Building | 08/01/2016 | Approved |
Accessibility Compliance Form not correct. Do not check box #2. The alterations to 115 - 119 are changes to the primary function space. Give the number of accessibility upgrades (ramp landing, bar seating, restrooms) you may want to consider checking item #4 on the form and listing the upgrades and their costs. VRC 410.6.
8/1/16 Do not check box #3 on the form. Room 119 is neither more...
|
Building | 08/01/2016 | Approved |
Clarify which sheet the partition schedule is on. VCC 109.3.
8/1/16 No response. I am looking for details of the wall types ("new full height wall" and "new partial height wall") shown on the floor plan.
|
Building | 06/27/2016 | Approved |
Sheets A21.3, A21.4. The required toe clearance is not provided in the accessible toilet compartments. Where partitions extend to the floor surface, more clear floor space is required. ANSI A117.1, 604.9.5.1.
|
Building | 06/27/2016 | Approved |
Sheets A21.3/4, A22.3/4. Two vertical grab bars are required in each ambulatory toilet compartment. ANSI A117.1, 604.10.
|
Building | 06/27/2016 | Approved |
Sheet A-21.0. Ambulatory toilet compartments must be exactly 36" (not 37") wide. ANSI A117.1, 604.10.
|
Energy | 07/26/2016 | Approved |
NOTE: The "50% exemption" referred to in the review response to the county is found in the 2012 IECC. The governing code is the 2012 VECC, which does not have this language in Chapter 1. Therefore the code requires that these areas be designed and built to satisfy the review comment.
Several rooms appear to require an occupancy sensor that will meet the requirements of section C405.2.2.2 of more...
|
Energy | 07/26/2016 | Approved |
Sheet E0.2 includes an interior lighting COMcheck. This COMcheck does not appear to have been properly completed to demonstrate the project is complying with section C405.5.2 of the 2012 VECC. The COMcheck must include all new lighting and existing lighting to remain for the area that is being altered. The 2012 IECC allows for areas to be exempted from the calculation when less than 50% of the more...
|
Energy | 07/26/2016 | Approved |
NOTE: The "50% exemption" referred to in the review response to the county is found in the 2012 IECC. The governing code is the 2012 VECC, which does not have this language in Chapter 1. Therefore the code requires that these areas be designed and built to satisfy the review comment.
Sheet E0.2 includes an interior lighting COMcheck. This COMcheck does not appear to have been properly more...
|
Energy | 06/27/2016 | Approved |
The sheet numbers on the drawings do not match the sheet numbers given in the uploaded permit submission. For example, the sheet titled "E-001 ELECTRICAL GENERAL NOTES - Electrical - General and Site Information" in the electronic permit review system is titled "E0.2" on the sheet itself. All Energy Permit Review Comments will refer to the name of the sheet that is present on the sheet, rather more...
|
Energy | 06/27/2016 | Approved |
Sheet E0.2 includes an interior lighting COMcheck. This COMcheck does not appear to have been properly completed to demonstrate the project is complying with section C405.5.2 of the 2012 VECC. It appears that the project has used an incorrect method to calculate the total allowed Watts for the project. The floor area that may be used for each area category is the illuminated space, and does not more...
|
Energy | 06/27/2016 | Approved |
The scope of work for lighting that will be removed, existing light to remain and new lighting is not clear. For example, sheet A11.1 shows existing lights to remain. Sheet E10.0 does not show any existing lighting. In addition sheet A30.0 indicates that the meeting rooms will "Remove Light Fixture, prepare for new fixture" but there is no electrical plan that shows the new lighting design. In more...
|
Energy | 06/27/2016 | Approved |
The drawings include several lighting schedules on different sheets. These schedules do not list the total input power of each lighting fixture type. The schedules must list the total input power of each fixture type, including existing fixtures to remain for all spaces where new fixtures will be installed. In the resubmission include an additional column for each lighting schedule that lists more...
|
Energy | 06/27/2016 | Approved |
Sheet T1.0 includes code summary which lists the governing codes of the permit submission. The list of governing codes does not include the 2012 Virginia Energy Conservation Code. In the resubmission, revise sheet T1.0 to include the 2012 Virginia Energy Conservation Code in the list of governing codes.
|
Plumbing | 06/15/2016 | Approved |
P0.1 - Indicates a 3 compartment sink Fixture Connection Sizes, Please provide menu , If no cooking is being performed please indicate. If so please provide Details for Grease Interceptor size and calculations. Seems to be just a bar area, but please confirm.
|
Structural | 06/14/2016 | Approved |
1, Statement of special inspection (SSI) prepared by the structural engineer of record shall be provided. SSI shall be signed by the SER, SIER, GC and owner.
2, The SSI shall cover the special inspection requirements for the steel inspection and the post-installed anchor inspection as listed on the structural general note sheet.
|
Zoning | 06/20/2016 | Approved |
Permit #: B1601505
Project ID: CTBO-1887
Project Name: 1700 Jefferson Davis Hwy
Permit Type: Commercial Alteration
Site Plan: 144
Work Square Footage: 4,679 ft²
Project Description: Interior alterations for the 1st floor lobby common areas, restrooms, meeting rooms and bar area.
Status: Approved
Reviewer: José Gómez
E-mail: jgomez-acevedo@arlingtonva.us
Phone: 703-228-3228
Note: more...
|