Permit Comments Details
 
Permit #B1901790
Address4231 COLUMBIA PIKE
TypeComm Int Alt
StatusFINALED
Permit HolderCAPITOL CONSTRUCTION CORP
OwnerVILLAGE CENTER PARTNERS LLC % ORR PARTNERS
Applied Date06/27/2019
Approved Date08/15/2019
Date Issued08/15/2019
DescriptionNEW INTERIOR CONSTRUCTION FOR A FITNESS STUDIO ON THE GROUND FLOOR OF A NEW MIXED USE BUILDING. NEW HVAC. PLUMBING AND ELECTRICAL FOR FIRS TIME TENANT.

 

 
ReviewElectrical
Review Date07/03/2019
StatusRejected
Comments
COMMERCIAL PLAN REVIEW
All projects are reviewed under the requirements outlined in the Virginia Uniform Statewide Building Code. A written response letter must accompany plan revisions. Please contact the Plan Examiner for any clarification of the comments. A detailed correction letter must be attached to the drawings for re-submittal.
Permit: B1901790        Applicable Code:     2012 VUSBC
Project: Orange        Plan Examiner:     Williams
Address: 4231 Columbia Pike Suite 106        Discipline:      Electrical
Review Date:
7-3-19
        Phone Number:
Email:      703-228-3973
Crawilliams@arlingtonva.us
            
            
            
            
            
            
            
1    
E-1    Indicate on the drawings how this 'new' 200 ampere Electrical Service will be properly grounded. Provide the size of the grounding electrode conductor and the type(s) of grounding electrode(s). NEC Article 250.20 (B), 250.24 (A)(1), and 90.4.    109.3 of the Virginia Construction Code
2
    E-1    Please clarify on the drawings whether, this 'new' 200 ampere Electrical Service is the only service on the existing 1500 ampere Retail Service.    109.3 of the Virginia Construction Code
3        Based on the lack of information provided, additional comments may be forthcoming.    109.3 of the Virginia Construction Code