Permit #B1702047
Address1119 N HUDSON ST
TypeCTBO
StatusFINALED
Permit HolderTOP SERVICES INC.
OwnerCLARENDON ALLEY LLC % EBR PROP LLC
Applied Date08/15/2017
Approved Date10/25/2017
Date Issued10/25/2017
DescriptionNEW TENANT LAYOUT - RESTUARANT

View Event Log.      View Status.    View Required Plan Review       View Printer Version.

Review   Review       Date Status   Comments   
Accessibility Review06/15/2018No review required --N/A--
Accessibility Review03/19/2018No review required --N/A--
Accessibility Review10/04/2017No review required revision dated 10-2-17
Accessibility Review09/20/2017No review required --N/A--
Accessibility Review09/07/2017Approved ACF marked box #1. VIF
Building06/15/2018Approved as Noted Revision for construction type change to IIIB
Building03/23/2018Approved Active revision, 7 March 2018 Mechanical, Electrical revisions
Building10/10/2017Approved Resubmittal, 2 October 2017 Electrical, Mechanical
Building09/29/2017Approved revisions to patio roof, shortening it. some structural changes to patio structure signed and sealed by xiaoyin zhang 029548
Building09/07/2017Approved --N/A--
DES:Water/Sewer Engineering06/15/2018Approved ACTIVE REVISION NO PLUMBING
DES:Water/Sewer Engineering04/05/2018Approved ACTIVE REVISION - NO PLUMBING
DES:Water/Sewer Engineering10/25/2017Approved CTBO INT ALT ALL DFUS COUNTED AND APPROVED 4 DFU CREDITS
DHS: Health Plan Review09/22/2017Approved --N/A--
DHS: Health Plan Review08/24/2017Rejected --N/A--
Electrical06/15/2018No review required --N/A--
Electrical03/19/2018Approved Revisons dated 3-7-18.
Electrical10/09/2017Approved as Noted Inspector's Note: Per phone conversation with Mr.Khalifa (RDP), he said that the 'new' SE conductors to the new 225 ampere service disconnect (feeding panel board B), will be installed in the slab.This is in reference to the length of 'unfused' SE conductor inside of building. NEC Article 230.70 (A) (1). Riser shown on sheet E00, shows the conductors over head. Also, each service disconnect switch  more...
Electrical09/20/2017Rejected COMMERCIAL PLAN REVIEW All projects are reviewed under the requirements outlined in the Virginia Uniform Statewide Building Code. A written response letter must accompany plan revisions. Please contact the Plan Examiner for any clarification of the comments. A detailed correction letter must be attached to the drawings for re-submittal. Permit: B1702047 Applicable Code: 2012  more...
Electrical08/21/2017Rejected COMMERCIAL PLAN REVIEW All projects are reviewed under the requirements outlined in the Virginia Uniform Statewide Building Code. A written response letter must accompany plan revisions. Please contact the Plan Examiner for any clarification of the comments. A detailed correction letter must be attached to the drawings for re-submittal. Permit: B1702047 Applicable Code: 2012  more...