Permit #B2200722
Address2025 CLARENDON BLVD
TypeCNEW
StatusAPPLIED
Permit HolderCONTRACTOR TBD
OwnerGS DIV CLARENDON PROPERTY OWNING LLC% GREYSTAR
Applied Date04/08/2022
Approved Date 
Date Issued 
DescriptionNEW CONSTRUCTION OF A 16-STORY, 231-UNIT APARTMENT BUILDING WITH A ROOFTOP IN-GROUND POOL.

View Event Log.      View Status.    View Required Plan Review       View Printer Version.

Review   Review       Date Status   Comments   
Bike Review06/27/2022Rejected Sheet A3-51 - ENLARGED PLAN -LOADING DOCK & PARKING RAMP: Comment response says the locker and shower for retail employees are provided on the first floor in proximity to the bike storage room. Indicate locker and shower locations and locker dimensions on this sheet. 2 lockers are required per County requirements.
Bike Review06/27/2022Rejected Sheet A3-51 - ENLARGED PLAN -LOADING DOCK & PARKING RAMP: Label rack type and dimensions and show vertical clearance if using vertical or double-decker racks.
Bike Review06/27/2022Rejected Sheet A3-54 - ENLARGED PLANS -BIKE STORAGE: For G2 SE bike storage room, it indicates space for 134 bikes but only shows a total of 132 spaces: 13 Saris stretch racks for 10 bikes each (130 total) and 2 one-sided racks. Sheet A2-01 FLOOR PLAN LEVEL G2 says there should be a total of 133, so the number indicated on this sheet seems incorrect.
Bike Review06/27/2022Rejected Sheet A3-54 - ENLARGED PLANS -BIKE STORAGE: Bike parking matrix on other sheets says there are 6 accessible bike racks on G2, but only 5 indicated (3 in NE bike storage and 2 in SE bike storage). Show location of 6th accessible rack.
Bike Review04/20/2022Rejected Sheet A2-01 - FLOOR PLAN -LEVEL G2: Provide dimensioned detail call-out drawing for each interior Class 1 bike parking area. Detail drawing will show the proposed room or cage walls, wall material, door and door material, cage wall and/or door security plates or strike guard (as appropriate), door lock type, the dimensions between the racks, dimension from racks to the walls and other  more...
Bike Review04/20/2022Rejected Sheet A2-01 - FLOOR PLAN -LEVEL G2: Provide construction drawing/spec/cut sheets for all proposed bike rack products to be used, consistent with the County's Bike Parking Standards. Arlington County’s bike parking standards guide is available online, but email smcgraw@arlingtonva.us for a link to the guidance if you need it.
Bike Review04/20/2022Rejected Sheet A2-02 - FLOOR PLAN -LEVEL G1: Provide dimensioned detail call-out drawing for each interior Class 1 bike parking area. Detail drawing will show the proposed room or cage walls, wall material, door and door material, cage wall and/or door security plates or strike guard (as appropriate), door lock type, the dimensions between the racks, dimension from racks to the walls and other  more...
Bike Review04/20/2022Rejected Sheet A2-02 - FLOOR PLAN -LEVEL G1: Provide construction drawing/spec/cut sheets for all proposed bike rack products to be used, consistent with the County's Bike Parking Standards. Arlington County’s bike parking standards guide is available online, but email smcgraw@arlingtonva.us for a link to the guidance if you need it.
Bike Review04/20/2022Rejected Sheet A2-02 - FLOOR PLAN -LEVEL G1: Please indicate which room the employee bike parking space(s) required for use by retail employees will be located in. Please indicate if the required locker(s) will also be part of that room.
Bike Review04/20/2022Rejected Sheet A2-01 - FLOOR PLAN -LEVEL G2: Provide dimensioned detail call-out drawing for each interior Class 1 bike parking area. Detail drawing will show the proposed room or cage walls, wall material, door and door material, cage wall and/or door security plates or strike guard (as appropriate), door lock type, the dimensions between the racks, dimension from racks to the walls and other  more...
Bike Review04/20/2022Rejected Sheet A2-01 - FLOOR PLAN -LEVEL G2: Provide construction drawing/spec/cut sheets for all proposed bike rack products to be used, consistent with the County's Bike Parking Standards. Arlington County’s bike parking standards guide is available online, but email smcgraw@arlingtonva.us for a link to the guidance if you need it.
Bike Review04/20/2022Rejected Sheet A2-02 - FLOOR PLAN -LEVEL G1: Provide dimensioned detail call-out drawing for each interior Class 1 bike parking area. Detail drawing will show the proposed room or cage walls, wall material, door and door material, cage wall and/or door security plates or strike guard (as appropriate), door lock type, the dimensions between the racks, dimension from racks to the walls and other  more...
Bike Review04/20/2022Rejected Sheet A2-02 - FLOOR PLAN -LEVEL G1: Provide construction drawing/spec/cut sheets for all proposed bike rack products to be used, consistent with the County's Bike Parking Standards. Arlington County’s bike parking standards guide is available online, but email smcgraw@arlingtonva.us for a link to the guidance if you need it.
Bike Review04/20/2022Rejected Sheet A2-02 - FLOOR PLAN -LEVEL G1: Please indicate which room the employee bike parking space(s) required for use by retail employees will be located in. Please indicate if the required locker(s) will also be part of that room.
Bike Review04/20/2022Additional Sheet A2-02 - FLOOR PLAN -LEVEL G1: Provide dimensioned detail call-out drawing for each interior Class 1 bike parking area. Detail drawing will show the proposed room or cage walls, wall material, door and door material, cage wall and/or door security plates or strike guard (as appropriate), door lock type, the dimensions between the racks, dimension from racks to the walls and other  more...
Bike Review04/20/2022Additional Sheet A2-02 - FLOOR PLAN -LEVEL G1: Provide construction drawing/spec/cut sheets for all proposed bike rack products to be used, consistent with the County's Bike Parking Standards. Arlington County’s bike parking standards guide is available online, but email smcgraw@arlingtonva.us for a link to the guidance if you need it.
Bike Review04/20/2022Additional Sheet A2-02 - FLOOR PLAN -LEVEL G1: Please indicate which room the employee bike parking space(s) required for use by retail employees will be located in. Please indicate if the required locker(s) will also be part of that room.
Bike Review04/20/2022Additional Sheet A2-01 - FLOOR PLAN -LEVEL G2: Provide dimensioned detail call-out drawing for each interior Class 1 bike parking area. Detail drawing will show the proposed room or cage walls, wall material, door and door material, cage wall and/or door security plates or strike guard (as appropriate), door lock type, the dimensions between the racks, dimension from racks to the walls and other  more...
Bike Review04/20/2022Additional Sheet A2-01 - FLOOR PLAN -LEVEL G2: Provide construction drawing/spec/cut sheets for all proposed bike rack products to be used, consistent with the County's Bike Parking Standards. Arlington County’s bike parking standards guide is available online, but email smcgraw@arlingtonva.us for a link to the guidance if you need it.
Building07/01/2022Rejected General Comment: Structure-borne Sound – How are you addressing the 50 STC minimum impact isolation class requirement between dwelling units and/or sleeping units per ASTM E492? (2015 VCC, 1207.03)