Review | Electrical |
Review Date | 10/09/2017 |
Status | Approved as Noted |
Comments |
Inspector's Note: Per phone conversation with Mr.Khalifa (RDP), he said that the 'new' SE conductors to the new 225 ampere service disconnect (feeding panel board B), will be installed in the slab.This is in reference to the length of 'unfused' SE conductor inside of building. NEC Article 230.70 (A) (1). Riser shown on sheet E00, shows the conductors over head. Also, each service disconnect switch (exisiting and new), must be properly identified per NEC Article 230.2 (E) |
|