Review | Structural |
Review Date | 03/10/2016 |
Status | Approved |
Comments |
Structural Review: Approved. | | Special Inspection: Rejected. | | 1. Submit Statement of Special Inspections. | (a.) Download form here(copy+paste): building.arlingtonva.us/resource/special-inspection-pre-construction-manual-2/ | (b.) Complete the cover sheet. Note: Statement will be rejected if SIER or GC information is incomplete. | (c.) The Statement of Special Inspection shall be completed by the SER. In the last column write "SER", "SIER", "TAER" or "N/A" to indicate who will be responsible for each required test and inspection. In the section labeled "Other Inspection", identify any required tests/inspections not listed. | (d.) All parties identified on the cover sheet must sign and date final sheets. | (e.) Owner, SER, and SIER signatures shall be provided on the bottom of each page. | 2. Please submit SER resume, SIER resume, laboratory and technician certifications. | |
|