Permit #B1903152
Address3336 WILSON BLVD
TypeCNEW
StatusACTIVE
Permit HolderPROJECT BUILDERS INC
Owner3336 WILSON BOULEVARD LLC
Applied Date11/01/2019
Approved Date12/05/2021
Date Issued12/06/2021
DescriptionNEW BUILDING FOR **CVS**

View Event Log.      View Status.    View Required Plan Review       View Printer Version.

Review   Review       Date Status   Comments   
Building02/13/2020Approved Sheet A-190-Schedules and Details: Automatic sliding doors 1 and 10 shall comply with 2015 VUSBC 1010.1.4.2 and BHMA A156.10.
Building02/13/2020Approved Sheet A-190-Schedules and Details: Automatic sliding doors 1 and 10 shall comply with 2015 VUSBC 1010.1.4.2 and BHMA A156.10.
Building02/13/2020Approved Sheet A-190-Schedules and Details: Automatic sliding doors 1 and 10 shall comply with 2015 VUSBC 1010.1.4.2 and BHMA A156.10.
Building11/18/2019Approved Sheet A-190-Schedules and Details: I cannot locate the hardware schedule. Please provide schedule on plans. Door hardware 01 is required to break away. 2015 VUSBC 1010.1.4.2
Building11/18/2019Approved Sheet A-190-Schedules and Details: G2 and G6 glazing in sliding doors and adjacent fixed panels should be tempered per 2015 VUSBC section 2406.4.
Building11/18/2019Approved Sheet A-130-Entry Plan, Elevations and Details: Confirm if fixed glass panels at entry vestibule are within the 24 inch arc as measured from vertical edge of door, whereby the glazing will need to be tempered. 2015 VUSBC 2406.4.2
Building11/18/2019Approved Sheet A-180-Enlarged Plans, Details and Elevations: Provide detail on plan as to how drinking fountains will comply with 2009 A117.1 section 307.2 Protrusion Limits and cane protection. The low fountain may comply however the higher fountain may not (height from bottom of unit greater than 27"). An equipment skirt or built element may be necessary.
Building11/18/2019Approved Sheet A-190-Schedules and Details: I cannot locate the hardware schedule. Please provide schedule on plans. Door hardware 01 is required to break away. 2015 VUSBC 1010.1.4.2
Building11/18/2019Approved Sheet A-190-Schedules and Details: G2 and G6 glazing in sliding doors and adjacent fixed panels should be tempered per 2015 VUSBC section 2406.4.
Building11/18/2019Approved Sheet A-180-Enlarged Plans, Details and Elevations: Provide detail on plan as to how drinking fountains will comply with 2009 A117.1 section 307.2 Protrusion Limits and cane protection. The low fountain may comply however the higher fountain may not (height from bottom of unit greater than 27"). An equipment skirt or built element may be necessary.
Building11/18/2019Approved Sheet A-130-Entry Plan, Elevations and Details: Confirm if fixed glass panels at entry vestibule are within the 24 inch arc as measured from vertical edge of door, whereby the glazing will need to be tempered. 2015 VUSBC 2406.4.2
Building11/18/2019Approved Sheet A-190-Schedules and Details: I cannot locate the hardware schedule. Please provide schedule on plans. Door hardware 01 is required to break away. 2015 VUSBC 1010.1.4.2
Building11/18/2019Approved Sheet A-190-Schedules and Details: G2 and G6 glazing in sliding doors and adjacent fixed panels should be tempered per 2015 VUSBC section 2406.4.
Building11/18/2019Approved Sheet A-130-Entry Plan, Elevations and Details: Confirm if fixed glass panels at entry vestibule are within the 24 inch arc as measured from vertical edge of door, whereby the glazing will need to be tempered. 2015 VUSBC 2406.4.2
Building11/18/2019Approved Sheet A-180-Enlarged Plans, Details and Elevations: Provide detail on plan as to how drinking fountains will comply with 2009 A117.1 section 307.2 Protrusion Limits and cane protection. The low fountain may comply however the higher fountain may not (height from bottom of unit greater than 27"). An equipment skirt or built element may be necessary.
DES:Engineering10/09/2020Approved DEMO BUILDING AND BUILD NEW CVS 19 NEW DFUS NO EXISTING FIXTURES SHOWN WATER METER TO REMAIN
DES:Water/Sewer Engineering01/05/2022Approved ACTIVE REVISION. STRUCTURAL CHANGES ONLY. NO PLUMBING. APPROVED
DES:Water/Sewer Engineering10/09/2020Approved DEMO BUILDING AND BUILD NEW CVS 19 NEW DFUS NO EXISTING FIXTURES SHOWN WATER METER TO REMAIN
Electrical11/22/2019Approved Provide Roof top rec per NEC 2014, Article 210.63
Electrical11/22/2019Approved Provide show window receptacle per NEC 2014, Article 210.62