Building | 08/11/2021 | Approved |
Sheet A-611 OPENING SCHEDULE: SEPARATE PLAN AND PERMIT REQUIRED FOR DOORS WITH SPECIAL LOCKING HARDWARE ***Plan sheet comment, No response required
|
Building | 08/11/2021 | Approved |
Sheet A-611 OPENING SCHEDULE: SEPARATE PLAN AND PERMIT REQUIRED FOR DOORS WITH SPECIAL LOCKING HARDWARE ***Plan sheet comment, No response required
|
Building | 08/11/2021 | Approved |
Sheet A-611 OPENING SCHEDULE: SEPARATE PLAN AND PERMIT REQUIRED FOR DOORS WITH SPECIAL LOCKING HARDWARE ***Plan sheet comment, No response required
|
Building | 08/11/2021 | Approved |
Sheet A-611 OPENING SCHEDULE: SEPARATE PLAN AND PERMIT REQUIRED FOR DOORS WITH SPECIAL LOCKING HARDWARE ***Plan sheet comment, No response required
|
Building | 08/11/2021 | Approved |
Sheet A-611 OPENING SCHEDULE: SEPARATE PLAN AND PERMIT REQUIRED FOR DOORS WITH SPECIAL LOCKING HARDWARE ***Plan sheet comment, No response required
|
Building | 07/01/2021 | Approved |
Sheet A-456 COOLER FREEZER: Detail 7 shows pressure treated plywood. This building is required to have non combustible partition construction. The plywood attached to the studs would need to be non-combustible or FRT in compliance with VCC 603.
|
Building | 07/01/2021 | Rejected |
Sheet A-456 COOLER FREEZER: Detail 7 shows pressure treated plywood. This building is required to have non combustible partition construction. The plywood attached to the studs would need to be non-combustible or FRT in compliance with VCC 603.
|
Building | 07/01/2021 | Approved |
Sheet A-456 COOLER FREEZER: Detail 7 shows pressure treated plywood. This building is required to have non combustible partition construction. The plywood attached to the studs would need to be non-combustible or FRT in compliance with VCC 603.
|
Building | 07/01/2021 | Approved |
Sheet A-456 COOLER FREEZER: Detail 7 shows pressure treated plywood. This building is required to have non combustible partition construction. The plywood attached to the studs would need to be non-combustible or FRT in compliance with VCC 603.
|
Building | 07/01/2021 | Approved |
Sheet A-456 COOLER FREEZER: Detail 7 shows pressure treated plywood. This building is required to have non combustible partition construction. The plywood attached to the studs would need to be non-combustible or FRT in compliance with VCC 603.
|
Building | 07/01/2021 | Approved |
Sheet A-456 COOLER FREEZER: Detail 7 shows pressure treated plywood. This building is required to have non combustible partition construction. The plywood attached to the studs would need to be non-combustible or FRT in compliance with VCC 603.
|
Building | 06/28/2021 | Approved |
Sheet A-611 OPENING SCHEDULE: Unable to locate door hardware schedule within this plan set. Please provide location information or submit door hardware schedule.
|
Building | 06/28/2021 | Approved |
Sheet A-456 COOLER FREEZER: Is this wood blocking? If so it will need to be FRT.
|
Building | 06/28/2021 | Approved |
Sheet A-454 COOLER FREEZER PLANS: Coolers/freezers shall comply with VCC 603 #26 and 2603.4.1.2. Plan sheet note. No response required if coolers/freezers are compliant with the referenced codes.
|
Building | 06/28/2021 | Approved |
Sheet A-000G COVERSHEET:
SUBMIT AUTOMATIC SUPPRESSION
SHOP DRAWINGS FOR APPROVAL
SUBMIT FIRE ALARM SHOP
DRAWINGS FOR APPROVAL***** plan sheet comment, no response required.
|
Building | 06/28/2021 | Approved |
Sheet A-611 OPENING SCHEDULE: Unable to locate door hardware schedule within this plan set. Please provide location information or submit door hardware schedule.
|
Building | 06/28/2021 | Approved |
Sheet A-456 COOLER FREEZER: Is this wood blocking? If so it will need to be FRT.
|
Building | 06/28/2021 | Approved |
Sheet A-454 COOLER FREEZER PLANS: Coolers/freezers shall comply with VCC 603 #26 and 2603.4.1.2. Plan sheet note. No response required if coolers/freezers are compliant with the referenced codes.
|
Building | 06/28/2021 | Approved |
Sheet A-000G COVERSHEET:
SUBMIT AUTOMATIC SUPPRESSION
SHOP DRAWINGS FOR APPROVAL
SUBMIT FIRE ALARM SHOP
DRAWINGS FOR APPROVAL***** plan sheet comment, no response required.
|
Building | 06/28/2021 | Approved |
Sheet A-611 OPENING SCHEDULE: Unable to locate door hardware schedule within this plan set. Please provide location information or submit door hardware schedule.
|