
Electrical | 02/09/2021 | Approved | Drawing list shows 7 electrical sheets, E sheets show 8 electrical sheets, Sheet E-104 Electrical roof plan is missing from the drawing List. |
Electrical | 02/09/2021 | Rejected | Code cycle is 2014 NEC. shown as NEC 2011 on sheet A-000, |
Electrical | 02/09/2021 | Rejected | Drawing list shows 7 electrical sheets, E sheets show 8 electrical sheets, Sheet E-104 Electrical roof plan is missing from the drawing List. |
Electrical | 02/09/2021 | Approved | Code cycle is 2014 NEC. shown as NEC 2011 on sheet A-000, |
Electrical | 02/09/2021 | Approved | Drawing list shows 7 electrical sheets, E sheets show 8 electrical sheets, Sheet E-104 Electrical roof plan is missing from the drawing List. |
Energy | 02/17/2021 | Approved | The architectural drawings indicate that new building thermal envelope (BTE) doors (101 and 102) are part of the scope of the permit. It is unclear if these doors satisfy the U-factor and SHGC requirements of Table C402.4 of the 2015 Virginia Energy Conservation Code (VECC). In addition, it is unclear if the new BTE doors will satisfy the air infiltration requirements of Table C402.5.2 of the 2015 VECC. In the resubmission, revise the door schedule to indicate which doors are part of the BTE. State the U-factor, SHGC and air infiltration rates for the BTE doors on the drawings. |
Energy | 02/17/2021 | Approved | Sheet E-703 includes an interior lighting COMcheck. The COMcheck appears to be incorrect in the following ways. First, there are exemptions claimed for several fixtures of the K and D type. Section C405.4 of the 2015 VECC does not allow for these fixtures to be exempt from the calculation. These emergency lighting fixtures are not exempt from the calculation because they are also used for general lighting. Fixture M is missing from the COMcheck calculation but present in the lighting schedule. The input power for fixtures F and G are not coordinated between the COMcheck calculation and the lighting schedule. In the resubmission include all required fixtures and use the correct wattage in the COMcheck calculation. |
Energy | 02/17/2021 | Approved | Sheet P-702 includes a water heater detail. This drawing indicates that a hot water recirculation system is part of the scope of the permit. The pump is required by section C404.6.1 of the 2015 VECC to be fitted with automatic controls to turn off the recirculation pump when there is no hot water demand. In the resubmission, show automatic controls that will shut down the hot water recirculation pump when there is no hot water demand. State the sequence of operations for the controls on the drawings. |
Energy | 02/17/2021 | Approved | The drawings indicate that walk-in coolers are part of the scope of the permit. The drawings do not call for cooler walls, floors and ceilings with R-values that satisfy the minimum requirements of section C403.2.16 of the 2015 VECC. In the resubmission, revise the drawings to satisfy the minimum R-value requirements of section C403.2.16 of the 2015 VECC for the walk-in cooler/freezers. |
Energy | 02/17/2021 | Approved | The drawings indicate new lighting and lighting controls for the walk-in coolers. It is unclear how the new lighting controls satisfy the requirements of section C405.2.1 (Occupant sensor controls) of the 2015 VECC. In the resubmission show a design that satisfies the requirements of section C405.2.1 of the 2015 VECC. |
Energy | 02/17/2021 | Rejected | The drawings indicate that walk-in coolers are part of the scope of the permit. The drawings do not call for cooler walls, floors and ceilings with R-values that satisfy the minimum requirements of section C403.2.16 of the 2015 VECC. In the resubmission, revise the drawings to satisfy the minimum R-value requirements of section C403.2.16 of the 2015 VECC for the walk-in cooler/freezers.
|
Energy | 02/17/2021 | Rejected | The architectural drawings indicate that new building thermal envelope (BTE) doors (101 and 102) are part of the scope of the permit. It is unclear if these doors satisfy the U-factor and SHGC requirements of Table C402.4 of the 2015 Virginia Energy Conservation Code (VECC). In addition, it is unclear if the new BTE doors will satisfy the air infiltration requirements of Table C402.5.2 of the 2015 VECC. In the resubmission, revise the door schedule to indicate which doors are part of the BTE. State the U-factor, SHGC and air infiltration rates for the BTE doors on the drawings. |
Energy | 02/17/2021 | Rejected | Sheet E-703 includes an interior lighting COMcheck. The COMcheck appears to be incorrect in the following ways. First, there are exemptions claimed for several fixtures of the K and D type. Section C405.4 of the 2015 VECC does not allow for these fixtures to be exempt from the calculation. These emergency lighting fixtures are not exempt from the calculation because they are also used for general lighting. Fixture M is missing from the COMcheck calculation but present in the lighting schedule. The input power for fixtures F and G are not coordinated between the COMcheck calculation and the lighting schedule. In the resubmission include all required fixtures and use the correct wattage in the COMcheck calculation. |
Energy | 02/17/2021 | Rejected | Sheet P-702 includes a water heater detail. This drawing indicates that a hot water recirculation system is part of the scope of the permit. The pump is required by section C404.6.1 of the 2015 VECC to be fitted with automatic controls to turn off the recirculation pump when there is no hot water demand. In the resubmission, show automatic controls that will shut down the hot water recirculation pump when there is no hot water demand. State the sequence of operations for the controls on the drawings.
|
Energy | 02/17/2021 | Rejected | The drawings indicate new lighting and lighting controls for the walk-in coolers. It is unclear how the new lighting controls satisfy the requirements of section C405.2.1 (Occupant sensor controls) of the 2015 VECC. In the resubmission show a design that satisfies the requirements of section C405.2.1 of the 2015 VECC.
|
Energy | 02/17/2021 | Approved | The drawings indicate that walk-in coolers are part of the scope of the permit. The drawings do not call for cooler walls, floors and ceilings with R-values that satisfy the minimum requirements of section C403.2.16 of the 2015 VECC. In the resubmission, revise the drawings to satisfy the minimum R-value requirements of section C403.2.16 of the 2015 VECC for the walk-in cooler/freezers. |
Energy | 02/17/2021 | Approved | The architectural drawings indicate that new building thermal envelope (BTE) doors (101 and 102) are part of the scope of the permit. It is unclear if these doors satisfy the U-factor and SHGC requirements of Table C402.4 of the 2015 Virginia Energy Conservation Code (VECC). In addition, it is unclear if the new BTE doors will satisfy the air infiltration requirements of Table C402.5.2 of the 2015 VECC. In the resubmission, revise the door schedule to indicate which doors are part of the BTE. State the U-factor, SHGC and air infiltration rates for the BTE doors on the drawings. |
Energy | 02/17/2021 | Approved | Sheet E-703 includes an interior lighting COMcheck. The COMcheck appears to be incorrect in the following ways. First, there are exemptions claimed for several fixtures of the K and D type. Section C405.4 of the 2015 VECC does not allow for these fixtures to be exempt from the calculation. These emergency lighting fixtures are not exempt from the calculation because they are also used for general lighting. Fixture M is missing from the COMcheck calculation but present in the lighting schedule. The input power for fixtures F and G are not coordinated between the COMcheck calculation and the lighting schedule. In the resubmission include all required fixtures and use the correct wattage in the COMcheck calculation. |
Energy | 02/17/2021 | Approved | Sheet P-702 includes a water heater detail. This drawing indicates that a hot water recirculation system is part of the scope of the permit. The pump is required by section C404.6.1 of the 2015 VECC to be fitted with automatic controls to turn off the recirculation pump when there is no hot water demand. In the resubmission, show automatic controls that will shut down the hot water recirculation pump when there is no hot water demand. State the sequence of operations for the controls on the drawings. |
Energy | 02/17/2021 | Approved | The drawings indicate new lighting and lighting controls for the walk-in coolers. It is unclear how the new lighting controls satisfy the requirements of section C405.2.1 (Occupant sensor controls) of the 2015 VECC. In the resubmission show a design that satisfies the requirements of section C405.2.1 of the 2015 VECC. |
EPlan Review | 03/30/2021 | Approved | --N/A-- |
Fire Prevention | 02/17/2021 | No review required | Restaurant/bar |
Mechanical | 02/15/2021 | Approved | Provide Grease Duct cleanout per section 506.3.8 IMC2015 (detail for installation purposes) (02.15.21) |
Mechanical | 02/15/2021 | Approved | Provide Fire Wrap (duct and cleanout) manufacturer information/details for installation purposes per section 109.3 IMC2015 (02.15.21) |
Mechanical | 02/15/2021 | Approved | Please provide compliance or clarity regarding Smoke Detection per section 606.1 IMC2015 (02.15.21) (AC-1 thru AC-5) |
Mechanical | 02/15/2021 | Approved | Provide Grease Duct cleanout per section 506.3.8 IMC2015 (detail for installation purposes) (02.15.21) |
Mechanical | 02/15/2021 | Approved | Provide Fire Wrap (duct and cleanout) manufacturer information/details for installation purposes per section 109.3 IMC2015 (02.15.21) |
Mechanical | 02/15/2021 | Approved | Please provide compliance or clarity regarding Smoke Detection per section 606.1 IMC2015 (02.15.21) (AC-1 thru AC-5) |
Mechanical | 02/15/2021 | Rejected | Provide Grease Duct cleanout per section 506.3.8 IMC2015 (detail for installation purposes) (02.15.21) |
Mechanical | 02/15/2021 | Rejected | Provide Fire Wrap (duct and cleanout) manufacturer information/details for installation purposes per section 109.3 IMC2015 (02.15.21) |
Mechanical | 02/15/2021 | Rejected | Please provide compliance or clarity regarding Smoke Detection per section 606.1 IMC2015 (02.15.21) (AC-1 thru AC-5) |
Mechanical | 02/15/2021 | Approved | Provide Grease Duct cleanout per section 506.3.8 IMC2015 (detail for installation purposes) (02.15.21) |
Mechanical | 02/15/2021 | Approved | Provide Fire Wrap (duct and cleanout) manufacturer information/details for installation purposes per section 109.3 IMC2015 (02.15.21) |
Mechanical | 02/15/2021 | Approved | Please provide compliance or clarity regarding Smoke Detection per section 606.1 IMC2015 (02.15.21) (AC-1 thru AC-5) |
Plumbing | 02/11/2021 | Approved | A Waste Water Survey Form is required. Please use the link provided. https://arlingtonva.s3.dualstack.us-east-1.amazonaws.com/wp-content/uploads/sites/4/2015/04/Arlington_IU_Survey_2014_140806mod.pdf And forward it to Wilson Dodge the pretreatment coordinator at wrdodge@arlingtonva.us |
Plumbing | 02/11/2021 | Approved | A Waste Water Survey Form is required. Please use the link provided. https://arlingtonva.s3.dualstack.us-east-1.amazonaws.com/wp-content/uploads/sites/4/2015/04/Arlington_IU_Survey_2014_140806mod.pdf And forward it to Wilson Dodge the pretreatment coordinator at wrdodge@arlingtonva.us |
Plumbing | 02/11/2021 | Approved | A Waste Water Survey Form is required. Please use the link provided. https://arlingtonva.s3.dualstack.us-east-1.amazonaws.com/wp-content/uploads/sites/4/2015/04/Arlington_IU_Survey_2014_140806mod.pdf And forward it to Wilson Dodge the pretreatment coordinator at wrdodge@arlingtonva.us |
Public Health Division | 02/05/2021 | Rejected | Sheet FS-100 FOOD SERVICE EQUIPMENT PLAN: Please use the following link address below to obtain and submit the food service plan review application.
https://arlingtonva.s3.amazonaws.com/wp-content/uploads/sites/25/2013/12/PHD-Food-Service-Plan-Review-Application_Fillable.pdf
|
Public Health Division | 02/05/2021 | Rejected | Sheet FS-100 FOOD SERVICE EQUIPMENT PLAN: Install a beverage dump sink at the front coffee/beverage station located near the retail area. |
Public Health Division | 02/05/2021 | Rejected | Sheet FS-100 FOOD SERVICE EQUIPMENT PLAN: Confirm splash guards will be provided at all handwashing sinks including item #4. |
Public Health Division | 02/05/2021 | Rejected | Sheet FS-100 FOOD SERVICE EQUIPMENT PLAN: Provide the proposed menus. |
Public Health Division | 02/05/2021 | Approved | Sheet FS-100 FOOD SERVICE EQUIPMENT PLAN: Please use the following link address below to obtain and submit the food service plan review application.
https://arlingtonva.s3.amazonaws.com/wp-content/uploads/sites/25/2013/12/PHD-Food-Service-Plan-Review-Application_Fillable.pdf
|
Public Health Division | 02/05/2021 | Approved | Sheet FS-100 FOOD SERVICE EQUIPMENT PLAN: Install a beverage dump sink at the front coffee/beverage station located near the retail area. |
Public Health Division | 02/05/2021 | Approved | Sheet FS-100 FOOD SERVICE EQUIPMENT PLAN: Confirm splash guards will be provided at all handwashing sinks including item #4. |
Public Health Division | 02/05/2021 | Approved | Sheet FS-100 FOOD SERVICE EQUIPMENT PLAN: Provide the proposed menus. |
Public Health Division | 02/05/2021 | Rejected | Sheet FS-100 FOOD SERVICE EQUIPMENT PLAN: Please use the following link address below to obtain and submit the food service plan review application.
https://arlingtonva.s3.amazonaws.com/wp-content/uploads/sites/25/2013/12/PHD-Food-Service-Plan-Review-Application_Fillable.pdf
|
Public Health Division | 02/05/2021 | Rejected | Sheet FS-100 FOOD SERVICE EQUIPMENT PLAN: Install a beverage dump sink at the front coffee/beverage station located near the retail area. |
Public Health Division | 02/05/2021 | Rejected | Sheet FS-100 FOOD SERVICE EQUIPMENT PLAN: Confirm splash guards will be provided at all handwashing sinks including item #4. |
Public Health Division | 02/05/2021 | Rejected | Sheet FS-100 FOOD SERVICE EQUIPMENT PLAN: Provide the proposed menus. |
Public Health Division | 02/05/2021 | Approved | Sheet FS-100 FOOD SERVICE EQUIPMENT PLAN: Please use the following link address below to obtain and submit the food service plan review application.
https://arlingtonva.s3.amazonaws.com/wp-content/uploads/sites/25/2013/12/PHD-Food-Service-Plan-Review-Application_Fillable.pdf
|
Public Health Division | 02/05/2021 | Approved | Sheet FS-100 FOOD SERVICE EQUIPMENT PLAN: Install a beverage dump sink at the front coffee/beverage station located near the retail area. |
Public Health Division | 02/05/2021 | Approved | Sheet FS-100 FOOD SERVICE EQUIPMENT PLAN: Confirm splash guards will be provided at all handwashing sinks including item #4. |
Public Health Division | 02/05/2021 | Approved | Sheet FS-100 FOOD SERVICE EQUIPMENT PLAN: Provide the proposed menus. |
Public Health Division | 02/24/2021 | Approved | Sheet FS-100 FOOD SERVICE EQUIPMENT PLAN: Confirm all exterior openings, such as doors, windows, or pipe pass-throughs, will be weather-stripped or sealed to prevent rodent or insect entry.
Confirm screens or mechanical air curtains will be provided for doors and windows that open for fresh-air ventilation. |
Public Health Division | 02/24/2021 | Approved | Sheet FS-100 FOOD SERVICE EQUIPMENT PLAN: Confirm all exterior openings, such as doors, windows, or pipe pass-throughs, will be weather-stripped or sealed to prevent rodent or insect entry.
Confirm screens or mechanical air curtains will be provided for doors and windows that open for fresh-air ventilation. |
Public Health Division | 02/24/2021 | Rejected | Sheet FS-100 FOOD SERVICE EQUIPMENT PLAN: Confirm all exterior openings, such as doors, windows, or pipe pass-throughs, will be weather-stripped or sealed to prevent rodent or insect entry.
Confirm screens or mechanical air curtains will be provided for doors and windows that open for fresh-air ventilation. |
Structural | 03/08/2021 | Rejected | Special Inspections: REJECTED.
The statement of special inspection is used by the structural engineer of record (SER) to identify the structural items that require special inspection. This is a legal statement that shall be filled out by the Structural Engineer of Record (SER). All applicable item lines of inspection shall be initialed by both the structural engineer of record (SER) and the special inspection engineer of record (SIER). This statement must contain signatures from the following parties.
• Owner
• Structural Engineer of Record (SER)
• Geotechnical Engineer of Record (GER)
• Precast Concrete Engineer of Record (PER) (if applicable)
• Special Inspection Engineer of Record (SIER)
• Testing Agency Engineer of Record (if |
Structural | 03/08/2021 | Approved | Special Inspections: REJECTED.
The statement of special inspection is used by the structural engineer of record (SER) to identify the structural items that require special inspection. This is a legal statement that shall be filled out by the Structural Engineer of Record (SER). All applicable item lines of inspection shall be initialed by both the structural engineer of record (SER) and the special inspection engineer of record (SIER). This statement must contain signatures from the following parties.
• Owner
• Structural Engineer of Record (SER)
• Geotechnical Engineer of Record (GER)
• Precast Concrete Engineer of Record (PER) (if applicable)
• Special Inspection Engineer of Record (SIER)
• Testing Agency Engineer of Record (if |
Zoning | 02/16/2021 | Approved | Please be advised that additional comments may be forthcoming upon submission of revised plans. A comment response letter is required. |
Zoning | 02/16/2021 | Approved | 1. Please verify on the exterior elevations that nothing will be installed in front of the windows to affect the transparency requirement. The requirement is in place to allow pedestrians to view the activity within the retail establishment and to
allow patrons and employees of the retail establishments to view the activity on
the sidewalk and street. |
Zoning | 02/16/2021 | Approved | 2. Please note that no signs are approved with this permit. |
Zoning | 02/16/2021 | Approved | 1. Please verify on the exterior elevations that nothing will be installed in front of the windows to affect the transparency requirement. The requirement is in place to allow pedestrians to view the activity within the retail establishment and to
allow patrons and employees of the retail establishments to view the activity on
the sidewalk and street. |
Zoning | 02/16/2021 | Approved | 2. Please note that no signs are approved with this permit. |
Zoning | 02/16/2021 | Approved | Please be advised that additional comments may be forthcoming upon submission of revised plans. A comment response letter is required. |
Zoning | 02/16/2021 | Rejected | 1. Please verify on the exterior elevations that nothing will be installed in front of the windows to affect the transparency requirement. The requirement is in place to allow pedestrians to view the activity within the retail establishment and to
allow patrons and employees of the retail establishments to view the activity on
the sidewalk and street. |
Zoning | 02/16/2021 | Rejected | 2. Please note that no signs are approved with this permit. |
Zoning | 02/16/2021 | Rejected | Please be advised that additional comments may be forthcoming upon submission of revised plans. A comment response letter is required. |
Zoning | 02/16/2021 | Approved | Please be advised that additional comments may be forthcoming upon submission of revised plans. A comment response letter is required. |
Zoning | 02/16/2021 | Approved | 1. Please verify on the exterior elevations that nothing will be installed in front of the windows to affect the transparency requirement. The requirement is in place to allow pedestrians to view the activity within the retail establishment and to
allow patrons and employees of the retail establishments to view the activity on
the sidewalk and street. |
Zoning | 02/16/2021 | Approved | 2. Please note that no signs are approved with this permit. |
Zoning | 03/08/2021 | Approved | Please note that all signs are approved separately, including any window vinyls.
A Certificate of Occupancy is required for this space. |
Zoning | 03/08/2021 | Approved | Please note that all signs are approved separately, including any window vinyls.
A Certificate of Occupancy is required for this space. |
Zoning | 03/08/2021 | Approved | Please note that all signs are approved separately, including any window vinyls.
A Certificate of Occupancy is required for this space. |