Permit Comments
 
Permit #B2101836
Address1101 S JOYCE ST
TypeCTBO
StatusACTIVE
Permit HolderCRAVER, LOUISE KELLY
OwnerPOST APARTMENT HOMES LP %MAA SCHINDLER #216400
Applied Date30/07/2021
Approved Date24/02/2022
Date Issued28/02/2022
DescriptionINTERIOR ALTERATION OF AN EXISTING 2,202SF TENANT SPACE INTO A PROPOSED RESTORE HYPER WELLNESS & CRYOTHERAPY.

ReviewReview DateStatusComments
Building02/14/2022ApprovedSheet A-300-Enlarged Restroom and Elevations: Per Accessibility Standard ICC A-117.1-2009 Sect. 608.2.1.2 - A clearance of 48” minimum in length measured perpendicular from the control wall, and 36” minimum in depth shall be provided adjacent to the open face oof the compartment. Referenced Sheet: A-1.1, A-2.1
Building02/14/2022ApprovedSheet A-000-Cover Sheet: NOTE: SUBMIT AUTOMATIC SUPPRESSION SHOP DRAWINGS FOR APPROVAL SUBMIT FIRE ALARM SHOP DRAWINGS FOR APPROVAL
Building02/15/2022ApprovedSheet Accessibility Compliance Form: Per communication with RDP via 02/14/2020 email and phone call 02/15/2020, Box one is selected. Otherwise please resubmit with the appropriate box selected.
Building02/15/2022ApprovedSheet A-103-Dimensioned Floor Plan: See Code Modification CMOD21-00060 for modification to accessible route provision. for the Cryo chamber.
Building08/19/2021ApprovedSheet A-601-Millwork Elevations: Approved with the Following General Comment for ALL Powered Furniture and Millwork: Millwork at the Reception Desk appears to be constructed with electrical outlets Built-in to them. We review these like Wall Partitions. As such all wood framing and blocking provided within the framing cavity shall be Fire-Retardant Treated (FRT) Wood per VCC, Section 603.1.1 #1.1; as required for Types I & II Construction. Please coordinate in field. No response required.
Building08/19/2021ApprovedApproved with the Following General Comment for ALL Powered Furniture and Millwork: Millwork at the Reception Desk appears to be constructed with electrical outlets Built-in to them. We review these like Wall Partitions. As such all wood framing and blocking provided within the framing cavity shall be Fire-Retardant Treated (FRT) Wood per VCC, Section 603.1.1 #1.1; as required for Types I & II Construction. Please coordinate in field. No response required.
Building09/24/2021ApprovedSheet A-601-Millwork Elevations: Approved with the Following General Comment for ALL Powered Furniture and Millwork: Millwork at the Reception Desk appears to be constructed with electrical outlets Built-in to them. We review these like Wall Partitions. As such all wood framing and blocking provided within the framing cavity shall be Fire-Retardant Treated (FRT) Wood per VCC, Section 603.1.1 #1.1; as required for Types I & II Construction. Please coordinate in field. No response required. **************************09/24/2021************************************ Comment response acknowledge. Drawings are being resubmitted for comments in other disciplines, please revise non-compliant plywood is indicated to show FRT wood as required by
Building09/24/2021AdditionalSheet A-601-Millwork Elevations: Approved with the Following General Comment for ALL Powered Furniture and Millwork: Millwork at the Reception Desk appears to be constructed with electrical outlets Built-in to them. We review these like Wall Partitions. As such all wood framing and blocking provided within the framing cavity shall be Fire-Retardant Treated (FRT) Wood per VCC, Section 603.1.1 #1.1; as required for Types I & II Construction. Please coordinate in field. No response required. **************************09/24/2021************************************ Comment response acknowledge. Drawings are being resubmitted for comments in other disciplines, please revise non-compliant plywood is indicated to show FRT wood as required by
Building09/24/2021RejectedSheet A-601-Millwork Elevations: Approved with the Following General Comment for ALL Powered Furniture and Millwork: Millwork at the Reception Desk appears to be constructed with electrical outlets Built-in to them. We review these like Wall Partitions. As such all wood framing and blocking provided within the framing cavity shall be Fire-Retardant Treated (FRT) Wood per VCC, Section 603.1.1 #1.1; as required for Types I & II Construction. Please coordinate in field. No response required. **************************09/24/2021************************************ Comment response acknowledge. Drawings are being resubmitted for comments in other disciplines, please revise non-compliant plywood is indicated to show FRT wood as required by
Building09/24/2021RejectedApproved with the Following General Comment for ALL Powered Furniture and Millwork: Millwork at the Reception Desk appears to be constructed with electrical outlets Built-in to them. We review these like Wall Partitions. As such all wood framing and blocking provided within the framing cavity shall be Fire-Retardant Treated (FRT) Wood per VCC, Section 603.1.1 #1.1; as required for Types I & II Construction. Please coordinate in field. No response required. **************************09/24/2021************************************ Comment response acknowledge. Drawings are being resubmitted for comments in other disciplines, please revise non-compliant plywood is indicated to show FRT wood as required by VCC, Section 603.1.1 #1.1 when re
Building09/24/2021ApprovedSheet A-601-Millwork Elevations: Approved with the Following General Comment for ALL Powered Furniture and Millwork: Millwork at the Reception Desk appears to be constructed with electrical outlets Built-in to them. We review these like Wall Partitions. As such all wood framing and blocking provided within the framing cavity shall be Fire-Retardant Treated (FRT) Wood per VCC, Section 603.1.1 #1.1; as required for Types I & II Construction. Please coordinate in field. No response required. **************************09/24/2021************************************ Comment response acknowledge. Drawings are being resubmitted for comments in other disciplines, please revise non-compliant plywood is indicated to show FRT wood as required by
Building10/18/2021ApprovedApproved with the Following General Comment for ALL Powered Furniture and Millwork: Millwork at the Reception Desk appears to be constructed with electrical outlets Built-in to them. We review these like Wall Partitions. As such all wood framing and blocking provided within the framing cavity shall be Fire-Retardant Treated (FRT) Wood per VCC, Section 603.1.1 #1.1; as required for Types I & II Construction. Please coordinate in field. No response required. **************************09/24/2021************************************ Comment response acknowledge. Drawings are being resubmitted for comments in other disciplines, please revise non-compliant plywood is indicated to show FRT wood as required by VCC, Section 603.1.1 #1.1 when re
Building10/18/2021AdditionalApproved with the Following General Comment for ALL Powered Furniture and Millwork: Millwork at the Reception Desk appears to be constructed with electrical outlets Built-in to them. We review these like Wall Partitions. As such all wood framing and blocking provided within the framing cavity shall be Fire-Retardant Treated (FRT) Wood per VCC, Section 603.1.1 #1.1; as required for Types I & II Construction. Please coordinate in field. No response required. **************************09/24/2021************************************ Comment response acknowledge. Drawings are being resubmitted for comments in other disciplines, please revise non-compliant plywood is indicated to show FRT wood as required by VCC, Section 603.1.1 #1.1 when re
Building10/18/2021ApprovedApproved with the Following General Comment for ALL Powered Furniture and Millwork: Millwork at the Reception Desk appears to be constructed with electrical outlets Built-in to them. We review these like Wall Partitions. As such all wood framing and blocking provided within the framing cavity shall be Fire-Retardant Treated (FRT) Wood per VCC, Section 603.1.1 #1.1; as required for Types I & II Construction. Please coordinate in field. No response required. **************************09/24/2021************************************ Comment response acknowledge. Drawings are being resubmitted for comments in other disciplines, please revise non-compliant plywood is indicated to show FRT wood as required by VCC, Section 603.1.1 #1.1 when re
Building11/10/2021ApprovedPlan review cycle ended and plans returned at submitter's request to complete upload. Please upload a completed Accessibility Compliance Form and the Asbestos Inspections and Awareness Forms
Building11/10/2021AdditionalPlan review cycle ended and plans returned at submitter's request to complete upload. Please upload a completed Accessibility Compliance Form and the Asbestos Inspections and Awareness Forms
DES:Water/Sewer Engineering08/25/2021Approved15 NEW DFU'S
Energy08/25/2021AdditionalThe architectural drawings indicate that new building thermal envelope (BTE) doors are part of the scope of the permit. It is unclear if these doors satisfy the U-factor and SHGC requirements of Table C402.4 of the 2015 Virginia Energy Conservation Code (VECC). In addition, it is unclear if the new BTE doors will satisfy the air infiltration requirements of Table C402.5.2 of the 2015 VECC. In the resubmission, revise the door schedule to indicate which doors are part of the BTE. State the U-factor, SHGC and air infiltration rates for the BTE doors on the drawings.
Energy08/25/2021AdditionalThe permit submission has not included a complete, signed and stamped interior lighting COMcheck on a full size sheet in the drawing submission. This is required to demonstrate compliance with Section C405.4 of the 2015 Virginia Energy Conservation Code (VECC). The COMcheck calculation may be used with the 2015 IECC as the applicable code.
Energy08/25/2021AdditionalThe plumbing drawings indicate that new heated water supply piping is part of the scope of the permit. It is unclear how the new piping will satisfy the requirements of section C404.5 (Efficient heated water supply piping) of the 2015 VECC. In the resubmission, revise the heated water supply piping design to satisfy the requirements of this section.
Energy08/25/2021RejectedThe architectural drawings indicate that new building thermal envelope (BTE) doors are part of the scope of the permit. It is unclear if these doors satisfy the U-factor and SHGC requirements of Table C402.4 of the 2015 Virginia Energy Conservation Code (VECC). In addition, it is unclear if the new BTE doors will satisfy the air infiltration requirements of Table C402.5.2 of the 2015 VECC. In the resubmission, revise the door schedule to indicate which doors are part of the BTE. State the U-factor, SHGC and air infiltration rates for the BTE doors on the drawings.
Energy08/25/2021RejectedThe electrical light fixture schedule does not state the “total input power” (Watts) of each light fixture type. This value must be stated on the lighting schedule to validate the lighting COMcheck calculations that demonstrate compliance with section C405.4 of the 2015 VECC. In the resubmission, revise the lighting schedule to state the total input power (Watts) of each fixture type.
Energy08/25/2021RejectedThe permit submission has not included a complete, signed and stamped interior lighting COMcheck on a full size sheet in the drawing submission. This is required to demonstrate compliance with Section C405.4 of the 2015 Virginia Energy Conservation Code (VECC). The COMcheck calculation may be used with the 2015 IECC as the applicable code.
Energy08/25/2021RejectedThe plumbing drawings indicate that new heated water supply piping is part of the scope of the permit. It is unclear how the new piping will satisfy the requirements of section C404.5 (Efficient heated water supply piping) of the 2015 VECC. In the resubmission, revise the heated water supply piping design to satisfy the requirements of this section.
Energy08/25/2021ApprovedThe architectural drawings indicate that new building thermal envelope (BTE) doors are part of the scope of the permit. It is unclear if these doors satisfy the U-factor and SHGC requirements of Table C402.4 of the 2015 Virginia Energy Conservation Code (VECC). In addition, it is unclear if the new BTE doors will satisfy the air infiltration requirements of Table C402.5.2 of the 2015 VECC. In the resubmission, revise the door schedule to indicate which doors are part of the BTE. State the U-factor, SHGC and air infiltration rates for the BTE doors on the drawings.
Energy08/25/2021ApprovedThe permit submission has not included a complete, signed and stamped interior lighting COMcheck on a full size sheet in the drawing submission. This is required to demonstrate compliance with Section C405.4 of the 2015 Virginia Energy Conservation Code (VECC). The COMcheck calculation may be used with the 2015 IECC as the applicable code.
Energy08/25/2021ApprovedThe plumbing drawings indicate that new heated water supply piping is part of the scope of the permit. It is unclear how the new piping will satisfy the requirements of section C404.5 (Efficient heated water supply piping) of the 2015 VECC. In the resubmission, revise the heated water supply piping design to satisfy the requirements of this section.
Energy08/25/2021ApprovedThe architectural drawings indicate that new building thermal envelope (BTE) doors are part of the scope of the permit. It is unclear if these doors satisfy the U-factor and SHGC requirements of Table C402.4 of the 2015 Virginia Energy Conservation Code (VECC). In addition, it is unclear if the new BTE doors will satisfy the air infiltration requirements of Table C402.5.2 of the 2015 VECC. In the resubmission, revise the door schedule to indicate which doors are part of the BTE. State the U-factor, SHGC and air infiltration rates for the BTE doors on the drawings.
Energy08/25/2021ApprovedThe permit submission has not included a complete, signed and stamped interior lighting COMcheck on a full size sheet in the drawing submission. This is required to demonstrate compliance with Section C405.4 of the 2015 Virginia Energy Conservation Code (VECC). The COMcheck calculation may be used with the 2015 IECC as the applicable code.
Energy08/25/2021ApprovedThe plumbing drawings indicate that new heated water supply piping is part of the scope of the permit. It is unclear how the new piping will satisfy the requirements of section C404.5 (Efficient heated water supply piping) of the 2015 VECC. In the resubmission, revise the heated water supply piping design to satisfy the requirements of this section.
Energy08/25/2021ApprovedThe architectural drawings indicate that new building thermal envelope (BTE) doors are part of the scope of the permit. It is unclear if these doors satisfy the U-factor and SHGC requirements of Table C402.4 of the 2015 Virginia Energy Conservation Code (VECC). In addition, it is unclear if the new BTE doors will satisfy the air infiltration requirements of Table C402.5.2 of the 2015 VECC. In the resubmission, revise the door schedule to indicate which doors are part of the BTE. State the U-factor, SHGC and air infiltration rates for the BTE doors on the drawings.
Energy08/25/2021ApprovedThe permit submission has not included a complete, signed and stamped interior lighting COMcheck on a full size sheet in the drawing submission. This is required to demonstrate compliance with Section C405.4 of the 2015 Virginia Energy Conservation Code (VECC). The COMcheck calculation may be used with the 2015 IECC as the applicable code.
Energy08/25/2021ApprovedThe plumbing drawings indicate that new heated water supply piping is part of the scope of the permit. It is unclear how the new piping will satisfy the requirements of section C404.5 (Efficient heated water supply piping) of the 2015 VECC. In the resubmission, revise the heated water supply piping design to satisfy the requirements of this section.
Energy10/01/2021ApprovedThe electrical light fixture schedule does not state the “total input power” (Watts) of each light fixture type. This value must be stated on the lighting schedule to validate the lighting COMcheck calculations that demonstrate compliance with section C405.4 of the 2015 VECC. In the resubmission, revise the lighting schedule to state the total input power (Watts) of each fixture type.
Energy10/01/2021ApprovedThe electrical light fixture schedule does not state the “total input power” (Watts) of each light fixture type. This value must be stated on the lighting schedule to validate the lighting COMcheck calculations that demonstrate compliance with section C405.4 of the 2015 VECC. In the resubmission, revise the lighting schedule to state the total input power (Watts) of each fixture type.
Energy10/01/2021ApprovedThe electrical light fixture schedule does not state the “total input power” (Watts) of each light fixture type. This value must be stated on the lighting schedule to validate the lighting COMcheck calculations that demonstrate compliance with section C405.4 of the 2015 VECC. In the resubmission, revise the lighting schedule to state the total input power (Watts) of each fixture type.
Energy10/01/2021AdditionalThe electrical light fixture schedule does not state the “total input power” (Watts) of each light fixture type. This value must be stated on the lighting schedule to validate the lighting COMcheck calculations that demonstrate compliance with section C405.4 of the 2015 VECC. In the resubmission, revise the lighting schedule to state the total input power (Watts) of each fixture type.
EPlan Review02/24/2022ApprovedApproved
Mechanical08/20/2021AdditionalProvide missing duct sizes for installation and balancing purposes per section 109.3 VMC2018. (dryer exhaust and more see mark ups please)
Mechanical08/20/2021AdditionalProvide dryer exhaust booster fan listing and that it complies per section 504.5 VMC2018
Mechanical08/20/2021AdditionalPlease provide clarity of what occupancy classification was used for ventilation calculations. It appears Compression/Stretch/Quiet Dip, Sleep Therapy and Cryo Room are Patient Rooms which require a minimum of 25cfm of OA per person per section 403.2.1 and table 403.3.3 VMC2018.
Mechanical08/20/2021AdditionalCryo and Equipment Room will it store any source of hazardous material or tanks and if so which will require an exhaust system per section 502.9.3 VMC2018?
Mechanical08/20/2021AdditionalProvide proper protection for rated penetrations (demising wall see marks up please) per section 607.1.2 VMC2018.
Mechanical08/20/2021ApprovedProvide missing duct sizes for installation and balancing purposes per section 109.3 VMC2018. (dryer exhaust and more see mark ups please)
Mechanical08/20/2021ApprovedProvide dryer exhaust booster fan listing and that it complies per section 504.5 VMC2018
Mechanical08/20/2021ApprovedPlease provide clarity of what occupancy classification was used for ventilation calculations. It appears Compression/Stretch/Quiet Dip, Sleep Therapy and Cryo Room are Patient Rooms which require a minimum of 25cfm of OA per person per section 403.2.1 and table 403.3.3 VMC2018.
Mechanical08/20/2021ApprovedCryo and Equipment Room will it store any source of hazardous material or tanks and if so which will require an exhaust system per section 502.9.3 VMC2018?
Mechanical08/20/2021ApprovedProvide proper protection for rated penetrations (demising wall see marks up please) per section 607.1.2 VMC2018.
Mechanical08/20/2021RejectedPlease provide manufacturer information regarding Zimnotech Electric Cryo Chamber to seek listing and installation compliance per section 301.7 and 1101.2 VMC2018
Mechanical08/20/2021RejectedProvide missing duct sizes for installation and balancing purposes per section 109.3 VMC2018. (dryer exhaust and more see mark ups please)
Mechanical08/20/2021RejectedProvide dryer exhaust booster fan listing and that it complies per section 504.5 VMC2018
Mechanical08/20/2021RejectedPlease provide clarity of what occupancy classification was used for ventilation calculations. It appears Compression/Stretch/Quiet Dip, Sleep Therapy and Cryo Room are Patient Rooms which require a minimum of 25cfm of OA per person per section 403.2.1 and table 403.3.3 VMC2018.
Mechanical08/20/2021RejectedCryo and Equipment Room will it store any source of hazardous material or tanks and if so which will require an exhaust system per section 502.9.3 VMC2018?
Mechanical08/20/2021RejectedProvide proper protection for rated penetrations (demising wall see marks up please) per section 607.1.2 VMC2018.
Mechanical08/20/2021RejectedProvide compliance regarding exhaust termination for exhaust terminations and louvers per section 501.3.1 VMC2018 items #3
Mechanical08/20/2021RejectedProvide compliance regarding intake louver per section 401.4 VMC2018 item #2
Mechanical08/20/2021RejectedProvide missing duct sizes for installation and balancing purposes per section 109.3 VMC2018. (dryer exhaust and more see mark ups please)
Mechanical08/20/2021RejectedProvide dryer exhaust booster fan listing and that it complies per section 504.5 VMC2018
Mechanical08/20/2021RejectedPlease provide clarity of what occupancy classification was used for ventilation calculations. It appears Compression/Stretch/Quiet Dip, Sleep Therapy and Cryo Room are Patient Rooms which require a minimum of 25cfm of OA per person per section 403.2.1 and table 403.3.3 VMC2018.
Mechanical08/20/2021RejectedCryo and Equipment Room will it store any source of hazardous material or tanks and if so which will require an exhaust system per section 502.9.3 VMC2018?
Mechanical08/20/2021RejectedProvide proper protection for rated penetrations (demising wall see marks up please) per section 607.1.2 VMC2018.
Mechanical08/20/2021RejectedProvide missing duct sizes for installation and balancing purposes per section 109.3 VMC2018. (dryer exhaust and more see mark ups please)
Mechanical08/20/2021RejectedProvide dryer exhaust booster fan listing and that it complies per section 504.5 VMC2018
Mechanical08/20/2021RejectedPlease provide clarity of what occupancy classification was used for ventilation calculations. It appears Compression/Stretch/Quiet Dip, Sleep Therapy and Cryo Room are Patient Rooms which require a minimum of 25cfm of OA per person per section 403.2.1 and table 403.3.3 VMC2018.
Mechanical08/20/2021RejectedCryo and Equipment Room will it store any source of hazardous material or tanks and if so which will require an exhaust system per section 502.9.3 VMC2018?
Mechanical08/20/2021RejectedProvide proper protection for rated penetrations (demising wall see marks up please) per section 607.1.2 VMC2018.
Mechanical09/23/2021RejectedProvide compliance regarding exhaust termination for exhaust terminations and louvers per section 501.3.1 VMC2018 items #3 Response Received: Please provide compliance.
Mechanical09/23/2021RejectedProvide compliance regarding intake louver per section 401.4 VMC2018 item #2 Response Received: Please provide compliance.
Mechanical09/23/2021RejectedProvide compliance regarding exhaust termination for exhaust terminations and louvers per section 501.3.1 VMC2018 items #3 Response Received: Please provide compliance.
Mechanical09/23/2021RejectedProvide compliance regarding intake louver per section 401.4 VMC2018 item #2 Response Received: Please provide compliance.
Mechanical09/23/2021RejectedPlease provide manufacturer information regarding Zimnotech Electric Cryo Chamber to seek listing and installation compliance per section 301.7 and 1101.2 VMC2018 Response Received: Please provide ul listing per manufacturer.
Mechanical09/23/2021ApprovedProvide compliance regarding exhaust termination for exhaust terminations and louvers per section 501.3.1 VMC2018 items #3 Response Received: Please provide compliance.
Mechanical09/23/2021ApprovedProvide compliance regarding intake louver per section 401.4 VMC2018 item #2 Response Received: Please provide compliance.
Mechanical09/23/2021AdditionalProvide compliance regarding exhaust termination for exhaust terminations and louvers per section 501.3.1 VMC2018 items #3 Response Received: Please provide compliance.
Mechanical09/23/2021AdditionalProvide compliance regarding intake louver per section 401.4 VMC2018 item #2 Response Received: Please provide compliance.
Mechanical10/14/2021AdditionalPlease provide manufacturer information regarding Zimnotech Electric Cryo Chamber to seek listing and installation compliance per section 301.7 and 1101.2 VMC2018 Response Received: Please provide ul listing per manufacturer. Response Received: Please provide listing before installation of Zimnotech electric cryo chamber.
Mechanical10/14/2021ApprovedPlease provide manufacturer information regarding Zimnotech Electric Cryo Chamber to seek listing and installation compliance per section 301.7 and 1101.2 VMC2018 Response Received: Please provide ul listing per manufacturer. Response Received: Please provide listing before installation of Zimnotech electric cryo chamber.
Mechanical10/14/2021RejectedPlease provide manufacturer information regarding Zimnotech Electric Cryo Chamber to seek listing and installation compliance per section 301.7 and 1101.2 VMC2018 Response Received: Please provide ul listing per manufacturer. Response Received: Please provide listing before installation of Zimnotech electric cryo chamber.
Structural09/30/2021ApprovedOn sheet S0.1 please provide the live loads.
Structural09/30/2021AdditionalOn sheet S0.1 please provide the live loads.
Structural09/30/2021RejectedOn sheet S0.1 please provide the live loads.
Structural09/30/2021ApprovedOn sheet S0.1 please provide the live loads.
Zoning08/26/2021ApprovedThere is no requirement for transparency according to the Board Report approved on February 1998. All changes on the façade related to mechanical equipment are covered by ZADM210093.
Zoning08/26/2021ApprovedThere is no requirement for transparency according to the Board Report approved on February 1998. All changes on the façade related to mechanical equipment are covered by ZADM210093.
Zoning08/26/2021ApprovedThere is no requirement for transparency according to the Board Report approved on February 1998. All changes on the façade related to mechanical equipment are covered by ZADM210093.
Zoning08/26/2021AdditionalThere is no requirement for transparency according to the Board Report approved on February 1998. All changes on the façade related to mechanical equipment are covered by ZADM210093.
Zoning08/26/2021ApprovedThere is no requirement for transparency according to the Board Report approved on February 1998. All changes on the façade related to mechanical equipment are covered by ZADM210093.