Permit #B1802993
Address1550 CRYSTAL DR
TypeCADD
StatusFINALED
Permit HolderTHE WHITING-TURNER CONTRACTING COMPANY
OwnerCESC SQUARE LLC %JBG SMITH PROPERTIES
Applied Date10/26/2018
Approved Date06/24/2019
Date Issued06/24/2019
DescriptionNEW ADDITION OF A MOVIE THEATER, A RETAIL EXTENSION TO ACCOMMODATE A GROCERY STORE AND OTHER RWTAIL STORES, ALTERATIONS TO EXISTING G-1 - G-4 AND PLAZA LEVELS. **

View Event Log.      View Status.    View Required Plan Review       View Printer Version.

Review   Review       Date Status   Comments   
Bike Review01/30/2019Approved Sheet 0G1-01-03 - GENERAL PROJECT INFORMATION: BR-1 cannot be closed because the two calculation tables were not removed as requested. Those ratios are completely irrelevant to this approval. The required numbers are stated explicitly in the approved conditions. If you wish to show bicycle parking requirements, you can show the approved condition language and those specific approved required  more...
Bike Review01/30/2019Approved Sheet A5-101-B - G2 LEVEL - ENLARGED BIKE ROOM PLAN & ELEVATIONS: remove note that says information is contained on 0G1-02-03, because that was removed and placed on this sheet instead.
Bike Review01/30/2019Approved Sheet A5-101-B - G2 LEVEL - ENLARGED BIKE ROOM PLAN & ELEVATIONS: BR-3 cannot be closed because I still cannot find either approvable manufacturer's specifications for each rack depicted, and/or the County's standard specification sheets 8.0-8.3. There is a note on this sheet about an equipment legend, but I could not find this.
Bike Review11/21/2018Approved Sheet 0G1-01-03 - GENERAL PROJECT INFORMATION: The site plan conditions for this project SP 90, Central District Retail Phase 1, do not use ratios for the bike parking numbers in both Conditions #19B.9 and #24. Therefore the bicycle calculation is not necessary on this sheet since those numbers do not apply. It would be more helpful have a table that lists required bike parking spaces for both  more...
Bike Review11/21/2018Approved Sheet A1-103-B - CONSTRUCTION PLANS - G2 LEVEL -SECTOR B: Please label the total number of bike parking spaces in the room, also label each of the type of bike racks shown the room. Also label the lockers if those are being included in the bike room, as well as well as how many are being provided.
Bike Review11/21/2018Approved Sheet A1-103-B - CONSTRUCTION PLANS - G2 LEVEL -SECTOR B: Please show enlarged detail of the room that includes locker measurements and dimensions - also include locker specifications to show they meet the minimum dimension requirements of 12"x18"x36".
Bike Review11/21/2018Approved Sheet A1-103-B - CONSTRUCTION PLANS - G2 LEVEL -SECTOR B: The wall material appears to be concrete based on sheet 0G5-04-03, but please confirm and label on this sheet.
Bike Review11/21/2018Approved Sheet A1-103-B - CONSTRUCTION PLANS - G2 LEVEL -SECTOR B: Please include a sheet showing the bike rack details and installation specifications from the vendor, this would ideally also include an enlarged detail of the bike room and room measurements. Also please note that 30% of racks in the room must be horizontal and floor level. It's unclear right now without knowing the type of racks being  more...
Bike Review11/21/2018Approved Sheet A1-103-B - CONSTRUCTION PLANS - G2 LEVEL -SECTOR B: Sheet P2.2 from the 4.1 submission and mentioned in the site plan conditions shows four proposed cargo bike parking spaces that were intended for grocery store customers. Are those going to be included in a separate plan submission? I realize the where they were located on P2.2 is outside of the plan of work for this submission, but wanted  more...
Building12/08/2020Approved Sheet 0G6-01-03 - DOOR_HARDWARE SCHEDULES: Door 03-103-B - single step with a maximum riser height of 7 inches. 1003.5 Exception 1 VUSBC 2015.
Building10/07/2020Approved Sheet 0G0-00-03 - COVER: Refer to Sheet G3-01B-03 for fire analysis certifying suitability of structural foam for use in this building
Building07/17/2020Approved Sheet A3-102-A - BUILDING SECTIONS - RETAIL: A copy of UL fireproofing assembly for structural steel shall be available onsite for Field Inspection
Building07/17/2020Approved Sheet 0G5-01-03 - PARTITION TYPE DETAILS: Refer to MOD190044 for approval of 3-hr horizontal rated assembly
Building06/12/2020Approved Sheet 0G5-04-03 - PARTITION TYPE DETAILS: Detail 19 (Horizontal assembly) is incorrect. One or two supporting wall(s) are required. I am not aware of any horizontal assembly not requiring at least one wall for support. Provide a copy of the assembly you use
Building06/12/2020Approved Sheet 0G5-01-03 - PARTITION TYPE DETAILS: AER-09038 assembly requires 1 or 2 wall support
Building06/12/2020Approved Sheet 0G6-01-03 - DOOR_HARDWARE SCHEDULES: Doors 02-102-B, 02-104-B1, 02-105B and 02-145-B had hardware changed to locksets. These are theater exterior exit doors. Panic hardware is required
Building06/12/2020Approved General - Foam insulation is indicated to be used at raised slab (topping) locations. geofoam cannot be used as a structural element. Foam insulation only permitted for for sound or thermal purposes.
Building06/12/2020Approved Sheet A3-102-A - BUILDING SECTIONS - RETAIL: Provide UL assembly for fireproofing
Building06/12/2020Approved Sheet A1-105-B - CONSTRUCTION PLANS - LEVEL 02 -SECTOR B: Provide UL assembly for horizontal rated soffit at stair 2
Building06/11/2020Approved Sheet A7-106-B - CENTRAL STAIR SECTION - THEATER: Stair cannot be permitted/ finaled without a hand and guard rail.