Permit #B1902211
Address4060 CAMPBELL AVE
TypeCTBO
StatusFINALED
Permit HolderK B R CORPORATION
OwnerSTREET RETAIL INC DIR OF PROP ANALYSIS
Applied Date08/09/2019
Approved Date11/19/2019
Date Issued11/19/2019
DescriptionINTERIOR ALTERATIONS TO EXISTING CVS STORE AND EXTERIOR FACADE RENOVATIONS - APPROVED ADMIN CHANGE - ZADM190408. SPECIAL INSPECTIONS REQUIRED.

View Event Log.      View Status.    View Required Plan Review       View Printer Version.

Review   Review       Date Status   Comments   
Building08/22/2019Approved Sheet 0CS-Cover Sheet: SUBMIT FIRE ALARM SHOP DRAWINGS FOR APPROVAL
Building08/22/2019Approved Sheet 0CS-Cover Sheet: SEPARATE PLAN AND PERMIT REQUIRED FOR DOORS WITH SPECIAL LOCKING HARDWARE
Building08/22/2019Approved Sheet 0CS-Cover Sheet: SUBMIT AUTOMATIC SUPPRESSION SHOP DRAWINGS FOR APPROVAL
DES:Water/Sewer Engineering05/04/2020Approved active revision for framing changes only
DES:Water/Sewer Engineering09/23/2019Approved CTBO INT ALT OF A CVS 17 NEW DFUS CONFIRMED PER COMMENT LETTER FROM BUILDER FIXTURES TO BE COUNTED AS NEW
Electrical05/26/2020No review required No change in resubmission. Approved at earlier submission.
Electrical 08/20/2019Approved There is a reference to the NEC 2005 code, 2011 NEC code and a 2014 NEC, please provide the appropriate code year.
Energy 10/22/2019Approved EN-3) comment dated 10-22-19: Please number your narrative responses with the identical EN-X number indicated in my comments. This significantly reduces the time required for review of your responses. Per VECC 109.4.
Energy 10/22/2019Approved EN-6) comment dated 10-22-19: The previous comment has not been addressed. ******************************************** EN-6) comment dated 9-24-19: The Comcheck analysis is not correctly filled out. You selected the space by space method and associated wattage value for the retail sales area (1.6 w/sf), but applied a much larger square footage than the retail area SF listed on the cover  more...
Energy 10/22/2019Approved EN-2) comment dated 10-22-19: Resubmittal may result in additional comments . If you have questi...
Energy 10/22/2019Approved EN-5) comment dated 10-22-19: this comment has not been responded to. If the air barrier is to be created by the polyisocyanurate insulation, it will need to be called out as the air barrier, and it will need to be foil faced, per section C402.4.1.2.1, and any penetrations will need to be treated to maintain the air barrier per the manufacturer's requirements. If the air barrier is to be  more...
Energy 09/24/2019Approved EN-8) comment dated 8-23-19: Sheet M1.2 rooftop unit schedule - list on the schedule the IEER in addition to the EER that is provided, so that I can confirm the units meet the Table C403.2.3(1).
Energy 08/23/2019Approved EN-9) comment dated 8-23-19: Sheet M1.2 rooftop schedule - coordinate the total MBH of the RTU's with the size listed on the roof plan M1.3, so that I know which size units I am confirming the efficiency of. Per VECC 109.4.
Energy 08/23/2019Approved EN-4) comment dated 8-23-19: Detail 4/A5.1 & on Partitoin Type F on sheet A1.1.- state on the detail the R-value of the insulation, so that I can confirm it meets Table C402.2.
Energy 08/23/2019Approved EN-7) comment dated 8-23-19: Sheet E1.1 Lighting Plan - clarify what device provides the occupancy / vacancy sensor function in the managers office, the restrooms, the employee room, and the hall. There is no symbol on the legend explaining the Switch sub 'S'. Add symbols to the legend as necessary to clarify that the device providing occupancy/vacancy sensor function.
Energy 08/23/2019Approved EN-1) comment dated 8-23-19: Sheet A7.1 Window schedule - List on the window and door schedule the Air Infiltration Rate, the U-factor, and the SHGC value of all the NEW fenestration (windows and doors) in the Building thermal Envelope, so compliance with sections C402.4.3 and C402.3.3 can be determined.
Environmental Services08/20/2019Approved Sheet AD-1.1-Demolition Plan: The demo plan doesn't indicate any plumbing fixtures being removed but the P1 note indicates that fixtures will b removed. Please note how many will be removed or if it's a replacement like for like. Contact Aja Moody for any questions 703-228-0777
EPlan Review06/04/2020Approved ACT REV
EPlan Review11/19/2019Approved --N/A--
Fire Prevention05/26/2020No review required Sprinkler & fire alarm submission deffered, to be submitted as shop drawings