Review | Review Date | Status | Comments |
Building | 02/14/2022 | Approved | Sheet A-300-Enlarged Restroom and Elevations: Per Accessibility Standard ICC A-117.1-2009 Sect. 608.2.1.2 - A clearance of 48” minimum in length measured perpendicular from the control wall, and 36” minimum in depth shall be provided adjacent to the open face oof the compartment.
Referenced Sheet: A-1.1, A-2.1
|
Building | 02/14/2022 | Approved | Sheet A-000-Cover Sheet: NOTE:
SUBMIT AUTOMATIC SUPPRESSION
SHOP DRAWINGS FOR APPROVAL
SUBMIT FIRE ALARM SHOP
DRAWINGS FOR APPROVAL |
Building | 02/15/2022 | Approved | Sheet Accessibility Compliance Form: Per communication with RDP via 02/14/2020 email and phone call 02/15/2020, Box one is selected. Otherwise please resubmit with the appropriate box selected. |
Building | 02/15/2022 | Approved | Sheet A-103-Dimensioned Floor Plan: See Code Modification CMOD21-00060 for modification to accessible route provision. for the Cryo chamber. |
Building | 08/19/2021 | Approved | Sheet A-601-Millwork Elevations: Approved with the Following General Comment for ALL Powered Furniture and Millwork: Millwork at the Reception Desk appears to be constructed with electrical outlets Built-in to them. We review these like Wall Partitions. As such all wood framing and blocking provided within the framing cavity shall be Fire-Retardant Treated (FRT) Wood per VCC, Section 603.1.1 #1.1; as required for Types I & II Construction. Please coordinate in field. No response required. |
Building | 08/19/2021 | Approved | Approved with the Following General Comment for ALL Powered Furniture and Millwork: Millwork at the Reception Desk appears to be constructed with electrical outlets Built-in to them. We review these like Wall Partitions. As such all wood framing and blocking provided within the framing cavity shall be Fire-Retardant Treated (FRT) Wood per VCC, Section 603.1.1 #1.1; as required for Types I & II Construction. Please coordinate in field. No response required. |
Building | 09/24/2021 | Approved | Sheet A-601-Millwork Elevations: Approved with the Following General Comment for ALL Powered Furniture and Millwork: Millwork at the Reception Desk appears to be constructed with electrical outlets Built-in to them. We review these like Wall Partitions. As such all wood framing and blocking provided within the framing cavity shall be Fire-Retardant Treated (FRT) Wood per VCC, Section 603.1.1 #1.1; as required for Types I & II Construction. Please coordinate in field. No response required.
**************************09/24/2021************************************
Comment response acknowledge. Drawings are being resubmitted for comments in other disciplines, please revise non-compliant plywood is indicated to show FRT wood as required by |
Building | 09/24/2021 | Additional | Sheet A-601-Millwork Elevations: Approved with the Following General Comment for ALL Powered Furniture and Millwork: Millwork at the Reception Desk appears to be constructed with electrical outlets Built-in to them. We review these like Wall Partitions. As such all wood framing and blocking provided within the framing cavity shall be Fire-Retardant Treated (FRT) Wood per VCC, Section 603.1.1 #1.1; as required for Types I & II Construction. Please coordinate in field. No response required.
**************************09/24/2021************************************
Comment response acknowledge. Drawings are being resubmitted for comments in other disciplines, please revise non-compliant plywood is indicated to show FRT wood as required by |
Building | 09/24/2021 | Rejected | Sheet A-601-Millwork Elevations: Approved with the Following General Comment for ALL Powered Furniture and Millwork: Millwork at the Reception Desk appears to be constructed with electrical outlets Built-in to them. We review these like Wall Partitions. As such all wood framing and blocking provided within the framing cavity shall be Fire-Retardant Treated (FRT) Wood per VCC, Section 603.1.1 #1.1; as required for Types I & II Construction. Please coordinate in field. No response required.
**************************09/24/2021************************************
Comment response acknowledge. Drawings are being resubmitted for comments in other disciplines, please revise non-compliant plywood is indicated to show FRT wood as required by |
Building | 09/24/2021 | Rejected | Approved with the Following General Comment for ALL Powered Furniture and Millwork: Millwork at the Reception Desk appears to be constructed with electrical outlets Built-in to them. We review these like Wall Partitions. As such all wood framing and blocking provided within the framing cavity shall be Fire-Retardant Treated (FRT) Wood per VCC, Section 603.1.1 #1.1; as required for Types I & II Construction. Please coordinate in field. No response required.
**************************09/24/2021************************************
Comment response acknowledge. Drawings are being resubmitted for comments in other disciplines, please revise non-compliant plywood is indicated to show FRT wood as required by VCC, Section 603.1.1 #1.1 when re |
Building | 09/24/2021 | Approved | Sheet A-601-Millwork Elevations: Approved with the Following General Comment for ALL Powered Furniture and Millwork: Millwork at the Reception Desk appears to be constructed with electrical outlets Built-in to them. We review these like Wall Partitions. As such all wood framing and blocking provided within the framing cavity shall be Fire-Retardant Treated (FRT) Wood per VCC, Section 603.1.1 #1.1; as required for Types I & II Construction. Please coordinate in field. No response required.
**************************09/24/2021************************************
Comment response acknowledge. Drawings are being resubmitted for comments in other disciplines, please revise non-compliant plywood is indicated to show FRT wood as required by |
Building | 10/18/2021 | Approved | Approved with the Following General Comment for ALL Powered Furniture and Millwork: Millwork at the Reception Desk appears to be constructed with electrical outlets Built-in to them. We review these like Wall Partitions. As such all wood framing and blocking provided within the framing cavity shall be Fire-Retardant Treated (FRT) Wood per VCC, Section 603.1.1 #1.1; as required for Types I & II Construction. Please coordinate in field. No response required.
**************************09/24/2021************************************
Comment response acknowledge. Drawings are being resubmitted for comments in other disciplines, please revise non-compliant plywood is indicated to show FRT wood as required by VCC, Section 603.1.1 #1.1 when re |
Building | 10/18/2021 | Additional | Approved with the Following General Comment for ALL Powered Furniture and Millwork: Millwork at the Reception Desk appears to be constructed with electrical outlets Built-in to them. We review these like Wall Partitions. As such all wood framing and blocking provided within the framing cavity shall be Fire-Retardant Treated (FRT) Wood per VCC, Section 603.1.1 #1.1; as required for Types I & II Construction. Please coordinate in field. No response required.
**************************09/24/2021************************************
Comment response acknowledge. Drawings are being resubmitted for comments in other disciplines, please revise non-compliant plywood is indicated to show FRT wood as required by VCC, Section 603.1.1 #1.1 when re |
Building | 10/18/2021 | Approved | Approved with the Following General Comment for ALL Powered Furniture and Millwork: Millwork at the Reception Desk appears to be constructed with electrical outlets Built-in to them. We review these like Wall Partitions. As such all wood framing and blocking provided within the framing cavity shall be Fire-Retardant Treated (FRT) Wood per VCC, Section 603.1.1 #1.1; as required for Types I & II Construction. Please coordinate in field. No response required.
**************************09/24/2021************************************
Comment response acknowledge. Drawings are being resubmitted for comments in other disciplines, please revise non-compliant plywood is indicated to show FRT wood as required by VCC, Section 603.1.1 #1.1 when re |
Building | 11/10/2021 | Approved | Plan review cycle ended and plans returned at submitter's request to complete upload.
Please upload a completed Accessibility Compliance Form and the Asbestos Inspections and Awareness Forms |
Building | 11/10/2021 | Additional | Plan review cycle ended and plans returned at submitter's request to complete upload.
Please upload a completed Accessibility Compliance Form and the Asbestos Inspections and Awareness Forms |
DES:Water/Sewer Engineering | 08/25/2021 | Approved | 15 NEW DFU'S |
Energy | 08/25/2021 | Additional | The architectural drawings indicate that new building thermal envelope (BTE) doors are part of the scope of the permit. It is unclear if these doors satisfy the U-factor and SHGC requirements of Table C402.4 of the 2015 Virginia Energy Conservation Code (VECC). In addition, it is unclear if the new BTE doors will satisfy the air infiltration requirements of Table C402.5.2 of the 2015 VECC. In the resubmission, revise the door schedule to indicate which doors are part of the BTE. State the U-factor, SHGC and air infiltration rates for the BTE doors on the drawings. |
Energy | 08/25/2021 | Additional | The permit submission has not included a complete, signed and stamped interior lighting COMcheck on a full size sheet in the drawing submission. This is required to demonstrate compliance with Section C405.4 of the 2015 Virginia Energy Conservation Code (VECC). The COMcheck calculation may be used with the 2015 IECC as the applicable code. |
Energy | 08/25/2021 | Additional | The plumbing drawings indicate that new heated water supply piping is part of the scope of the permit. It is unclear how the new piping will satisfy the requirements of section C404.5 (Efficient heated water supply piping) of the 2015 VECC. In the resubmission, revise the heated water supply piping design to satisfy the requirements of this section. |
Energy | 08/25/2021 | Rejected | The architectural drawings indicate that new building thermal envelope (BTE) doors are part of the scope of the permit. It is unclear if these doors satisfy the U-factor and SHGC requirements of Table C402.4 of the 2015 Virginia Energy Conservation Code (VECC). In addition, it is unclear if the new BTE doors will satisfy the air infiltration requirements of Table C402.5.2 of the 2015 VECC. In the resubmission, revise the door schedule to indicate which doors are part of the BTE. State the U-factor, SHGC and air infiltration rates for the BTE doors on the drawings. |
Energy | 08/25/2021 | Rejected | The electrical light fixture schedule does not state the “total input power” (Watts) of each light fixture type. This value must be stated on the lighting schedule to validate the lighting COMcheck calculations that demonstrate compliance with section C405.4 of the 2015 VECC. In the resubmission, revise the lighting schedule to state the total input power (Watts) of each fixture type. |
Energy | 08/25/2021 | Rejected | The permit submission has not included a complete, signed and stamped interior lighting COMcheck on a full size sheet in the drawing submission. This is required to demonstrate compliance with Section C405.4 of the 2015 Virginia Energy Conservation Code (VECC). The COMcheck calculation may be used with the 2015 IECC as the applicable code. |
Energy | 08/25/2021 | Rejected | The plumbing drawings indicate that new heated water supply piping is part of the scope of the permit. It is unclear how the new piping will satisfy the requirements of section C404.5 (Efficient heated water supply piping) of the 2015 VECC. In the resubmission, revise the heated water supply piping design to satisfy the requirements of this section. |
Energy | 08/25/2021 | Approved | The architectural drawings indicate that new building thermal envelope (BTE) doors are part of the scope of the permit. It is unclear if these doors satisfy the U-factor and SHGC requirements of Table C402.4 of the 2015 Virginia Energy Conservation Code (VECC). In addition, it is unclear if the new BTE doors will satisfy the air infiltration requirements of Table C402.5.2 of the 2015 VECC. In the resubmission, revise the door schedule to indicate which doors are part of the BTE. State the U-factor, SHGC and air infiltration rates for the BTE doors on the drawings. |
Energy | 08/25/2021 | Approved | The permit submission has not included a complete, signed and stamped interior lighting COMcheck on a full size sheet in the drawing submission. This is required to demonstrate compliance with Section C405.4 of the 2015 Virginia Energy Conservation Code (VECC). The COMcheck calculation may be used with the 2015 IECC as the applicable code. |
Energy | 08/25/2021 | Approved | The plumbing drawings indicate that new heated water supply piping is part of the scope of the permit. It is unclear how the new piping will satisfy the requirements of section C404.5 (Efficient heated water supply piping) of the 2015 VECC. In the resubmission, revise the heated water supply piping design to satisfy the requirements of this section. |
Energy | 08/25/2021 | Approved | The architectural drawings indicate that new building thermal envelope (BTE) doors are part of the scope of the permit. It is unclear if these doors satisfy the U-factor and SHGC requirements of Table C402.4 of the 2015 Virginia Energy Conservation Code (VECC). In addition, it is unclear if the new BTE doors will satisfy the air infiltration requirements of Table C402.5.2 of the 2015 VECC. In the resubmission, revise the door schedule to indicate which doors are part of the BTE. State the U-factor, SHGC and air infiltration rates for the BTE doors on the drawings. |
Energy | 08/25/2021 | Approved | The permit submission has not included a complete, signed and stamped interior lighting COMcheck on a full size sheet in the drawing submission. This is required to demonstrate compliance with Section C405.4 of the 2015 Virginia Energy Conservation Code (VECC). The COMcheck calculation may be used with the 2015 IECC as the applicable code. |
Energy | 08/25/2021 | Approved | The plumbing drawings indicate that new heated water supply piping is part of the scope of the permit. It is unclear how the new piping will satisfy the requirements of section C404.5 (Efficient heated water supply piping) of the 2015 VECC. In the resubmission, revise the heated water supply piping design to satisfy the requirements of this section. |
Energy | 08/25/2021 | Approved | The architectural drawings indicate that new building thermal envelope (BTE) doors are part of the scope of the permit. It is unclear if these doors satisfy the U-factor and SHGC requirements of Table C402.4 of the 2015 Virginia Energy Conservation Code (VECC). In addition, it is unclear if the new BTE doors will satisfy the air infiltration requirements of Table C402.5.2 of the 2015 VECC. In the resubmission, revise the door schedule to indicate which doors are part of the BTE. State the U-factor, SHGC and air infiltration rates for the BTE doors on the drawings. |
Energy | 08/25/2021 | Approved | The permit submission has not included a complete, signed and stamped interior lighting COMcheck on a full size sheet in the drawing submission. This is required to demonstrate compliance with Section C405.4 of the 2015 Virginia Energy Conservation Code (VECC). The COMcheck calculation may be used with the 2015 IECC as the applicable code. |
Energy | 08/25/2021 | Approved | The plumbing drawings indicate that new heated water supply piping is part of the scope of the permit. It is unclear how the new piping will satisfy the requirements of section C404.5 (Efficient heated water supply piping) of the 2015 VECC. In the resubmission, revise the heated water supply piping design to satisfy the requirements of this section. |
Energy | 10/01/2021 | Approved | The electrical light fixture schedule does not state the “total input power” (Watts) of each light fixture type. This value must be stated on the lighting schedule to validate the lighting COMcheck calculations that demonstrate compliance with section C405.4 of the 2015 VECC. In the resubmission, revise the lighting schedule to state the total input power (Watts) of each fixture type. |
Energy | 10/01/2021 | Approved | The electrical light fixture schedule does not state the “total input power” (Watts) of each light fixture type. This value must be stated on the lighting schedule to validate the lighting COMcheck calculations that demonstrate compliance with section C405.4 of the 2015 VECC. In the resubmission, revise the lighting schedule to state the total input power (Watts) of each fixture type. |
Energy | 10/01/2021 | Approved | The electrical light fixture schedule does not state the “total input power” (Watts) of each light fixture type. This value must be stated on the lighting schedule to validate the lighting COMcheck calculations that demonstrate compliance with section C405.4 of the 2015 VECC. In the resubmission, revise the lighting schedule to state the total input power (Watts) of each fixture type. |
Energy | 10/01/2021 | Additional | The electrical light fixture schedule does not state the “total input power” (Watts) of each light fixture type. This value must be stated on the lighting schedule to validate the lighting COMcheck calculations that demonstrate compliance with section C405.4 of the 2015 VECC. In the resubmission, revise the lighting schedule to state the total input power (Watts) of each fixture type. |
EPlan Review | 02/24/2022 | Approved | Approved |
Mechanical | 08/20/2021 | Additional | Provide missing duct sizes for installation and balancing purposes per section 109.3 VMC2018. (dryer exhaust and more see mark ups please) |
Mechanical | 08/20/2021 | Additional | Provide dryer exhaust booster fan listing and that it complies per section 504.5 VMC2018 |
Mechanical | 08/20/2021 | Additional | Please provide clarity of what occupancy classification was used for ventilation calculations. It appears Compression/Stretch/Quiet Dip, Sleep Therapy and Cryo Room are Patient Rooms which require a minimum of 25cfm of OA per person per section 403.2.1 and table 403.3.3 VMC2018. |
Mechanical | 08/20/2021 | Additional | Cryo and Equipment Room will it store any source of hazardous material or tanks and if so which will require an exhaust system per section 502.9.3 VMC2018? |
Mechanical | 08/20/2021 | Additional | Provide proper protection for rated penetrations (demising wall see marks up please) per section 607.1.2 VMC2018. |
Mechanical | 08/20/2021 | Approved | Provide missing duct sizes for installation and balancing purposes per section 109.3 VMC2018. (dryer exhaust and more see mark ups please) |
Mechanical | 08/20/2021 | Approved | Provide dryer exhaust booster fan listing and that it complies per section 504.5 VMC2018 |
Mechanical | 08/20/2021 | Approved | Please provide clarity of what occupancy classification was used for ventilation calculations. It appears Compression/Stretch/Quiet Dip, Sleep Therapy and Cryo Room are Patient Rooms which require a minimum of 25cfm of OA per person per section 403.2.1 and table 403.3.3 VMC2018. |
Mechanical | 08/20/2021 | Approved | Cryo and Equipment Room will it store any source of hazardous material or tanks and if so which will require an exhaust system per section 502.9.3 VMC2018? |
Mechanical | 08/20/2021 | Approved | Provide proper protection for rated penetrations (demising wall see marks up please) per section 607.1.2 VMC2018. |
Mechanical | 08/20/2021 | Rejected | Please provide manufacturer information regarding Zimnotech Electric Cryo Chamber to seek listing and installation compliance per section 301.7 and 1101.2 VMC2018 |
Mechanical | 08/20/2021 | Rejected | Provide missing duct sizes for installation and balancing purposes per section 109.3 VMC2018. (dryer exhaust and more see mark ups please) |
Mechanical | 08/20/2021 | Rejected | Provide dryer exhaust booster fan listing and that it complies per section 504.5 VMC2018 |
Mechanical | 08/20/2021 | Rejected | Please provide clarity of what occupancy classification was used for ventilation calculations. It appears Compression/Stretch/Quiet Dip, Sleep Therapy and Cryo Room are Patient Rooms which require a minimum of 25cfm of OA per person per section 403.2.1 and table 403.3.3 VMC2018. |
Mechanical | 08/20/2021 | Rejected | Cryo and Equipment Room will it store any source of hazardous material or tanks and if so which will require an exhaust system per section 502.9.3 VMC2018? |
Mechanical | 08/20/2021 | Rejected | Provide proper protection for rated penetrations (demising wall see marks up please) per section 607.1.2 VMC2018. |
Mechanical | 08/20/2021 | Rejected | Provide compliance regarding exhaust termination for exhaust terminations and louvers per section 501.3.1 VMC2018 items #3 |
Mechanical | 08/20/2021 | Rejected | Provide compliance regarding intake louver per section 401.4 VMC2018 item #2 |
Mechanical | 08/20/2021 | Rejected | Provide missing duct sizes for installation and balancing purposes per section 109.3 VMC2018. (dryer exhaust and more see mark ups please) |
Mechanical | 08/20/2021 | Rejected | Provide dryer exhaust booster fan listing and that it complies per section 504.5 VMC2018 |
Mechanical | 08/20/2021 | Rejected | Please provide clarity of what occupancy classification was used for ventilation calculations. It appears Compression/Stretch/Quiet Dip, Sleep Therapy and Cryo Room are Patient Rooms which require a minimum of 25cfm of OA per person per section 403.2.1 and table 403.3.3 VMC2018. |
Mechanical | 08/20/2021 | Rejected | Cryo and Equipment Room will it store any source of hazardous material or tanks and if so which will require an exhaust system per section 502.9.3 VMC2018? |
Mechanical | 08/20/2021 | Rejected | Provide proper protection for rated penetrations (demising wall see marks up please) per section 607.1.2 VMC2018. |
Mechanical | 08/20/2021 | Rejected | Provide missing duct sizes for installation and balancing purposes per section 109.3 VMC2018. (dryer exhaust and more see mark ups please) |
Mechanical | 08/20/2021 | Rejected | Provide dryer exhaust booster fan listing and that it complies per section 504.5 VMC2018 |
Mechanical | 08/20/2021 | Rejected | Please provide clarity of what occupancy classification was used for ventilation calculations. It appears Compression/Stretch/Quiet Dip, Sleep Therapy and Cryo Room are Patient Rooms which require a minimum of 25cfm of OA per person per section 403.2.1 and table 403.3.3 VMC2018. |
Mechanical | 08/20/2021 | Rejected | Cryo and Equipment Room will it store any source of hazardous material or tanks and if so which will require an exhaust system per section 502.9.3 VMC2018? |
Mechanical | 08/20/2021 | Rejected | Provide proper protection for rated penetrations (demising wall see marks up please) per section 607.1.2 VMC2018. |
Mechanical | 09/23/2021 | Rejected | Provide compliance regarding exhaust termination for exhaust terminations and louvers per section 501.3.1 VMC2018 items #3
Response Received: Please provide compliance. |
Mechanical | 09/23/2021 | Rejected | Provide compliance regarding intake louver per section 401.4 VMC2018 item #2
Response Received: Please provide compliance. |
Mechanical | 09/23/2021 | Rejected | Provide compliance regarding exhaust termination for exhaust terminations and louvers per section 501.3.1 VMC2018 items #3
Response Received: Please provide compliance. |
Mechanical | 09/23/2021 | Rejected | Provide compliance regarding intake louver per section 401.4 VMC2018 item #2
Response Received: Please provide compliance. |
Mechanical | 09/23/2021 | Rejected | Please provide manufacturer information regarding Zimnotech Electric Cryo Chamber to seek listing and installation compliance per section 301.7 and 1101.2 VMC2018
Response Received: Please provide ul listing per manufacturer. |
Mechanical | 09/23/2021 | Approved | Provide compliance regarding exhaust termination for exhaust terminations and louvers per section 501.3.1 VMC2018 items #3
Response Received: Please provide compliance. |
Mechanical | 09/23/2021 | Approved | Provide compliance regarding intake louver per section 401.4 VMC2018 item #2
Response Received: Please provide compliance. |
Mechanical | 09/23/2021 | Additional | Provide compliance regarding exhaust termination for exhaust terminations and louvers per section 501.3.1 VMC2018 items #3
Response Received: Please provide compliance. |
Mechanical | 09/23/2021 | Additional | Provide compliance regarding intake louver per section 401.4 VMC2018 item #2
Response Received: Please provide compliance. |
Mechanical | 10/14/2021 | Additional | Please provide manufacturer information regarding Zimnotech Electric Cryo Chamber to seek listing and installation compliance per section 301.7 and 1101.2 VMC2018
Response Received: Please provide ul listing per manufacturer.
Response Received: Please provide listing before installation of Zimnotech electric cryo chamber. |
Mechanical | 10/14/2021 | Approved | Please provide manufacturer information regarding Zimnotech Electric Cryo Chamber to seek listing and installation compliance per section 301.7 and 1101.2 VMC2018
Response Received: Please provide ul listing per manufacturer.
Response Received: Please provide listing before installation of Zimnotech electric cryo chamber. |
Mechanical | 10/14/2021 | Rejected | Please provide manufacturer information regarding Zimnotech Electric Cryo Chamber to seek listing and installation compliance per section 301.7 and 1101.2 VMC2018
Response Received: Please provide ul listing per manufacturer.
Response Received: Please provide listing before installation of Zimnotech electric cryo chamber. |
Structural | 09/30/2021 | Approved | On sheet S0.1 please provide the live loads. |
Structural | 09/30/2021 | Additional | On sheet S0.1 please provide the live loads. |
Structural | 09/30/2021 | Rejected | On sheet S0.1 please provide the live loads. |
Structural | 09/30/2021 | Approved | On sheet S0.1 please provide the live loads. |
Zoning | 08/26/2021 | Approved | There is no requirement for transparency according to the Board Report approved on February 1998. All changes on the façade related to mechanical equipment are covered by ZADM210093. |
Zoning | 08/26/2021 | Approved | There is no requirement for transparency according to the Board Report approved on February 1998. All changes on the façade related to mechanical equipment are covered by ZADM210093. |
Zoning | 08/26/2021 | Approved | There is no requirement for transparency according to the Board Report approved on February 1998. All changes on the façade related to mechanical equipment are covered by ZADM210093. |
Zoning | 08/26/2021 | Additional | There is no requirement for transparency according to the Board Report approved on February 1998. All changes on the façade related to mechanical equipment are covered by ZADM210093. |
Zoning | 08/26/2021 | Approved | There is no requirement for transparency according to the Board Report approved on February 1998. All changes on the façade related to mechanical equipment are covered by ZADM210093. |