Review | Building |
Review Date | 06/07/2022 |
Status | Rejected |
Comments |
06/07/2022 In order to be able to analyze whether proposed construction complies with the Virginia uniform statewide building code, construction plans must meet minimum level of completeness. Submitted plans must contain sufficient information for plan reviewers to be able to review the proposed construction work. When submitted plans do not meet a minimum level of completeness, ISD cannot provide detailed rejection comments. | Numerous rejection, incomplete plans, results incomplete review. This isn’t a punch list. These are a few things noticed that points to the need to go back through and re-do. |
|