Review | Review Date | Status | Comments |
Building | 02/25/2022 | Approved | CTBO-38940 20 October 2021
Given the nature and extent of this project, additional concerns may come to light as the foregoing comments are addressed and resolved. |
Building | 02/25/2022 | Approved | CTBO-38940 25 February 2022
It appears the current (Review Cycle 6) submittal is for Electrical revisions only.
For a project of this size, it would certainly help the review process to include either a statement describing the permit alteration or a response letter addressing the prior review comments.
|
Building | 10/01/2021 | Approved | Plans returned to submitter. Rename the files to give each sheet a descriptive file name. It is best to name the files exactly as named in your own Index of Drawings. For example, "A1.03c DEMOLITION FLOOR PLAN - THIRD FLOOR". |
Building | 10/01/2021 | Rejected | Plans returned to submitter. Rename the files to give each sheet a descriptive file name. It is best to name the files exactly as named in your own Index of Drawings. For example, "A1.03c DEMOLITION FLOOR PLAN - THIRD FLOOR". |
Building | 10/01/2021 | Approved | Plans returned to submitter. Rename the files to give each sheet a descriptive file name. It is best to name the files exactly as named in your own Index of Drawings. For example, "A1.03c DEMOLITION FLOOR PLAN - THIRD FLOOR". |
Building | 10/01/2021 | Approved | Plans returned to submitter. Rename the files to give each sheet a descriptive file name. It is best to name the files exactly as named in your own Index of Drawings. For example, "A1.03c DEMOLITION FLOOR PLAN - THIRD FLOOR". |
Building | 10/01/2021 | Approved | Plans returned to submitter. Rename the files to give each sheet a descriptive file name. It is best to name the files exactly as named in your own Index of Drawings. For example, "A1.03c DEMOLITION FLOOR PLAN - THIRD FLOOR". |
Building | 10/20/2021 | Approved | Sheet A1.02a_EXISTING REQUIREMENTS AND PATH OF TRAVEL @ FIRST FLOOR: A1.02a Existing Requirements ... @ First Floor 20 October 2021
Please identify all rooms which have an assembly use, including conference rooms, staff lounge, etc.
The occupant load of such rooms shall be based upon a floor area ratio of 15 ft²/person (Assembly, unconcentrated) or upon the chair count, whichever is greater.
2018 VCC §1004.5; §1004.5.1; Table 1004.5 |
Building | 10/20/2021 | Approved | A0.00 Cover Sheet 20 October 2021
Project Scope/Notes: For new furniture with data and power, identify whether the furniture is electrified systems furniture or if power and data are provided via wall outlet at each workstation. |
Building | 10/20/2021 | Approved | Sheet A2.01b_CONSTRUCTION & FINISH PLAN @ SECOND FLOOR: A2.01b Construction & Finish Plan @ Second Floor 20 October 2021
Please identify the proposed use of the spaces where the lockers are being removed. |
Building | 10/20/2021 | Approved | A9.02 Door, Hardware & Window Schedules 19 October 2021
WHERE ARE THE DOORS WHICH ARE TO BE WIDENED PER DETAIL 11/S-200? |
Building | 10/20/2021 | Approved | A3.01a Reflected Ceiling Plan @ First Floor 20 October 2021
Please identify the item marked by the symbol [F]. |
Building | 10/20/2021 | Approved | Sheet A7.01_SOLAR ROOF TILE & GRAPHIC WALL DETAILS: A7.01 Solar Roof Tile 20 October 2021
Please clarify. This graphic does not appear to have anything to do with electric automobiles? |
Building | 10/20/2021 | Approved | Sheet S-200_DETAILS: S-200 Structural - Detail Sheet 20 October 2021
Verify whether this wall is required to be fire rated. If so, the structural support must also be fire rated.
VCC §703; §707 |
Building | 10/20/2021 | Approved | A0.00 Cover Sheet 20 October 2021
Code/Project Information: Please provide the floor area of each floor level in addition to the building footprint area.
- Identify the Use Group B Business areas, the Use Group F Factory/Industrial areas and the Use Group S Storage areas.
- The building occupancy appears to be Nonseparated Mixed Use in accordance with VCC §508. Please verify. |
Building | 10/20/2021 | Approved | CTBO-38940 20 October 2021
Given the nature and extent of this project, additional concerns may come to light as the foregoing comments are addressed and resolved. |
Building | 10/20/2021 | Approved | Sheet A1.02a_EXISTING REQUIREMENTS AND PATH OF TRAVEL @ FIRST FLOOR: A1.02a Existing Requirements ... @ First Floor 20 October 2021
Please identify all rooms which have an assembly use, including conference rooms, staff lounge, etc.
The occupant load of such rooms shall be based upon a floor area ratio of 15 ft²/person (Assembly, unconcentrated) or upon the chair count, whichever is greater.
2018 VCC §1004.5; §1004.5.1; Table 1004.5 |
Building | 10/20/2021 | Approved | A0.00 Cover Sheet 20 October 2021
Project Scope/Notes: For new furniture with data and power, identify whether the furniture is electrified systems furniture or if power and data are provided via wall outlet at each workstation. |
Building | 10/20/2021 | Approved | Sheet A2.01b_CONSTRUCTION & FINISH PLAN @ SECOND FLOOR: A2.01b Construction & Finish Plan @ Second Floor 20 October 2021
Please identify the proposed use of the spaces where the lockers are being removed. |
Building | 10/20/2021 | Approved | A9.02 Door, Hardware & Window Schedules 19 October 2021
WHERE ARE THE DOORS WHICH ARE TO BE WIDENED PER DETAIL 11/S-200? |
Building | 10/20/2021 | Approved | A3.01a Reflected Ceiling Plan @ First Floor 20 October 2021
Please identify the item marked by the symbol [F]. |
Building | 10/20/2021 | Approved | Sheet A7.01_SOLAR ROOF TILE & GRAPHIC WALL DETAILS: A7.01 Solar Roof Tile 20 October 2021
Please clarify. This graphic does not appear to have anything to do with electric automobiles? |
Building | 10/20/2021 | Approved | Sheet S-200_DETAILS: S-200 Structural - Detail Sheet 20 October 2021
Verify whether this wall is required to be fire rated. If so, the structural support must also be fire rated.
VCC §703; §707 |
Building | 10/20/2021 | Approved | A0.00 Cover Sheet 20 October 2021
Code/Project Information: Please provide the floor area of each floor level in addition to the building footprint area.
- Identify the Use Group B Business areas, the Use Group F Factory/Industrial areas and the Use Group S Storage areas.
- The building occupancy appears to be Nonseparated Mixed Use in accordance with VCC §508. Please verify. |
Building | 10/20/2021 | Approved | CTBO-38940 20 October 2021
Given the nature and extent of this project, additional concerns may come to light as the foregoing comments are addressed and resolved. |
Building | 10/20/2021 | Approved | Sheet A1.02a_EXISTING REQUIREMENTS AND PATH OF TRAVEL @ FIRST FLOOR: A1.02a Existing Requirements ... @ First Floor 20 October 2021
Please identify all rooms which have an assembly use, including conference rooms, staff lounge, etc.
The occupant load of such rooms shall be based upon a floor area ratio of 15 ft²/person (Assembly, unconcentrated) or upon the chair count, whichever is greater.
2018 VCC §1004.5; §1004.5.1; Table 1004.5 |
Building | 10/20/2021 | Approved | A0.00 Cover Sheet 20 October 2021
Project Scope/Notes: For new furniture with data and power, identify whether the furniture is electrified systems furniture or if power and data are provided via wall outlet at each workstation. |
Building | 10/20/2021 | Approved | Sheet A2.01b_CONSTRUCTION & FINISH PLAN @ SECOND FLOOR: A2.01b Construction & Finish Plan @ Second Floor 20 October 2021
Please identify the proposed use of the spaces where the lockers are being removed. |
Building | 10/20/2021 | Approved | A9.02 Door, Hardware & Window Schedules 19 October 2021
WHERE ARE THE DOORS WHICH ARE TO BE WIDENED PER DETAIL 11/S-200? |
Building | 10/20/2021 | Approved | A3.01a Reflected Ceiling Plan @ First Floor 20 October 2021
Please identify the item marked by the symbol [F]. |
Building | 10/20/2021 | Approved | Sheet A7.01_SOLAR ROOF TILE & GRAPHIC WALL DETAILS: A7.01 Solar Roof Tile 20 October 2021
Please clarify. This graphic does not appear to have anything to do with electric automobiles? |
Building | 10/20/2021 | Approved | Sheet S-200_DETAILS: S-200 Structural - Detail Sheet 20 October 2021
Verify whether this wall is required to be fire rated. If so, the structural support must also be fire rated.
VCC §703; §707 |
Building | 10/20/2021 | Approved | A0.00 Cover Sheet 20 October 2021
Code/Project Information: Please provide the floor area of each floor level in addition to the building footprint area.
- Identify the Use Group B Business areas, the Use Group F Factory/Industrial areas and the Use Group S Storage areas.
- The building occupancy appears to be Nonseparated Mixed Use in accordance with VCC §508. Please verify. |
Building | 10/20/2021 | Approved | CTBO-38940 20 October 2021
Given the nature and extent of this project, additional concerns may come to light as the foregoing comments are addressed and resolved. |
Building | 10/20/2021 | Rejected | Sheet A1.02a_EXISTING REQUIREMENTS AND PATH OF TRAVEL @ FIRST FLOOR: A1.02a Existing Requirements ... @ First Floor 20 October 2021
Please identify all rooms which have an assembly use, including conference rooms, staff lounge, etc.
The occupant load of such rooms shall be based upon a floor area ratio of 15 ft²/person (Assembly, unconcentrated) or upon the chair count, whichever is greater.
2018 VCC §1004.5; §1004.5.1; Table 1004.5
|
Building | 10/20/2021 | Rejected | A0.00 Cover Sheet 20 October 2021
Project Scope/Notes: For new furniture with data and power, identify whether the furniture is electrified systems furniture or if power and data are provided via wall outlet at each workstation. |
Building | 10/20/2021 | Rejected | Sheet A2.01b_CONSTRUCTION & FINISH PLAN @ SECOND FLOOR: A2.01b Construction & Finish Plan @ Second Floor 20 October 2021
Please identify the proposed use of the spaces where the lockers are being removed. |
Building | 10/20/2021 | Rejected | A9.02 Door, Hardware & Window Schedules 19 October 2021
WHERE ARE THE DOORS WHICH ARE TO BE WIDENED PER DETAIL 11/S-200? |
Building | 10/20/2021 | Rejected | A3.01a Reflected Ceiling Plan @ First Floor 20 October 2021
Please identify the item marked by the symbol [F]. |
Building | 10/20/2021 | Rejected | Sheet A7.01_SOLAR ROOF TILE & GRAPHIC WALL DETAILS: A7.01 Solar Roof Tile 20 October 2021
Please clarify. This graphic does not appear to have anything to do with electric automobiles? |
Building | 10/20/2021 | Rejected | S-200 Structural - Detail Sheet 20 October 2021
Verify whether this wall is required to be fire rated. If so, the structural support must also be fire rated.
VCC §703; §707 |
Building | 10/20/2021 | Rejected | A0.00 Cover Sheet 20 October 2021
Code/Project Information: Please provide the floor area of each floor level in addition to the building footprint area.
- Identify the Use Group B Business areas, the Use Group F Factory/Industrial areas and the Use Group S Storage areas.
- The building occupancy appears to be Nonseparated Mixed Use in accordance with VCC §508. Please verify. |
Building | 10/20/2021 | Rejected | CTBO-38940 20 October 2021
Given the nature and extent of this project, additional concerns may come to light as the foregoing comments are addressed and resolved. |
Building | 10/20/2021 | Approved | Sheet A1.02a_EXISTING REQUIREMENTS AND PATH OF TRAVEL @ FIRST FLOOR: A1.02a Existing Requirements ... @ First Floor 20 October 2021
Please identify all rooms which have an assembly use, including conference rooms, staff lounge, etc.
The occupant load of such rooms shall be based upon a floor area ratio of 15 ft²/person (Assembly, unconcentrated) or upon the chair count, whichever is greater.
2018 VCC §1004.5; §1004.5.1; Table 1004.5 |
Building | 10/20/2021 | Approved | A0.00 Cover Sheet 20 October 2021
Project Scope/Notes: For new furniture with data and power, identify whether the furniture is electrified systems furniture or if power and data are provided via wall outlet at each workstation. |
Building | 10/20/2021 | Approved | Sheet A2.01b_CONSTRUCTION & FINISH PLAN @ SECOND FLOOR: A2.01b Construction & Finish Plan @ Second Floor 20 October 2021
Please identify the proposed use of the spaces where the lockers are being removed. |
Building | 10/20/2021 | Approved | A9.02 Door, Hardware & Window Schedules 19 October 2021
WHERE ARE THE DOORS WHICH ARE TO BE WIDENED PER DETAIL 11/S-200? |
Building | 10/20/2021 | Approved | A3.01a Reflected Ceiling Plan @ First Floor 20 October 2021
Please identify the item marked by the symbol [F]. |
Building | 10/20/2021 | Approved | Sheet A7.01_SOLAR ROOF TILE & GRAPHIC WALL DETAILS: A7.01 Solar Roof Tile 20 October 2021
Please clarify. This graphic does not appear to have anything to do with electric automobiles? |
Building | 10/20/2021 | Approved | Sheet S-200_DETAILS: S-200 Structural - Detail Sheet 20 October 2021
Verify whether this wall is required to be fire rated. If so, the structural support must also be fire rated.
VCC §703; §707 |
Building | 10/20/2021 | Approved | A0.00 Cover Sheet 20 October 2021
Code/Project Information: Please provide the floor area of each floor level in addition to the building footprint area.
- Identify the Use Group B Business areas, the Use Group F Factory/Industrial areas and the Use Group S Storage areas.
- The building occupancy appears to be Nonseparated Mixed Use in accordance with VCC §508. Please verify. |
DES:Water/Sewer Engineering | 03/02/2022 | Approved | ACTIVE REVISION.NO PLUMBING. ELECTRICAL CHANGES ONLY. APPROVED |
DES:Water/Sewer Engineering | 12/30/2021 | Approved | COMMERCIAL INT ALT 35 NEW DFU'S APPROVED |
Electrical | 10/18/2021 | Approved | Existing panel board 'C1', located on the secondary side of a transformer, is shown to be rated 'MLO'. Refer to the 'C1' directory shown on sheet E5.1 and electrical riser diagram shown on sheet E5.0. Please clarify. NEC Article 408.36 (B) and 90.4. |
Electrical | 10/18/2021 | Approved | Existing panel board 'L3', located on the secondary side of a transformer, is shown to be rated 'MLO'. Refer to the Electrical Riser Diagram shown on sheet E5.0, and the 'L3' directory shown on sheet E5.2. Please clarify. NEC Article 408.36 (B) and 90.4. |
Electrical | 10/18/2021 | Approved | The 'V3 Charging Wire Diagram shown on sheet E4.1, has an 'AC Circuit Schedule' that identifies the 'AC-250' feeders as 'AL'. Please clarify on the drawings whether this feeder is aluminum or copper. If aluminum for example, it cannot be protected by a 250 ampere circuit breaker as shown. An aluminum 250Kcmil conductor is rated for 205 amperes. NEC Table 310.15 (B) (16), 75 degree column. NEC Article 240.6 (A). Section 109.3 of the Virginia Construction Code. |
Electrical | 10/18/2021 | Approved | Indicate on the electrical floor plan the location of the 'new' 112.5kva transformer and 'new' panel board 'TS1'. Section 109.3 of the Virginia Construction Code. Clarify. |
Electrical | 10/18/2021 | Approved | Indicate on the drawings the wire size for the primary and secondary side of the 'new' 112.5 kva transformer. Refer to the Electrical Riser Diagram shown on sheet E5.0. NEC Article 215.5, and Section 109.3 of the Virginia Construction Code. |
Electrical | 10/18/2021 | Approved | Indicate on the drawings the size of the grounding electrode conductor and the type(s) of grounding electrode(s) to be used to properly ground the 'new' 112.5kva transformer. NEC Article 250.30 (A) (4) and (5). Refer to the Electrical Riser Diagram shown on sheet E5.0. |
Electrical | 10/18/2021 | Approved | Based on the lack of information provided, the above comments may not constitute a complete list of requested information. Additional design information is required for the county to review for code compliance. Section 109.3 of the Virginia Construction Code. |
Electrical | 10/18/2021 | Rejected | Existing panel board 'C1', located on the secondary side of a transformer, is shown to be rated 'MLO'. Refer to the 'C1' directory shown on sheet E5.1 and electrical riser diagram shown on sheet E5.0. Please clarify. NEC Article 408.36 (B) and 90.4. |
Electrical | 10/18/2021 | Rejected | Existing panel board 'L3', located on the secondary side of a transformer, is shown to be rated 'MLO'. Refer to the Electrical Riser Diagram shown on sheet E5.0, and the 'L3' directory shown on sheet E5.2. Please clarify. NEC Article 408.36 (B) and 90.4. |
Electrical | 10/18/2021 | Rejected | The 'V3 Charging Wire Diagram shown on sheet E4.1, has an 'AC Circuit Schedule' that identifies the 'AC-250' feeders as 'AL'. Please clarify on the drawings whether this feeder is aluminum or copper. If aluminum for example, it cannot be protected by a 250 ampere circuit breaker as shown. An aluminum 250Kcmil conductor is rated for 205 amperes. NEC Table 310.15 (B) (16), 75 degree column. NEC Article 240.6 (A). Section 109.3 of the Virginia Construction Code. |
Electrical | 10/18/2021 | Rejected | Indicate on the electrical floor plan the location of the 'new' 112.5kva transformer and 'new' panel board 'TS1'. Section 109.3 of the Virginia Construction Code. Clarify. |
Electrical | 10/18/2021 | Rejected | Indicate on the drawings the wire size for the primary and secondary side of the 'new' 112.5 kva transformer. Refer to the Electrical Riser Diagram shown on sheet E5.0. NEC Article 215.5, and Section 109.3 of the Virginia Construction Code. |
Electrical | 10/18/2021 | Rejected | Indicate on the drawings the size of the grounding electrode conductor and the type(s) of grounding electrode(s) to be used to properly ground the 'new' 112.5kva transformer. NEC Article 250.30 (A) (4) and (5). Refer to the Electrical Riser Diagram shown on sheet E5.0. |
Electrical | 10/18/2021 | Rejected | Based on the lack of information provided, the above comments may not constitute a complete list of requested information. Additional design information is required for the county to review for code compliance. Section 109.3 of the Virginia Construction Code. |
Electrical | 10/18/2021 | Rejected | Existing panel board 'C1', located on the secondary side of a transformer, is shown to be rated 'MLO'. Refer to the 'C1' directory shown on sheet E5.1 and electrical riser diagram shown on sheet E5.0. Please clarify. NEC Article 408.36 (B) and 90.4. |
Electrical | 10/18/2021 | Rejected | Existing panel board 'L3', located on the secondary side of a transformer, is shown to be rated 'MLO'. Refer to the Electrical Riser Diagram shown on sheet E5.0, and the 'L3' directory shown on sheet E5.2. Please clarify. NEC Article 408.36 (B) and 90.4. |
Electrical | 10/18/2021 | Rejected | The 'V3 Charging Wire Diagram shown on sheet E4.1, has an 'AC Circuit Schedule' that identifies the 'AC-250' feeders as 'AL'. Please clarify on the drawings whether this feeder is aluminum or copper. If aluminum for example, it cannot be protected by a 250 ampere circuit breaker as shown. An aluminum 250Kcmil conductor is rated for 205 amperes. NEC Table 310.15 (B) (16), 75 degree column. NEC Article 240.6 (A). Section 109.3 of the Virginia Construction Code. |
Electrical | 10/18/2021 | Rejected | Indicate on the electrical floor plan the location of the 'new' 112.5kva transformer and 'new' panel board 'TS1'. Section 109.3 of the Virginia Construction Code. Clarify. |
Electrical | 10/18/2021 | Rejected | Indicate on the drawings the wire size for the primary and secondary side of the 'new' 112.5 kva transformer. Refer to the Electrical Riser Diagram shown on sheet E5.0. NEC Article 215.5, and Section 109.3 of the Virginia Construction Code. |
Electrical | 10/18/2021 | Rejected | Indicate on the drawings the size of the grounding electrode conductor and the type(s) of grounding electrode(s) to be used to properly ground the 'new' 112.5kva transformer. NEC Article 250.30 (A) (4) and (5). Refer to the Electrical Riser Diagram shown on sheet E5.0. |
Electrical | 10/18/2021 | Rejected | Based on the lack of information provided, the above comments may not constitute a complete list of requested information. Additional design information is required for the county to review for code compliance. Section 109.3 of the Virginia Construction Code. |
Electrical | 10/18/2021 | Rejected | Existing panel board 'C1', located on the secondary side of a transformer, is shown to be rated 'MLO'. Refer to the 'C1' directory shown on sheet E5.1 and electrical riser diagram shown on sheet E5.0. Please clarify. NEC Article 408.36 (B) and 90.4. |
Electrical | 10/18/2021 | Rejected | Existing panel board 'L3', located on the secondary side of a transformer, is shown to be rated 'MLO'. Refer to the Electrical Riser Diagram shown on sheet E5.0, and the 'L3' directory shown on sheet E5.2. Please clarify. NEC Article 408.36 (B) and 90.4. |
Electrical | 10/18/2021 | Rejected | The 'V3 Charging Wire Diagram shown on sheet E4.1, has an 'AC Circuit Schedule' that identifies the 'AC-250' feeders as 'AL'. Please clarify on the drawings whether this feeder is aluminum or copper. If aluminum for example, it cannot be protected by a 250 ampere circuit breaker as shown. An aluminum 250Kcmil conductor is rated for 205 amperes. NEC Table 310.15 (B) (16), 75 degree column. NEC Article 240.6 (A). Section 109.3 of the Virginia Construction Code. |
Electrical | 10/18/2021 | Rejected | Indicate on the electrical floor plan the location of the 'new' 112.5kva transformer and 'new' panel board 'TS1'. Section 109.3 of the Virginia Construction Code. Clarify. |
Electrical | 10/18/2021 | Rejected | Indicate on the drawings the wire size for the primary and secondary side of the 'new' 112.5 kva transformer. Refer to the Electrical Riser Diagram shown on sheet E5.0. NEC Article 215.5, and Section 109.3 of the Virginia Construction Code. |
Electrical | 10/18/2021 | Rejected | Indicate on the drawings the size of the grounding electrode conductor and the type(s) of grounding electrode(s) to be used to properly ground the 'new' 112.5kva transformer. NEC Article 250.30 (A) (4) and (5). Refer to the Electrical Riser Diagram shown on sheet E5.0. |
Electrical | 10/18/2021 | Rejected | Based on the lack of information provided, the above comments may not constitute a complete list of requested information. Additional design information is required for the county to review for code compliance. Section 109.3 of the Virginia Construction Code. |
Electrical | 10/18/2021 | Approved | Existing panel board 'C1', located on the secondary side of a transformer, is shown to be rated 'MLO'. Refer to the 'C1' directory shown on sheet E5.1 and electrical riser diagram shown on sheet E5.0. Please clarify. NEC Article 408.36 (B) and 90.4. |
Electrical | 10/18/2021 | Approved | Existing panel board 'L3', located on the secondary side of a transformer, is shown to be rated 'MLO'. Refer to the Electrical Riser Diagram shown on sheet E5.0, and the 'L3' directory shown on sheet E5.2. Please clarify. NEC Article 408.36 (B) and 90.4. |
Electrical | 10/18/2021 | Approved | The 'V3 Charging Wire Diagram shown on sheet E4.1, has an 'AC Circuit Schedule' that identifies the 'AC-250' feeders as 'AL'. Please clarify on the drawings whether this feeder is aluminum or copper. If aluminum for example, it cannot be protected by a 250 ampere circuit breaker as shown. An aluminum 250Kcmil conductor is rated for 205 amperes. NEC Table 310.15 (B) (16), 75 degree column. NEC Article 240.6 (A). Section 109.3 of the Virginia Construction Code. |
Electrical | 10/18/2021 | Approved | Indicate on the electrical floor plan the location of the 'new' 112.5kva transformer and 'new' panel board 'TS1'. Section 109.3 of the Virginia Construction Code. Clarify. |
Electrical | 10/18/2021 | Approved | Indicate on the drawings the wire size for the primary and secondary side of the 'new' 112.5 kva transformer. Refer to the Electrical Riser Diagram shown on sheet E5.0. NEC Article 215.5, and Section 109.3 of the Virginia Construction Code. |
Electrical | 10/18/2021 | Approved | Indicate on the drawings the size of the grounding electrode conductor and the type(s) of grounding electrode(s) to be used to properly ground the 'new' 112.5kva transformer. NEC Article 250.30 (A) (4) and (5). Refer to the Electrical Riser Diagram shown on sheet E5.0. |
Electrical | 10/18/2021 | Approved | Based on the lack of information provided, the above comments may not constitute a complete list of requested information. Additional design information is required for the county to review for code compliance. Section 109.3 of the Virginia Construction Code. |
Electrical | 11/12/2021 | Approved | In this latest review cycle dated (10-29-2021), regarding pervious electrical comment #4, the designer's response letter indicates that the 112.5kva transformer and 'TS1' electrical panel board are located in 'Electrical Room 130'. However, assuming that this room would be shown on sheet E3.0 (First Floor Electrical Power Plan), there appears to be 'no' room numbers shown. Please indicate on the electrical floor plan the identification of 'Electrical Room 130', and the electrical equipment there in. Section 109.3 of the Virginia Construction Code. |
Electrical | 11/12/2021 | Approved | Newly revised sheet E5.0, now includes the wire size for the primary and secondary side of the 'new' 112.5kva transformer. The transformer secondary conductors are shown to be 500KCMIL (which is rated for 380 amperes) NEC Table 310.15 (B) (16), 75 degree column. Panel board 'TS1', which is being fed by the 500KCMIL conductors has a main circuit breaker rating of 400 amperes. NOTE: transformer secondary conductors 'must' be equal to or greater than the over current protection device at the termination of the secondary conductors. NEC Article 240.21 (C) (2) (1) (b). Refer to sheet E5.2 for the 'TS1' panel board directory. Please clarify. Section 109.3 of the Virginia Construction Code. |
Electrical | 11/12/2021 | Approved | Based on the lack of information provided in this latest review cycle, the above comments may not constitute a complete list of requested information. Additional design information is required for the county to review for code compliance. Section 109.3 of the Virginia Construction Code. |
Electrical | 11/12/2021 | Rejected | In this latest review cycle dated (10-29-2021), regarding pervious electrical comment #4, the designer's response letter indicates that the 112.5kva transformer and 'TS1' electrical panel board are located in 'Electrical Room 130'. However, assuming that this room would be shown on sheet E3.0 (First Floor Electrical Power Plan), there appears to be 'no' room numbers shown. Please indicate on the electrical floor plan the identification of 'Electrical Room 130', and the electrical equipment there in. Section 109.3 of the Virginia Construction Code. |
Electrical | 11/12/2021 | Rejected | Newly revised sheet E5.0, now includes the wire size for the primary and secondary side of the 'new' 112.5kva transformer. The transformer secondary conductors are shown to be 500KCMIL (which is rated for 380 amperes) NEC Table 310.15 (B) (16), 75 degree column. Panel board 'TS1', which is being fed by the 500KCMIL conductors has a main circuit breaker rating of 400 amperes. NOTE: transformer secondary conductors 'must' be equal to or greater than the over current protection device at the termination of the secondary conductors. NEC Article 240.21 (C) (2) (1) (b). Refer to sheet E5.2 for the 'TS1' panel board directory. Please clarify. Section 109.3 of the Virginia Construction Code. |
Electrical | 11/12/2021 | Rejected | Based on the lack of information provided in this latest review cycle, the above comments may not constitute a complete list of requested information. Additional design information is required for the county to review for code compliance. Section 109.3 of the Virginia Construction Code. |
Electrical | 11/12/2021 | Rejected | In this latest review cycle dated (10-29-2021), regarding pervious electrical comment #4, the designer's response letter indicates that the 112.5kva transformer and 'TS1' electrical panel board are located in 'Electrical Room 130'. However, assuming that this room would be shown on sheet E3.0 (First Floor Electrical Power Plan), there appears to be 'no' room numbers shown. Please indicate on the electrical floor plan the identification of 'Electrical Room 130', and the electrical equipment there in. Section 109.3 of the Virginia Construction Code. |
Electrical | 11/12/2021 | Rejected | Newly revised sheet E5.0, now includes the wire size for the primary and secondary side of the 'new' 112.5kva transformer. The transformer secondary conductors are shown to be 500KCMIL (which is rated for 380 amperes) NEC Table 310.15 (B) (16), 75 degree column. Panel board 'TS1', which is being fed by the 500KCMIL conductors has a main circuit breaker rating of 400 amperes. NOTE: transformer secondary conductors 'must' be equal to or greater than the over current protection device at the termination of the secondary conductors. NEC Article 240.21 (C) (2) (1) (b). Refer to sheet E5.2 for the 'TS1' panel board directory. Please clarify. Section 109.3 of the Virginia Construction Code. |
Electrical | 11/12/2021 | Rejected | Based on the lack of information provided in this latest review cycle, the above comments may not constitute a complete list of requested information. Additional design information is required for the county to review for code compliance. Section 109.3 of the Virginia Construction Code. |
Electrical | 11/12/2021 | Approved | In this latest review cycle dated (10-29-2021), regarding pervious electrical comment #4, the designer's response letter indicates that the 112.5kva transformer and 'TS1' electrical panel board are located in 'Electrical Room 130'. However, assuming that this room would be shown on sheet E3.0 (First Floor Electrical Power Plan), there appears to be 'no' room numbers shown. Please indicate on the electrical floor plan the identification of 'Electrical Room 130', and the electrical equipment there in. Section 109.3 of the Virginia Construction Code. |
Electrical | 11/12/2021 | Approved | Newly revised sheet E5.0, now includes the wire size for the primary and secondary side of the 'new' 112.5kva transformer. The transformer secondary conductors are shown to be 500KCMIL (which is rated for 380 amperes) NEC Table 310.15 (B) (16), 75 degree column. Panel board 'TS1', which is being fed by the 500KCMIL conductors has a main circuit breaker rating of 400 amperes. NOTE: transformer secondary conductors 'must' be equal to or greater than the over current protection device at the termination of the secondary conductors. NEC Article 240.21 (C) (2) (1) (b). Refer to sheet E5.2 for the 'TS1' panel board directory. Please clarify. Section 109.3 of the Virginia Construction Code. |
Electrical | 11/12/2021 | Approved | Based on the lack of information provided in this latest review cycle, the above comments may not constitute a complete list of requested information. Additional design information is required for the county to review for code compliance. Section 109.3 of the Virginia Construction Code. |
Electrical | 11/29/2021 | Approved | In this latest review cycle dated (11-19-2021), the designer has correctly addressed all of the previous comments 'except' one. With respect to previous comment #9, the designer has referenced NEC Article 240.4 (B)(3) in his response to this comment. NEC Article 240.4 (B)(3), refers to 'Overcurrent Devices Rated 800 Amperes or Less'. My 'rejection' comment specifically addresses the requirements for 'Transformer Secondary Conductors'. NEC Article 240.21 (C)(2)(1)(b). Therefore, the designer will need to increase the size of the transformer secondary conductors or lower the ampere rating of the 'MCB' located in panel board 'TS1'. NEC Article 90.4 and Section 109.3 of the Virginia Construction Code. |
Electrical | 11/29/2021 | Rejected | In this latest review cycle dated (11-19-2021), the designer has correctly addressed all of the previous comments 'except' one. With respect to previous comment #9, the designer has referenced NEC Article 240.4 (B)(3) in his response to this comment. NEC Article 240.4 (B)(3), refers to 'Overcurrent Devices Rated 800 Amperes or Less'. My 'rejection' comment specifically addresses the requirements for 'Transformer Secondary Conductors'. NEC Article 240.21 (C)(2)(1)(b). Therefore, the designer will need to increase the size of the transformer secondary conductors or lower the ampere rating of the 'MCB' located in panel board 'TS1'. NEC Article 90.4 and Section 109.3 of the Virginia Construction Code. |
Electrical | 11/29/2021 | Approved | In this latest review cycle dated (11-19-2021), the designer has correctly addressed all of the previous comments 'except' one. With respect to previous comment #9, the designer has referenced NEC Article 240.4 (B)(3) in his response to this comment. NEC Article 240.4 (B)(3), refers to 'Overcurrent Devices Rated 800 Amperes or Less'. My 'rejection' comment specifically addresses the requirements for 'Transformer Secondary Conductors'. NEC Article 240.21 (C)(2)(1)(b). Therefore, the designer will need to increase the size of the transformer secondary conductors or lower the ampere rating of the 'MCB' located in panel board 'TS1'. NEC Article 90.4 and Section 109.3 of the Virginia Construction Code. |
Energy | 11/15/2021 | Rejected | Sheet E8.0_ENERGY CODE: EN-1) 11-15-21 - projects may only follow 1 energy code, not pieces
from both VECC and ASHRAE 90.1. According to A.0 Cover Sheet, this project is following
VECC 2018. Re-run Comcheck under VECC 2018. Per VECC C401.2. |
Energy | 11/22/2021 | Rejected | Sheet A0.00_COVER SHEET: EN-2) 11-22-21: ASHRAE 90.1-2016 is the applicable year, as referenced in Chapter C6 of the VECC 2018. |
Energy | 12/01/2021 | Rejected | Sheet E8.0_ENERGY CODE: EN-1) 11-15-21 - projects may only follow 1 energy code, not pieces
from both VECC and ASHRAE 90.1. According to A.0 Cover Sheet, this project is following
VECC 2018. Re-run Comcheck under VECC 2018. Per VECC C401.2. If you choose to stick with ASHRAE 90.1, then you need to use ASH 2016, not ASH 2013. |
Energy | 12/01/2021 | Rejected | Sheet A0.00_COVER SHEET: EN-2) 12-1-21: ASHRAE 90.1-2016 is the applicable year, as referenced in Chapter C6 of the VECC 2018. Revise and resubmit. |
Energy | 12/01/2021 | Rejected | Sheet E8.0_ENERGY CODE: EN-3) 12-1-21 - According to A.0 Cover Sheet, this project is following the code cycle year 2018, which references ASHRAE 90.1-2016. Re-run Comcheck under ASH 2016, not ASH 2013. |
Energy | 12/01/2021 | Rejected | Sheet E8.0_ENERGY CODE: EN-4) 12/1/21 ASHRAE 90.1-2016 Space-By-Space Table 9.6.1 lists ‘vehicular maintenance area’ under the Common Space Type section of the chart, which allows a maximum wattage of 0.56 w/sf. Vehicular maintenance area’ is a more accurate match for the area in the scope of work of lighting revisions than the currently selected ‘workshop’ category, so use the more accurate category in your re-run of Comcheck. As the Comcheck is currently filled out, the allowed lighting wattage is greatly overstated at 1.59 w/sf because the incorrect category was selected. You may choose to select & utilize the Building-Area-Method from Table 9.5.1 which lists Automotive Facility at 0.71 w/sf if desired. The choice is yours. ENSURE |
Energy | 12/01/2021 | Rejected | Sheet E0.0_ELECTRICAL GENERAL INFORMATION: EN-3) 12/1/21 Automatic-On fixtures shall turn on to no more than 50% lighting power. Then manual on for the remainder of the lighting power. Per 9.4.1.1.c. Please revise your note to reflect this requirement. |
Energy | 12/01/2021 | Rejected | Sheet E0.0_ELECTRICAL GENERAL INFORMATION: EN-6) 12/1/21 Manual controls are required by the appropriate category in Table 9.6.1. Limited time over rides for turning on the lights are not the same as full time manual control of the lighting. Indicate on the plans, all floors, the location of required manual and bi-level lighting controls. |
Energy | 12/01/2021 | Rejected | 4. EN-7) 12-1-21 : Resubmission may result in additional comments. Please number your narrative responses with the identical EN-X number indicated in my comments. This significantly reduces the time required for review of your responses. Per VECC 109.4. If you have questions regarding this energy code review, you can contact me via email at lbaskerville@arlingtonva.us, or Facetime/TEAMS/GOOGLEDUO call on my mobile number 703-244-0479. |
Energy | 12/01/2021 | Approved | Sheet E8.0_ENERGY CODE: EN-1) 11-15-21 - projects may only follow 1 energy code, not pieces
from both VECC and ASHRAE 90.1. According to A.0 Cover Sheet, this project is following
VECC 2018. Re-run Comcheck under VECC 2018. Per VECC C401.2. If you choose to stick with ASHRAE 90.1, then you need to use ASH 2016, not ASH 2013. |
Energy | 12/01/2021 | Approved | Sheet A0.00_COVER SHEET: EN-2) 12-1-21: ASHRAE 90.1-2016 is the applicable year, as referenced in Chapter C6 of the VECC 2018. Revise and resubmit. |
Energy | 12/01/2021 | Approved | Sheet E8.0_ENERGY CODE: EN-3) 12-1-21 - According to A.0 Cover Sheet, this project is following the code cycle year 2018, which references ASHRAE 90.1-2016. Re-run Comcheck under ASH 2016, not ASH 2013. |
Energy | 12/01/2021 | Approved | Sheet E8.0_ENERGY CODE: EN-4) 12/1/21 ASHRAE 90.1-2016 Space-By-Space Table 9.6.1 lists ‘vehicular maintenance area’ under the Common Space Type section of the chart, which allows a maximum wattage of 0.56 w/sf. Vehicular maintenance area’ is a more accurate match for the area in the scope of work of lighting revisions than the currently selected ‘workshop’ category, so use the more accurate category in your re-run of Comcheck. As the Comcheck is currently filled out, the allowed lighting wattage is greatly overstated at 1.59 w/sf because the incorrect category was selected. You may choose to select & utilize the Building-Area-Method from Table 9.5.1 which lists Automotive Facility at 0.71 w/sf if desired. The choice is yours. ENSURE |
Energy | 12/01/2021 | Approved | Sheet E0.0_ELECTRICAL GENERAL INFORMATION: EN-3) 12/1/21 Automatic-On fixtures shall turn on to no more than 50% lighting power. Then manual on for the remainder of the lighting power. Per 9.4.1.1.c. Please revise your note to reflect this requirement. |
Energy | 12/01/2021 | Approved | Sheet E0.0_ELECTRICAL GENERAL INFORMATION: EN-6) 12/1/21 Manual controls are required by the appropriate category in Table 9.6.1. Limited time over rides for turning on the lights are not the same as full time manual control of the lighting. Indicate on the plans, all floors, the location of required manual and bi-level lighting controls. |
Energy | 12/01/2021 | Approved | 4. EN-7) 12-1-21 : Resubmission may result in additional comments. Please number your narrative responses with the identical EN-X number indicated in my comments. This significantly reduces the time required for review of your responses. Per VECC 109.4. If you have questions regarding this energy code review, you can contact me via email at lbaskerville@arlingtonva.us, or Facetime/TEAMS/GOOGLEDUO call on my mobile number 703-244-0479. |
Energy | 12/01/2021 | Approved | Sheet E8.0_ENERGY CODE: EN-1) 11-15-21 - projects may only follow 1 energy code, not pieces
from both VECC and ASHRAE 90.1. According to A.0 Cover Sheet, this project is following
VECC 2018. Re-run Comcheck under VECC 2018. Per VECC C401.2. If you choose to stick with ASHRAE 90.1, then you need to use ASH 2016, not ASH 2013. |
Energy | 12/01/2021 | Approved | Sheet A0.00_COVER SHEET: EN-2) 12-1-21: ASHRAE 90.1-2016 is the applicable year, as referenced in Chapter C6 of the VECC 2018. Revise and resubmit. |
Energy | 12/01/2021 | Approved | Sheet E8.0_ENERGY CODE: EN-3) 12-1-21 - According to A.0 Cover Sheet, this project is following the code cycle year 2018, which references ASHRAE 90.1-2016. Re-run Comcheck under ASH 2016, not ASH 2013. |
Energy | 12/01/2021 | Approved | Sheet E8.0_ENERGY CODE: EN-4) 12/1/21 ASHRAE 90.1-2016 Space-By-Space Table 9.6.1 lists ‘vehicular maintenance area’ under the Common Space Type section of the chart, which allows a maximum wattage of 0.56 w/sf. Vehicular maintenance area’ is a more accurate match for the area in the scope of work of lighting revisions than the currently selected ‘workshop’ category, so use the more accurate category in your re-run of Comcheck. As the Comcheck is currently filled out, the allowed lighting wattage is greatly overstated at 1.59 w/sf because the incorrect category was selected. You may choose to select & utilize the Building-Area-Method from Table 9.5.1 which lists Automotive Facility at 0.71 w/sf if desired. The choice is yours. ENSURE |
Energy | 12/01/2021 | Approved | Sheet E0.0_ELECTRICAL GENERAL INFORMATION: EN-3) 12/1/21 Automatic-On fixtures shall turn on to no more than 50% lighting power. Then manual on for the remainder of the lighting power. Per 9.4.1.1.c. Please revise your note to reflect this requirement. |
Energy | 12/01/2021 | Approved | Sheet E0.0_ELECTRICAL GENERAL INFORMATION: EN-6) 12/1/21 Manual controls are required by the appropriate category in Table 9.6.1. Limited time over rides for turning on the lights are not the same as full time manual control of the lighting. Indicate on the plans, all floors, the location of required manual and bi-level lighting controls. |
Energy | 12/01/2021 | Approved | 4. EN-7) 12-1-21 : Resubmission may result in additional comments. Please number your narrative responses with the identical EN-X number indicated in my comments. This significantly reduces the time required for review of your responses. Per VECC 109.4. If you have questions regarding this energy code review, you can contact me via email at lbaskerville@arlingtonva.us, or Facetime/TEAMS/GOOGLEDUO call on my mobile number 703-244-0479. |
EPlan Review | 01/04/2022 | Approved | Approved |
EPlan Review | 03/03/2022 | Approved | Approved |
Mechanical | 10/11/2021 | Rejected | Sheet M1.1: Please correct coded note number 3 and indicate VMC section 504.4 of 2015 or 2018, also add note that screen shall not be installed at the duct termination. |
Mechanical | 10/11/2021 | Approved | Sheet M1.1_SECOND FLOOR MECHANICAL PLAN: Please correct coded note number 3 and indicate VMC section 504.4 of 2015 or 2018, also add note that screen shall not be installed at the duct termination. |
Special Inspection Required | 10/20/2021 | Rejected | Need SSI |
Special Inspection Required | 11/08/2021 | Approved | offlink |
Structural | 10/20/2021 | Rejected | Is the foundation footing work to be done by owner in a different building permit? If so, include the plans in this application. If not, the separate permit will require it's own statement of special inspection. |
Structural | 10/20/2021 | Rejected | The Statement of Special Inspection needs to be filled-in & submitted:
MUST HAVE:
1). OWNER, SIER, SER, GER, & GC Contact information & Signatures, correct permit #, project address.
2). Initialed inspection boxes (applicable inspections) by SER & SIER
3). Owner, SIER, & SER signatures on inspections sheets.
The statement of special inspection is used by the structural engineer of record (SER) to identify the structural items that require special inspection. This is a legal statement that shall be filled out by the Structural Engineer of Record (SER). All applicable item lines of inspection shall be initialed by both the structural engineer of record (SER) and the special inspection engineer of record (SIER). This statement must co |
Structural | 10/20/2021 | Rejected | Provide geotech/soils report if available. |
Structural | 10/20/2021 | Approved | Is the foundation footing work to be done by owner in a different building permit? If so, include the plans in this application. If not, the separate permit will require it's own statement of special inspection. |
Structural | 10/20/2021 | Approved | The Statement of Special Inspection needs to be filled-in & submitted:
MUST HAVE:
1). OWNER, SIER, SER, GER, & GC Contact information & Signatures, correct permit #, project address.
2). Initialed inspection boxes (applicable inspections) by SER & SIER
3). Owner, SIER, & SER signatures on inspections sheets.
The statement of special inspection is used by the structural engineer of record (SER) to identify the structural items that require special inspection. This is a legal statement that shall be filled out by the Structural Engineer of Record (SER). All applicable item lines of inspection shall be initialed by both the structural engineer of record (SER) and the special inspection engineer of record (SIER). This statement must co |
Structural | 10/20/2021 | Approved | Provide geotech/soils report if available. |
Structural | 10/22/2021 | Approved | S-004 missing per S-200 detail. Porvide S-004. |
Structural | 10/22/2021 | Rejected | S-004 missing per S-200 detail. Porvide S-004. |
Zoning | 10/19/2021 | Approved | In sheet A1.01 it is not clear how many parking spaces are available for employees of the service area. The tabulation must show the number of parking spaces for clients and employees. The tandem parking spaces can be counted as additional parking spaces but can't be counted as part of the required parking spaces. |
Zoning | 10/19/2021 | Approved | Provide information of which parking spaces will reserved for customers and employees. |
Zoning | 10/19/2021 | Approved | Provide the dimensions of the drive aisles. |
Zoning | 10/19/2021 | Approved | No signs are approved with this building permit. A sign permit will need to be submitted for the approval of the signs. |
Zoning | 10/19/2021 | Approved | In sheet A1.01 it is not clear how many parking spaces are available for employees of the service area. The tabulation must show the number of parking spaces for clients and employees. The tandem parking spaces can be counted as additional parking spaces but can't be counted as part of the required parking spaces. |
Zoning | 10/19/2021 | Approved | Provide information of which parking spaces will reserved for customers and employees. |
Zoning | 10/19/2021 | Approved | Provide the dimensions of the drive aisles. |
Zoning | 10/19/2021 | Approved | No signs are approved with this building permit. A sign permit will need to be submitted for the approval of the signs. |
Zoning | 10/19/2021 | Rejected | In sheet A1.01 it is not clear how many parking spaces are available for employees of the service area. The tabulation must show the number of parking spaces for clients and employees. The tandem parking spaces can be counted as additional parking spaces but can't be counted as part of the required parking spaces. |
Zoning | 10/19/2021 | Rejected | Provide information of which parking spaces will reserved for customers and employees. |
Zoning | 10/19/2021 | Rejected | Provide the dimensions of the drive aisles. |
Zoning | 10/19/2021 | Rejected | No signs are approved with this building permit. A sign permit will need to be submitted for the approval of the signs. |
Zoning | 10/19/2021 | Approved | In sheet A1.01 it is not clear how many parking spaces are available for employees of the service area. The tabulation must show the number of parking spaces for clients and employees. The tandem parking spaces can be counted as additional parking spaces but can't be counted as part of the required parking spaces. |
Zoning | 10/19/2021 | Approved | Provide information of which parking spaces will reserved for customers and employees. |
Zoning | 10/19/2021 | Approved | Provide the dimensions of the drive aisles. |
Zoning | 10/19/2021 | Approved | No signs are approved with this building permit. A sign permit will need to be submitted for the approval of the signs. |
Zoning | 10/19/2021 | Approved | In sheet A1.01 it is not clear how many parking spaces are available for employees of the service area. The tabulation must show the number of parking spaces for clients and employees. The tandem parking spaces can be counted as additional parking spaces but can't be counted as part of the required parking spaces. |
Zoning | 10/19/2021 | Approved | Provide information of which parking spaces will reserved for customers and employees. |
Zoning | 10/19/2021 | Approved | Provide the dimensions of the drive aisles. |
Zoning | 10/19/2021 | Approved | No signs are approved with this building permit. A sign permit will need to be submitted for the approval of the signs. |