Permit Comments
 
Permit #B2101411
Address900 ARMY NAVY DR
TypeCTBO
StatusACTIVE
Permit HolderJENNINGS L F INC
OwnerSTREET RETAIL INC
Applied Date15/06/2021
Approved Date13/09/2021
Date Issued13/09/2021
DescriptionTENANT FIT-OUT FOR NEW 33,970 SF TARGET STORE TO INCLUDE RETAIL SALES OF MERCHANDISE AND GROCERIES IN PREVIOUS BED BATH AND BEYOND SPACE. NO FOOD OR BEVERAGE PREPARATION. SPECIAL INSPECTION REQUIRED

ReviewReview DateStatusComments
Building06/21/2021ApprovedSheet A-307 RESTROOM PLAN ELEVATIONS: Clearance width at the water closet must be 60" in compliance with 604.3.1 and 604.3.3. ICC A117.1-09. The sink can not be in the required 60" width.
Building06/21/2021ApprovedSheet A-307 RESTROOM PLAN ELEVATIONS: The low drinking fountain requires a 30" width for forward approach centered on the fixture. It appears there is only 1'- 1 3/8" clearance to the left of the fixture. 1'-3" is required per ICC ANSI A117.1-09 602.2.
Building06/21/2021ApprovedSheet A-307 RESTROOM PLAN ELEVATIONS: Clearance width at the water closet must be 60" in compliance with 604.3.1 and 604.3.3. ICC A117.1-09. The sink can not be in the required 60" width.
Building06/21/2021ApprovedSheet A-307 RESTROOM PLAN ELEVATIONS: The low drinking fountain requires a 30" width for forward approach centered on the fixture. It appears there is only 1'- 1 3/8" clearance to the left of the fixture. 1'-3" is required per ICC ANSI A117.1-09 602.2.
Building06/21/2021ApprovedSheet A-307 RESTROOM PLAN ELEVATIONS: Clearance width at the water closet must be 60" in compliance with 604.3.1 and 604.3.3. ICC A117.1-09. The sink can not be in the required 60" width.
Building06/21/2021ApprovedSheet A-307 RESTROOM PLAN ELEVATIONS: The low drinking fountain requires a 30" width for forward approach centered on the fixture. It appears there is only 1'- 1 3/8" clearance to the left of the fixture. 1'-3" is required per ICC ANSI A117.1-09 602.2.
Building06/21/2021ApprovedSheet A-307 RESTROOM PLAN ELEVATIONS: Clearance width at the water closet must be 60" in compliance with 604.3.1 and 604.3.3. ICC A117.1-09. The sink can not be in the required 60" width.
Building06/21/2021ApprovedSheet A-307 RESTROOM PLAN ELEVATIONS: The low drinking fountain requires a 30" width for forward approach centered on the fixture. It appears there is only 1'- 1 3/8" clearance to the left of the fixture. 1'-3" is required per ICC ANSI A117.1-09 602.2.
Building06/21/2021RejectedSheet A-307 RESTROOM PLAN ELEVATIONS: Clearance width at the water closet must be 60" in compliance with 604.3.1 and 604.3.3. ICC A117.1-09. The sink can not be in the required 60" width.
Building06/21/2021RejectedSheet A-307 RESTROOM PLAN ELEVATIONS: The low drinking fountain requires a 30" width for forward approach centered on the fixture. It appears there is only 1'- 1 3/8" clearance to the left of the fixture. 1'-3" is required per ICC ANSI A117.1-09 602.2.
Building06/21/2021ApprovedSheet A-307 RESTROOM PLAN ELEVATIONS: Clearance width at the water closet must be 60" in compliance with 604.3.1 and 604.3.3. ICC A117.1-09. The sink can not be in the required 60" width.
Building06/21/2021ApprovedSheet A-307 RESTROOM PLAN ELEVATIONS: The low drinking fountain requires a 30" width for forward approach centered on the fixture. It appears there is only 1'- 1 3/8" clearance to the left of the fixture. 1'-3" is required per ICC ANSI A117.1-09 602.2.
Building06/28/2021ApprovedSheet A-611 OPENING SCHEDULE: Unable to locate door hardware schedule within this plan set. Please provide location information or submit door hardware schedule.
Building06/28/2021ApprovedSheet A-456 COOLER FREEZER: Is this wood blocking? If so it will need to be FRT.
Building06/28/2021ApprovedSheet A-454 COOLER FREEZER PLANS: Coolers/freezers shall comply with VCC 603 #26 and 2603.4.1.2. Plan sheet note. No response required if coolers/freezers are compliant with the referenced codes.
Building06/28/2021ApprovedSheet A-000G COVERSHEET: SUBMIT AUTOMATIC SUPPRESSION SHOP DRAWINGS FOR APPROVAL SUBMIT FIRE ALARM SHOP DRAWINGS FOR APPROVAL***** plan sheet comment, no response required.
Building06/28/2021RejectedSheet A-611 OPENING SCHEDULE: Unable to locate door hardware schedule within this plan set. Please provide location information or submit door hardware schedule.
Building06/28/2021RejectedSheet A-456 COOLER FREEZER: Is this wood blocking? If so it will need to be FRT.
Building06/28/2021ApprovedSheet A-611 OPENING SCHEDULE: Unable to locate door hardware schedule within this plan set. Please provide location information or submit door hardware schedule.
Building06/28/2021ApprovedSheet A-456 COOLER FREEZER: Is this wood blocking? If so it will need to be FRT.
Building06/28/2021ApprovedSheet A-454 COOLER FREEZER PLANS: Coolers/freezers shall comply with VCC 603 #26 and 2603.4.1.2. Plan sheet note. No response required if coolers/freezers are compliant with the referenced codes.
Building06/28/2021ApprovedSheet A-000G COVERSHEET: SUBMIT AUTOMATIC SUPPRESSION SHOP DRAWINGS FOR APPROVAL SUBMIT FIRE ALARM SHOP DRAWINGS FOR APPROVAL***** plan sheet comment, no response required.
Building06/28/2021RejectedSheet A-454 COOLER FREEZER PLANS: Coolers/freezers shall comply with VCC 603 #26 and 2603.4.1.2. Plan sheet note. No response required if coolers/freezers are compliant with the referenced codes.
Building06/28/2021RejectedSheet A-000G COVERSHEET: SUBMIT AUTOMATIC SUPPRESSION SHOP DRAWINGS FOR APPROVAL SUBMIT FIRE ALARM SHOP DRAWINGS FOR APPROVAL***** plan sheet comment, no response required.
Building06/28/2021ApprovedSheet A-611 OPENING SCHEDULE: Unable to locate door hardware schedule within this plan set. Please provide location information or submit door hardware schedule.
Building06/28/2021ApprovedSheet A-456 COOLER FREEZER: Is this wood blocking? If so it will need to be FRT.
Building06/28/2021ApprovedSheet A-454 COOLER FREEZER PLANS: Coolers/freezers shall comply with VCC 603 #26 and 2603.4.1.2. Plan sheet note. No response required if coolers/freezers are compliant with the referenced codes.
Building06/28/2021ApprovedSheet A-000G COVERSHEET: SUBMIT AUTOMATIC SUPPRESSION SHOP DRAWINGS FOR APPROVAL SUBMIT FIRE ALARM SHOP DRAWINGS FOR APPROVAL***** plan sheet comment, no response required.
Building06/28/2021ApprovedSheet A-611 OPENING SCHEDULE: Unable to locate door hardware schedule within this plan set. Please provide location information or submit door hardware schedule.
Building06/28/2021ApprovedSheet A-456 COOLER FREEZER: Is this wood blocking? If so it will need to be FRT.
Building06/28/2021ApprovedSheet A-454 COOLER FREEZER PLANS: Coolers/freezers shall comply with VCC 603 #26 and 2603.4.1.2. Plan sheet note. No response required if coolers/freezers are compliant with the referenced codes.
Building06/28/2021ApprovedSheet A-000G COVERSHEET: SUBMIT AUTOMATIC SUPPRESSION SHOP DRAWINGS FOR APPROVAL SUBMIT FIRE ALARM SHOP DRAWINGS FOR APPROVAL***** plan sheet comment, no response required.
Building06/28/2021ApprovedSheet A-611 OPENING SCHEDULE: Unable to locate door hardware schedule within this plan set. Please provide location information or submit door hardware schedule.
Building06/28/2021ApprovedSheet A-456 COOLER FREEZER: Is this wood blocking? If so it will need to be FRT.
Building06/28/2021ApprovedSheet A-454 COOLER FREEZER PLANS: Coolers/freezers shall comply with VCC 603 #26 and 2603.4.1.2. Plan sheet note. No response required if coolers/freezers are compliant with the referenced codes.
Building06/28/2021ApprovedSheet A-000G COVERSHEET: SUBMIT AUTOMATIC SUPPRESSION SHOP DRAWINGS FOR APPROVAL SUBMIT FIRE ALARM SHOP DRAWINGS FOR APPROVAL***** plan sheet comment, no response required.
Building07/01/2021ApprovedSheet A-456 COOLER FREEZER: Detail 7 shows pressure treated plywood. This building is required to have non combustible partition construction. The plywood attached to the studs would need to be non-combustible or FRT in compliance with VCC 603.
Building07/01/2021ApprovedSheet A-456 COOLER FREEZER: Detail 7 shows pressure treated plywood. This building is required to have non combustible partition construction. The plywood attached to the studs would need to be non-combustible or FRT in compliance with VCC 603.
Building07/01/2021ApprovedSheet A-456 COOLER FREEZER: Detail 7 shows pressure treated plywood. This building is required to have non combustible partition construction. The plywood attached to the studs would need to be non-combustible or FRT in compliance with VCC 603.
Building07/01/2021RejectedSheet A-456 COOLER FREEZER: Detail 7 shows pressure treated plywood. This building is required to have non combustible partition construction. The plywood attached to the studs would need to be non-combustible or FRT in compliance with VCC 603.
Building07/01/2021ApprovedSheet A-456 COOLER FREEZER: Detail 7 shows pressure treated plywood. This building is required to have non combustible partition construction. The plywood attached to the studs would need to be non-combustible or FRT in compliance with VCC 603.
Building07/01/2021ApprovedSheet A-456 COOLER FREEZER: Detail 7 shows pressure treated plywood. This building is required to have non combustible partition construction. The plywood attached to the studs would need to be non-combustible or FRT in compliance with VCC 603.
Building08/11/2021ApprovedSheet A-611 OPENING SCHEDULE: SEPARATE PLAN AND PERMIT REQUIRED FOR DOORS WITH SPECIAL LOCKING HARDWARE ***Plan sheet comment, No response required
Building08/11/2021ApprovedSheet A-611 OPENING SCHEDULE: SEPARATE PLAN AND PERMIT REQUIRED FOR DOORS WITH SPECIAL LOCKING HARDWARE ***Plan sheet comment, No response required
Building08/11/2021ApprovedSheet A-611 OPENING SCHEDULE: SEPARATE PLAN AND PERMIT REQUIRED FOR DOORS WITH SPECIAL LOCKING HARDWARE ***Plan sheet comment, No response required
Building08/11/2021ApprovedSheet A-611 OPENING SCHEDULE: SEPARATE PLAN AND PERMIT REQUIRED FOR DOORS WITH SPECIAL LOCKING HARDWARE ***Plan sheet comment, No response required
Building08/11/2021ApprovedSheet A-611 OPENING SCHEDULE: SEPARATE PLAN AND PERMIT REQUIRED FOR DOORS WITH SPECIAL LOCKING HARDWARE ***Plan sheet comment, No response required
DES:Water/Sewer Engineering08/12/2021ApprovedNO NEW DFU'S
Electrical06/25/2021ApprovedThere appears to be a discrepancy in the number of 'EXISTING RELOCATED', 75 KVA transformers in 'Electrical Room 113'. The One Line Diagram shown on sheet E611 shows a total of two to be relocated. However, the Electrical Floor Plan for this room, shown on sheet E355, only references one. Please clarify.
Electrical06/25/2021RejectedThere appears to be a discrepancy in the number of 'EXISTING RELOCATED', 75 KVA transformers in 'Electrical Room 113'. The One Line Diagram shown on sheet E611 shows a total of two to be relocated. However, the Electrical Floor Plan for this room, shown on sheet E355, only references one. Please clarify.
Electrical06/25/2021RejectedThere appears to be a discrepancy in the number of 'EXISTING RELOCATED', 75 KVA transformers in 'Electrical Room 113'. The One Line Diagram shown on sheet E611 shows a total of two to be relocated. However, the Electrical Floor Plan for this room, shown on sheet E355, only references one. Please clarify.
Electrical06/25/2021ApprovedThere appears to be a discrepancy in the number of 'EXISTING RELOCATED', 75 KVA transformers in 'Electrical Room 113'. The One Line Diagram shown on sheet E611 shows a total of two to be relocated. However, the Electrical Floor Plan for this room, shown on sheet E355, only references one. Please clarify.
Electrical06/25/2021ApprovedThere appears to be a discrepancy in the number of 'EXISTING RELOCATED', 75 KVA transformers in 'Electrical Room 113'. The One Line Diagram shown on sheet E611 shows a total of two to be relocated. However, the Electrical Floor Plan for this room, shown on sheet E355, only references one. Please clarify.
Electrical06/25/2021RejectedThere appears to be a discrepancy in the number of 'EXISTING RELOCATED', 75 KVA transformers in 'Electrical Room 113'. The One Line Diagram shown on sheet E611 shows a total of two to be relocated. However, the Electrical Floor Plan for this room, shown on sheet E355, only references one. Please clarify.
Electrical06/30/2021RejectedAdditional comments may be forthcoming.
Electrical06/30/2021ApprovedAdditional comments may be forthcoming.
Electrical06/30/2021ApprovedAdditional comments may be forthcoming.
Electrical06/30/2021RejectedAdditional comments may be forthcoming.
Electrical06/30/2021RejectedAdditional comments may be forthcoming.
Electrical06/30/2021ApprovedAdditional comments may be forthcoming.
Electrical10/26/2021RejectedIn this latest review cycle dated (10-13-2021), the designer has made several revisions. Please 'CLOUD' all changes/revisions on each revised sheet. That way, the electrical plans examiner can see the changes and compare the sheets as needed. For example, the Electrical Revision Narrative dated 9-27-2021, references several changes to various sheets. None of these changes are 'clouded' on their respected sheets. Please clarify.
Electrical10/26/2021RejectedOn sheet E611, the 'revised' riser diagram shows a 'new' fire pump to be installed. Indicate on the drawings how this new 'tap' will be made to the existing buss bars. For example, are there pre-existing holes currently in the buss bars or will the buss bars need to be drilled to attach the new lugs. NOTE: if the buss is required to be 'drilled' or 'altered' in order to make the tap, the existing switchboard will be 'required' to be re-tested and re-labeled by UL or an approved Electrical Testing Company. And, the UL or Electrical Testing Companies name and contact information 'MUST' be included on the electrical drawings. Section 109.3 of the Virginia Construction Code.
Electrical10/26/2021RejectedIndicate on the drawings the 'size' of the 'main' over current protection device used for the 'new' fire pump service. Refer to riser diagram shown on sheet E611. Section 109.3 of the Virginia Construction Code.
Electrical10/26/2021RejectedBased on the lack of information provided, the above comments may not constitute a complete list of requested information. Additional design information is required for the county to review for code compliance. Section 109.3 of the Virginia Construction Code.
Electrical10/26/2021RejectedIn this latest review cycle dated (10-13-2021), the designer has made several revisions. Please 'CLOUD' all changes/revisions on each revised sheet. That way, the electrical plans examiner can see the changes and compare the sheets as needed. For example, the Electrical Revision Narrative dated 9-27-2021, references several changes to various sheets. None of these changes are 'clouded' on their respected sheets. Please clarify.
Electrical10/26/2021RejectedOn sheet E611, the 'revised' riser diagram shows a 'new' fire pump to be installed. Indicate on the drawings how this new 'tap' will be made to the existing buss bars. For example, are there pre-existing holes currently in the buss bars or will the buss bars need to be drilled to attach the new lugs. NOTE: if the buss is required to be 'drilled' or 'altered' in order to make the tap, the existing switchboard will be 'required' to be re-tested and re-labeled by UL or an approved Electrical Testing Company. And, the UL or Electrical Testing Companies name and contact information 'MUST' be included on the electrical drawings. Section 109.3 of the Virginia Construction Code.
Electrical10/26/2021RejectedIndicate on the drawings the 'size' of the 'main' over current protection device used for the 'new' fire pump service. Refer to riser diagram shown on sheet E611. Section 109.3 of the Virginia Construction Code.
Electrical10/26/2021Rejected 
Electrical10/26/2021RejectedBased on the lack of information provided, the above comments may not constitute a complete list of requested information. Additional design information is required for the county to review for code compliance. Section 109.3 of the Virginia Construction Code.
Electrical10/26/2021ApprovedIn this latest review cycle dated (10-13-2021), the designer has made several revisions. Please 'CLOUD' all changes/revisions on each revised sheet. That way, the electrical plans examiner can see the changes and compare the sheets as needed. For example, the Electrical Revision Narrative dated 9-27-2021, references several changes to various sheets. None of these changes are 'clouded' on their respected sheets. Please clarify.
Electrical10/26/2021ApprovedOn sheet E611, the 'revised' riser diagram shows a 'new' fire pump to be installed. Indicate on the drawings how this new 'tap' will be made to the existing buss bars. For example, are there pre-existing holes currently in the buss bars or will the buss bars need to be drilled to attach the new lugs. NOTE: if the buss is required to be 'drilled' or 'altered' in order to make the tap, the existing switchboard will be 'required' to be re-tested and re-labeled by UL or an approved Electrical Testing Company. And, the UL or Electrical Testing Companies name and contact information 'MUST' be included on the electrical drawings. Section 109.3 of the Virginia Construction Code.
Electrical10/26/2021ApprovedIndicate on the drawings the 'size' of the 'main' over current protection device used for the 'new' fire pump service. Refer to riser diagram shown on sheet E611. Section 109.3 of the Virginia Construction Code.
Electrical10/26/2021ApprovedBased on the lack of information provided, the above comments may not constitute a complete list of requested information. Additional design information is required for the county to review for code compliance. Section 109.3 of the Virginia Construction Code.
Electrical11/30/2021ApprovedIn this latest review cycle #5 (11-12-2021), there are still two previous comments that have not been addressed. As a courtesy, the Electrical Plans Examiner attempted to contact the designer today at 10:47 am, via phone. However, the designer for this particular project was unavailable. After leaving my name and contact information with the office personnel, I was informed that someone by the name of 'Sam' would call me back.
Electrical11/30/2021RejectedIn this latest review cycle #5 (11-12-2021), there are still two previous comments that have not been addressed. As a courtesy, the Electrical Plans Examiner attempted to contact the designer today at 10:47 am, via phone. However, the designer for this particular project was unavailable. After leaving my name and contact information with the office personnel, I was informed that someone by the name of 'Sam' would call me back.
Energy07/02/2021ApprovedThe plumbing drawings indicate that a hot water circulating pump is part of the scope of the permit. The piping that is part of the hot water circulation system (both supply and return sides) must be insulated in accordance with Section C404.4 and Table C403.2.10 of the 2015 Virginia Energy Conservation Code (VECC). Also, hot water piping from the water heater to the termination of the heated water fixture supply pipe shall be insulated in accordance with Table C403.2.10 of the 2015 VECC. In the resubmission, revise the drawings to include a piping insulation schedule that meets or exceeds the minimum requirements of section C404.4 the 2015 VECC. State on the drawings where the insulation will be installed. The drawings clearly state t
Energy07/02/2021ApprovedThe plumbing drawings indicate that a hot water recirculation system is part of the scope of the permit. The pump is required by section C404.6.1 of the 2015 VECC to be fitted with automatic controls to turn off the recirculation pump when there is no hot water demand. In the resubmission, show automatic controls that will shut down the hot water recirculation pump when there is no hot water demand. State the sequence of operations for the controls on the drawings.
Energy07/02/2021RejectedThe plumbing drawings indicate that a hot water circulating pump is part of the scope of the permit. The piping that is part of the hot water circulation system (both supply and return sides) must be insulated in accordance with Section C404.4 and Table C403.2.10 of the 2015 Virginia Energy Conservation Code (VECC). Also, hot water piping from the water heater to the termination of the heated water fixture supply pipe shall be insulated in accordance with Table C403.2.10 of the 2015 VECC. In the resubmission, revise the drawings to include a piping insulation schedule that meets or exceeds the minimum requirements of section C404.4 the 2015 VECC. State on the drawings where the insulation will be installed. The drawings clearly state t
Energy07/02/2021RejectedThe plumbing drawings indicate that a hot water recirculation system is part of the scope of the permit. The pump is required by section C404.6.1 of the 2015 VECC to be fitted with automatic controls to turn off the recirculation pump when there is no hot water demand. In the resubmission, show automatic controls that will shut down the hot water recirculation pump when there is no hot water demand. State the sequence of operations for the controls on the drawings.
Energy07/02/2021ApprovedThe plumbing drawings indicate that a hot water circulating pump is part of the scope of the permit. The piping that is part of the hot water circulation system (both supply and return sides) must be insulated in accordance with Section C404.4 and Table C403.2.10 of the 2015 Virginia Energy Conservation Code (VECC). Also, hot water piping from the water heater to the termination of the heated water fixture supply pipe shall be insulated in accordance with Table C403.2.10 of the 2015 VECC. In the resubmission, revise the drawings to include a piping insulation schedule that meets or exceeds the minimum requirements of section C404.4 the 2015 VECC. State on the drawings where the insulation will be installed. The drawings clearly state t
Energy07/02/2021ApprovedThe plumbing drawings indicate that a hot water recirculation system is part of the scope of the permit. The pump is required by section C404.6.1 of the 2015 VECC to be fitted with automatic controls to turn off the recirculation pump when there is no hot water demand. In the resubmission, show automatic controls that will shut down the hot water recirculation pump when there is no hot water demand. State the sequence of operations for the controls on the drawings.
Energy07/02/2021ApprovedThe plumbing drawings indicate that a hot water circulating pump is part of the scope of the permit. The piping that is part of the hot water circulation system (both supply and return sides) must be insulated in accordance with Section C404.4 and Table C403.2.10 of the 2015 Virginia Energy Conservation Code (VECC). Also, hot water piping from the water heater to the termination of the heated water fixture supply pipe shall be insulated in accordance with Table C403.2.10 of the 2015 VECC. In the resubmission, revise the drawings to include a piping insulation schedule that meets or exceeds the minimum requirements of section C404.4 the 2015 VECC. State on the drawings where the insulation will be installed. The drawings clearly state t
Energy07/02/2021ApprovedThe plumbing drawings indicate that a hot water recirculation system is part of the scope of the permit. The pump is required by section C404.6.1 of the 2015 VECC to be fitted with automatic controls to turn off the recirculation pump when there is no hot water demand. In the resubmission, show automatic controls that will shut down the hot water recirculation pump when there is no hot water demand. State the sequence of operations for the controls on the drawings.
Environmental Services07/06/2021ApprovedSheet P-102 PLUMBING ENLARGEMENT: Please provide a list of all the new plumbing fixtures being installed. (ex. Water Closet, Lav, Sinks, Floor Drains, etc...)
Environmental Services07/06/2021RejectedSheet P-102 PLUMBING ENLARGEMENT: Please provide a list of all the new plumbing fixtures being installed. (ex. Water Closet, Lav, Sinks, Floor Drains, etc...)
Environmental Services07/06/2021ApprovedSheet P-102 PLUMBING ENLARGEMENT: Please provide a list of all the new plumbing fixtures being installed. (ex. Water Closet, Lav, Sinks, Floor Drains, etc...)
Environmental Services07/06/2021ApprovedSheet P-102 PLUMBING ENLARGEMENT: Please provide a list of all the new plumbing fixtures being installed. (ex. Water Closet, Lav, Sinks, Floor Drains, etc...)
Environmental Services07/06/2021ApprovedSheet P-102 PLUMBING ENLARGEMENT: Please provide a list of all the new plumbing fixtures being installed. (ex. Water Closet, Lav, Sinks, Floor Drains, etc...)
Environmental Services07/06/2021ApprovedSheet P-102 PLUMBING ENLARGEMENT: Please provide a list of all the new plumbing fixtures being installed. (ex. Water Closet, Lav, Sinks, Floor Drains, etc...)
EPlan Review09/13/2021Approved 
Mechanical06/24/2021ApprovedPlease provide minimum OA requirements per section 403.2.1 and table 403.3.1 IMC2015 (06.24.21) Further comments maybe forthcoming upon resubmission.
Mechanical06/24/2021RejectedPlease provide minimum OA requirements per section 403.2.1 and table 403.3.1 IMC2015 (06.24.21) Further comments maybe forthcoming upon resubmission.
Mechanical06/24/2021RejectedPlease provide minimum OA requirements per section 403.2.1 and table 403.3.1 IMC2015 (06.24.21) Further comments maybe forthcoming upon resubmission.
Mechanical08/13/2021RejectedPlease provide clarity regarding Occupancy Density for Conference Rooms illustrates 50 per table 403.3.1 VMC (08.13.21)
Mechanical08/13/2021ApprovedPlease provide clarity regarding Occupancy Density for Conference Rooms illustrates 50 per table 403.3.1 VMC (08.13.21)
Plumbing06/29/2021Rejected6-29-21 Pg P200 3 Compartment Sink, Air Gaps required. 2015 VPC 802.1 Please provide venting for Flow Control. Applicant description states No Food Prep, What is the intent of the Grease Interceptor? Please include complete GI calculation?
Plumbing06/29/2021Approved6-29-21 Pg P200 3 Compartment Sink, Air Gaps required. 2015 VPC 802.1 Please provide venting for Flow Control. Applicant description states No Food Prep, What is the intent of the Grease Interceptor? Please include complete GI calculation?
Plumbing06/29/2021Approved6-29-21 Pg P200 3 Compartment Sink, Air Gaps required. 2015 VPC 802.1 Please provide venting for Flow Control. Applicant description states No Food Prep, What is the intent of the Grease Interceptor? Please include complete GI calculation?
Public Health Division11/19/2021ApprovedSheet Food Service Plan Review Application: A Certified Food Protection Manager is required during all hours of operation. Confirm there will be a Certified Food Protection Manager during pre-opening inspection and also during all hours of operation.
Public Health Division11/19/2021ApprovedSheet Food Service Plan Review Application: A Certified Food Protection Manager is required during all hours of operation. Confirm there will be a Certified Food Protection Manager during pre-opening inspection and also during all hours of operation.
Special Inspection Required07/02/2021NOTATIONNeed SSI
Special Inspection Required08/20/2021ApprovedSSI OK. OFFLINK. (mech will reject this cycle though). Send SSI to SIER after eplan approval.
Special Inspection Required09/10/2021NOTATIONjust a cycle
Structural07/02/2021Rejected"The Statement of Special Inspection needs to be filled-in & submitted: MUST HAVE: 1). OWNER, SIER, SER, & GC Contact information & Signatures, correct permit #, project address. 2). Initialed inspection boxes (applicable inspections) by SER & SIER 3). Owner, SIER, & SER signatures on inspections sheets. The statement of special inspection is used by the structural engineer of record (SER) to identify the structural items that require special inspection. This is a legal statement that shall be filled out by the Structural Engineer of Record (SER). All applicable item lines of inspection shall be initialed by both the structural engineer of record (SER) and the special inspection engineer of record (SIER). This statement must contain signa
Structural07/02/2021Approved"The Statement of Special Inspection needs to be filled-in & submitted: MUST HAVE: 1). OWNER, SIER, SER, & GC Contact information & Signatures, correct permit #, project address. 2). Initialed inspection boxes (applicable inspections) by SER & SIER 3). Owner, SIER, & SER signatures on inspections sheets. The statement of special inspection is used by the structural engineer of record (SER) to identify the structural items that require special inspection. This is a legal statement that shall be filled out by the Structural Engineer of Record (SER). All applicable item lines of inspection shall be initialed by both the structural engineer of record (SER) and the special inspection engineer of record (SIER). This statement must contain signa
Structural07/02/2021Approved"The Statement of Special Inspection needs to be filled-in & submitted: MUST HAVE: 1). OWNER, SIER, SER, & GC Contact information & Signatures, correct permit #, project address. 2). Initialed inspection boxes (applicable inspections) by SER & SIER 3). Owner, SIER, & SER signatures on inspections sheets. The statement of special inspection is used by the structural engineer of record (SER) to identify the structural items that require special inspection. This is a legal statement that shall be filled out by the Structural Engineer of Record (SER). All applicable item lines of inspection shall be initialed by both the structural engineer of record (SER) and the special inspection engineer of record (SIER). This statement must contain signa
Zoning07/07/2021ApprovedPlease be advised that additional comments may be forthcoming upon submission of revised plans. A comment response letter is required.
Zoning07/07/2021Approved1. It appears exterior modifications are proposed. Please also be cognizant of any transparency requirements for this site plan and PDSP. Any façade changes require the submission, review, and approval of an administrative change. Please note that the approved admin change must match the building permit and vice versa. https://building.arlingtonva.us/permits/admin-change/
Zoning07/07/2021Approved2. Please provide the path to the required trash/recycling area and the loading dock area.
Zoning07/07/2021ApprovedPlease be advised that additional comments may be forthcoming upon submission of revised plans. A comment response letter is required.
Zoning07/07/2021Approved1. It appears exterior modifications are proposed. Please also be cognizant of any transparency requirements for this site plan and PDSP. Any façade changes require the submission, review, and approval of an administrative change. Please note that the approved admin change must match the building permit and vice versa. https://building.arlingtonva.us/permits/admin-change/
Zoning07/07/2021Approved2. Please provide the path to the required trash/recycling area and the loading dock area.
Zoning07/07/2021RejectedPlease be advised that additional comments may be forthcoming upon submission of revised plans. A comment response letter is required.
Zoning07/07/2021Rejected1. It appears exterior modifications are proposed. Please also be cognizant of any transparency requirements for this site plan and PDSP. Any façade changes require the submission, review, and approval of an administrative change. Please note that the approved admin change must match the building permit and vice versa. https://building.arlingtonva.us/permits/admin-change/
Zoning07/07/2021Rejected2. Please provide the path to the required trash/recycling area and the loading dock area.
Zoning07/07/2021ApprovedPlease be advised that additional comments may be forthcoming upon submission of revised plans. A comment response letter is required.
Zoning07/07/2021Approved1. It appears exterior modifications are proposed. Please also be cognizant of any transparency requirements for this site plan and PDSP. Any façade changes require the submission, review, and approval of an administrative change. Please note that the approved admin change must match the building permit and vice versa. https://building.arlingtonva.us/permits/admin-change/
Zoning07/07/2021Approved2. Please provide the path to the required trash/recycling area and the loading dock area.
Zoning07/07/2021ApprovedPlease be advised that additional comments may be forthcoming upon submission of revised plans. A comment response letter is required.
Zoning07/07/2021Approved1. It appears exterior modifications are proposed. Please also be cognizant of any transparency requirements for this site plan and PDSP. Any façade changes require the submission, review, and approval of an administrative change. Please note that the approved admin change must match the building permit and vice versa. https://building.arlingtonva.us/permits/admin-change/
Zoning07/07/2021Approved2. Please provide the path to the required trash/recycling area and the loading dock area.
Zoning07/07/2021ApprovedPlease be advised that additional comments may be forthcoming upon submission of revised plans. A comment response letter is required.
Zoning07/07/2021Approved1. It appears exterior modifications are proposed. Please also be cognizant of any transparency requirements for this site plan and PDSP. Any façade changes require the submission, review, and approval of an administrative change. Please note that the approved admin change must match the building permit and vice versa. https://building.arlingtonva.us/permits/admin-change/
Zoning07/07/2021Approved2. Please provide the path to the required trash/recycling area and the loading dock area.
Zoning08/17/2021ApprovedNo signs are approved with this permit. A new Certificate of Occupancy is required for this space.
Zoning08/17/2021ApprovedNo signs are approved with this permit. A new Certificate of Occupancy is required for this space.
Zoning08/17/2021ApprovedNo signs are approved with this permit. A new Certificate of Occupancy is required for this space.
Zoning08/17/2021ApprovedNo signs are approved with this permit. A new Certificate of Occupancy is required for this space.
Zoning08/17/2021ApprovedNo signs are approved with this permit. A new Certificate of Occupancy is required for this space.