Permit Comments Details
 

 

 
ReviewEnergy
Review Date06/23/2016
StatusApproved
Comments
Sheet A301 includes detail 2, a wall section that shows the R-values of exterior continuous insulation and roof insulation. However, detail 2 does not call out and label the R-value of the cavity insulation. The 2012 VECC requires a minimum of R-13 cavity insulation in addition to exterior R-13 continuous insulation for steel framed walls. In the resubmission, call out and label the R-value of the cavity insulation in detail 2 on sheet A301.