Building | 02/15/2022 | Approved |
Sheet Accessibility Compliance Form: Per communication with RDP via 02/14/2020 email and phone call 02/15/2020, Box one is selected. Otherwise please resubmit with the appropriate box selected.
|
Building | 02/15/2022 | Approved |
Sheet A-103-Dimensioned Floor Plan: See Code Modification CMOD21-00060 for modification to accessible route provision. for the Cryo chamber.
|
Building | 02/14/2022 | Approved |
Sheet A-300-Enlarged Restroom and Elevations: Per Accessibility Standard ICC A-117.1-2009 Sect. 608.2.1.2 - A clearance of 48” minimum in length measured perpendicular from the control wall, and 36” minimum in depth shall be provided adjacent to the open face oof the compartment.
Referenced Sheet: A-1.1, A-2.1
|
Building | 02/14/2022 | Approved |
Sheet A-000-Cover Sheet: NOTE:
SUBMIT AUTOMATIC SUPPRESSION
SHOP DRAWINGS FOR APPROVAL
SUBMIT FIRE ALARM SHOP
DRAWINGS FOR APPROVAL
|
Building | 11/10/2021 | Additional |
Plan review cycle ended and plans returned at submitter's request to complete upload.
Please upload a completed Accessibility Compliance Form and the Asbestos Inspections and Awareness Forms
|
Building | 11/10/2021 | Approved |
Plan review cycle ended and plans returned at submitter's request to complete upload.
Please upload a completed Accessibility Compliance Form and the Asbestos Inspections and Awareness Forms
|
Building | 10/18/2021 | Approved |
Approved with the Following General Comment for ALL Powered Furniture and Millwork: Millwork at the Reception Desk appears to be constructed with electrical outlets Built-in to them. We review these like Wall Partitions. As such all wood framing and blocking provided within the framing cavity shall be Fire-Retardant Treated (FRT) Wood per VCC, Section 603.1.1 #1.1; as required for Types I & II more...
|
Building | 10/18/2021 | Additional |
Approved with the Following General Comment for ALL Powered Furniture and Millwork: Millwork at the Reception Desk appears to be constructed with electrical outlets Built-in to them. We review these like Wall Partitions. As such all wood framing and blocking provided within the framing cavity shall be Fire-Retardant Treated (FRT) Wood per VCC, Section 603.1.1 #1.1; as required for Types I & II more...
|
Building | 10/18/2021 | Approved |
Approved with the Following General Comment for ALL Powered Furniture and Millwork: Millwork at the Reception Desk appears to be constructed with electrical outlets Built-in to them. We review these like Wall Partitions. As such all wood framing and blocking provided within the framing cavity shall be Fire-Retardant Treated (FRT) Wood per VCC, Section 603.1.1 #1.1; as required for Types I & II more...
|
Building | 09/24/2021 | Rejected |
Sheet A-601-Millwork Elevations: Approved with the Following General Comment for ALL Powered Furniture and Millwork: Millwork at the Reception Desk appears to be constructed with electrical outlets Built-in to them. We review these like Wall Partitions. As such all wood framing and blocking provided within the framing cavity shall be Fire-Retardant Treated (FRT) Wood per VCC, Section 603.1.1 #1.1; more...
|
Building | 09/24/2021 | Rejected |
Approved with the Following General Comment for ALL Powered Furniture and Millwork: Millwork at the Reception Desk appears to be constructed with electrical outlets Built-in to them. We review these like Wall Partitions. As such all wood framing and blocking provided within the framing cavity shall be Fire-Retardant Treated (FRT) Wood per VCC, Section 603.1.1 #1.1; as required for Types I & II more...
|
Building | 09/24/2021 | Approved |
Sheet A-601-Millwork Elevations: Approved with the Following General Comment for ALL Powered Furniture and Millwork: Millwork at the Reception Desk appears to be constructed with electrical outlets Built-in to them. We review these like Wall Partitions. As such all wood framing and blocking provided within the framing cavity shall be Fire-Retardant Treated (FRT) Wood per VCC, Section 603.1.1 #1.1; more...
|
Building | 09/24/2021 | Approved |
Sheet A-601-Millwork Elevations: Approved with the Following General Comment for ALL Powered Furniture and Millwork: Millwork at the Reception Desk appears to be constructed with electrical outlets Built-in to them. We review these like Wall Partitions. As such all wood framing and blocking provided within the framing cavity shall be Fire-Retardant Treated (FRT) Wood per VCC, Section 603.1.1 #1.1; more...
|
Building | 09/24/2021 | Additional |
Sheet A-601-Millwork Elevations: Approved with the Following General Comment for ALL Powered Furniture and Millwork: Millwork at the Reception Desk appears to be constructed with electrical outlets Built-in to them. We review these like Wall Partitions. As such all wood framing and blocking provided within the framing cavity shall be Fire-Retardant Treated (FRT) Wood per VCC, Section 603.1.1 #1.1; more...
|
Building | 08/19/2021 | Approved |
Sheet A-601-Millwork Elevations: Approved with the Following General Comment for ALL Powered Furniture and Millwork: Millwork at the Reception Desk appears to be constructed with electrical outlets Built-in to them. We review these like Wall Partitions. As such all wood framing and blocking provided within the framing cavity shall be Fire-Retardant Treated (FRT) Wood per VCC, Section 603.1.1 #1.1; more...
|
Building | 08/19/2021 | Approved |
Approved with the Following General Comment for ALL Powered Furniture and Millwork: Millwork at the Reception Desk appears to be constructed with electrical outlets Built-in to them. We review these like Wall Partitions. As such all wood framing and blocking provided within the framing cavity shall be Fire-Retardant Treated (FRT) Wood per VCC, Section 603.1.1 #1.1; as required for Types I & II more...
|
DES:Water/Sewer Engineering | 08/25/2021 | Approved |
15 NEW DFU'S
|
Energy | 10/01/2021 | Additional |
The electrical light fixture schedule does not state the “total input power” (Watts) of each light fixture type. This value must be stated on the lighting schedule to validate the lighting COMcheck calculations that demonstrate compliance with section C405.4 of the 2015 VECC. In the resubmission, revise the lighting schedule to state the total input power (Watts) of each fixture type.
|
Energy | 10/01/2021 | Approved |
The electrical light fixture schedule does not state the “total input power” (Watts) of each light fixture type. This value must be stated on the lighting schedule to validate the lighting COMcheck calculations that demonstrate compliance with section C405.4 of the 2015 VECC. In the resubmission, revise the lighting schedule to state the total input power (Watts) of each fixture type.
|
Energy | 10/01/2021 | Approved |
The electrical light fixture schedule does not state the “total input power” (Watts) of each light fixture type. This value must be stated on the lighting schedule to validate the lighting COMcheck calculations that demonstrate compliance with section C405.4 of the 2015 VECC. In the resubmission, revise the lighting schedule to state the total input power (Watts) of each fixture type.
|
1 2 3 4 5 |