Permit #B1902272
Address5183 LEE HWY
TypeCTBO
StatusFINALED
Permit HolderARLINGTON RIDGE CONSTRUCTION GROUP INC
OwnerGARDEN CITY SHOPPING CENTER L P % ALLAN BERMAN
Applied Date08/15/2019
Approved Date12/02/2019
Date Issued12/03/2019
DescriptionINTERIOR ALTERATION TO AN EXISTING SPACE FOR A NEW TENANT TO INCLUDE A NEW RESTROOM, NEW ELECTRICAL WORK, MODIFICATIONS TO THE EXISTING HVAC SYSTEM, AND INSTALLATION OF AN ABOVE GROUND MODULAR SPA.

View Event Log.      View Status.    View Required Plan Review       View Printer Version.

Review   Review       Date Status   Comments   
Building11/21/2019Approved Sheet A-001 - Swim Box plans: Refer to Section 2406.4.6 and see note on the plan. Confirm window adjacent to Door 01 meets safety glazing requirements. Tempered / laminated glass or a railing/ barrier at the interior face adjacent to the ramp is required.
Building10/21/2019Approved Sheet A-001 - Swim Box plans: Door 04 requires 10" bottom rail
Building10/21/2019Approved Sheet A-001 - Swim Box plans: Door 01 hardware to Comply with 1010.1.9.3. Provide signage as required and locking device is to be readily distinguishable as locked
Building10/21/2019Approved Sheet A-001 - Swim Box plans: See note on plan. Vertical grab bar per A117.1, Section 608.3.1.2 is required for transfer shower
Building08/28/2019Approved Sheet A-001 - Swim Box plans: Refer to Section 1110.4.13 and A117.1, Section 1109. Accessible pool entry required
Building08/28/2019Approved Sheet A-001 - Swim Box plans: Refer to section 1003.5. Your ramp requires either handrails or contrasting floor finish materials
Building08/28/2019Approved Sheet A-001 - Swim Box plans: Door No. 1. The bottom rail of this door is required to be min. 10" h. (A117.1, Section 404.2.9 and the thumbturn needs to be extended arm accessible thumbturn to comply with section 1010.1.9.2
Building08/28/2019Approved Sheet A-001 - Swim Box plans: Refer to elevation 6 - Please include that total distance from wall face to edge of sink to be 60" min.
Building08/28/2019Approved Sheet A-001 - Swim Box plans: Refer to A117.1, Section 803.4 and 903. An accessible bench is required in changing room
Building08/28/2019Approved Sheet A-001 - Swim Box plans: Refer To A117.1, Section 606.2. Your kitchenette sink needs 48" parallel approach centered on sink since doors provided on cabinetry limiting forward approach. Attaching toekick to the cabinet door is not considered accessible
DES:Water/Sewer Engineering08/29/2019Approved INTERIOR ALTERATION TO AN EXISTING SPACE FOR A NEW TENANT TO INCLUDE A NEW RESTROOM, NEW ELECTRICAL WORK, MODIFICATIONS TO THE EXISTING HVAC SYSTEM, AND INSTALLATION OF AN ABOVE GROUND MODULAR SPA.***APPROVED FOR 6.00 NEW DFUS
Energy 10/23/2019Approved Sheet A-001 has been revised to indicate that a new entrance door is part of the scope of the permit. This door must meet the minimum air infiltration, U-factor, and Solar Heat Gain Coefficient (SHGC) requirements of the 2012 VECC. Tables C402.3 and C402.5.2 of the 2012 VECC require a maximum allowable air infiltration rate of 0.20 CFM/SF, a maximum allowable U-factor of 0.77 and a maximum  more...
EPlan Review12/03/2019Approved --N/A--
EPlan Review12/02/2019Approved --N/A--
Plumbing 10/21/2019Approved 8-26-19 Please provide details for pump room and any and all connections to the Aquatic Vessel and any drainage connection. 2015 ispsc. 10-21-19 Thank you for addressing Aquatic vessel comment. Plans seem to indicate a new trench drain and a new floor drain. Please provide sanitary riser and venting for all new Plumbing.
Plumbing 08/26/2019Approved 8-26-19 Please provide Occp Count. 2015 VPC 403 required fixtures.
Plumbing 08/26/2019Approved 8-26-19 Please provide dimensions and grab bar heights and dimensions for shower and restrooms.
Public Health Division10/22/2019Approved Sheet Comments - 2019 10-10 - Response to Letter for CTBO-8545: Describe the term "siphoning water to trench drain". Does the trench drain go to sanitary sewer?
Public Health Division10/22/2019Approved Sheet Comments - 2019 10-10 - Response to Letter for CTBO-8545: Show water volume and turnover time. Confirm a 15 minute turnover time, per Arlington County Water Recreational Facility Code for spas.
Public Health Division10/22/2019Approved Sheet Comments - 2019 10-10 - Response to Letter for CTBO-8545: Confirm the presence of dual main drains. Confirm that main drains and other suction outlets are VGB approved.